Colorado and Southern Railway

Colorado and Southern Railway
Colorado and Southern Railway
System map
Schematic map of C&S lines
Reporting mark C&S, CS
Locale Colorado
Dates of operation 1898–1981
Successor Burlington Northern
Track gauge 1,435 mm (4 ft 8 12 in)
Previous gauge 3 ft  (914 mm)
C&S Steam locomotive #71 1941.
C&S Engine 641, the line's last operating standard-gauge steam locomotive, used on the Climax-Leadville run until 1962. On display in Leadville; photo 2010.

The Colorado and Southern Railway (reporting marks C&S, CS) was a railroad company in the western United States that operated independently from 1898 to 1908, then as part of the Chicago, Burlington and Quincy Railroad until it was absorbed into the Burlington Northern Railroad in 1981.

The railway began as the consolidation of bankrupt railroads on 1898. The Colorado Central Railroad and Cheyenne and Northern Railway were brought together to form the Union Pacific, Denver and Gulf Railway in 1890. When Union Pacific went bankrupt in 1893 they were separated from the Union Pacific and united with the Denver, Leadville and Gunnison Railway and others, by Frank Trumbull to form the Colorado and Southern Railroad in 1898. In 1908 the Chicago, Burlington and Quincy Railroad bought control of the C&S. It would later merge into the Burlington Northern Railroad in 1981.

Contents

Narrow gauge

The Colorado and Southern narrow gauge lines were formed in 1898 from the Colorado Central and the Denver, South Park and Pacific Railroads. The narrow gauge had four distinct lines. The Platte Canyon Line from Denver, Colorado to Como, Colorado, The Gunnison Line from Como to Gunnison, Colorado via Alpine Tunnel, Highline between Como and Leadville, Colorado, and the Clear Creek line from Denver to Silver Plume, Colorado. Major Branch lines ran were the Baldwin branch between Gunnison and Baldwin, Keystone from Dickey, Colorado to Keystone, Colorado, Blackhawk branch between Forks Creek and Central City, Colorado, The Alma Branch from Como to Alma, Colorado, and the Morrison Branch from Denver to Morrison, Colorado. The Colorado and Southern narrow gauge never owned a brand new engine, all motive power was from former roads.

Downfall of the narrow gauge

The Colorado and Southern narrow gauge was slowly abandoned piece by piece for 33 years between 1910 and 1943. The first line to close was part of the Gunnison Line between Hancock and Quartz. This included Alpine Tunnel, rail was not removed until the 1940s though. The isolated track between Quartz and Gunnison and Gunnison to Baldwin was leased and later sold to the Denver and Rio Grande Western Railroad. Quartz to Gunnison survived until 1936 and the Baldwin Branch lasted until 1954. The next line to be ripped up was between Garos and Buena Vista, Colorado. This left another isolated line between Buena Vista and Hancock which was abandoned four years later. Also in 1926 the Morrison Branch was removed. In 1931 part of the Blackhawk branch between Central City, Colorado and Blackhawk, Colorado was removed. Times were tough during the Great depression and by the end the narrow gauge was worn out. What was left of the former Denver South Park & Pacific between Denver and Leadville including the Alma branch and Keystone branch was removed in the Summer of 1938 excluding a short 14 mile segment between Leadville and Climax, Colorado and Denver and Waterton, Colorado. The next line to fall was between Silver Plume and Idaho Springs, Colorado in 1939. This included the famous Georgetown Loop. In 1941 the last of the Clear Creek lines began being torn up in May of that year between Golden, Colorado and Idaho Springs. This included the Blackhawk branch. The dual gauge third rail that allowed narrow gauge trains to run between Denver and Golden was also removed. The segment between Denver and Golden still exists today to serve the Coors Brewery. Most of the track was removed from Waterton to Chatfield, Colorado in 1942 and the rest was converted to standard gauge, ending all narrow gauge service out of Denver. The last narrow gauge operation between Leadville and the Climax mines was converted to standard gauge due to heavy traffic from World War II. The last Colorado and Southern narrow gauge train, pulled by engine 76, ran the 28 mile roundtrip on August 25, 1943. The next day standard gauge trains began hauling the load. The C&S narrow gauge was now part of history.

Narrow gauge today

Not much of the narrow gauge survives today. Today there are five surviving Locomotives, C&S #31 is at the Colorado Railroad Museum painted as Denver Leadville and Gunnison 191, C&S #71 (pictured above) is on display in Central City, Colorado, C&S #9 is soon to be on display in Breckenridge, Colorado, C&S #60 is on display in Idaho Springs, Colorado, and C&S #74 is under restoration and will be on display in Boulder, Colorado in the future. Two roundhouses survive in Como, Colorado and Leadville, Colorado. Rolling stock has been scattered across the US. Some are on display in Colorado, One mail car found its way to Nebraska, and some boxcars are on the White Pass and Yukon Railroad in Alaska. Remaining Water towers are the French Gulch tank near Leadville, Bakers tank near Breckenridge, and Halfway tank near Alpine Tunnel. The Georgetown Loop was rebuilt in the 1980s and can be ridden in the summer months.

Predecessor railroads

The following lines were consolidated between 1890 and 1900 to form the C&S:

  • Denver, Marshall and Boulder Railway
  • Denver and Middle Park Railroad
  • Denver, Texas and Fort Worth Railroad
  • Denver, Texas and Gulf Railroad
  • Georgetown, Breckenridge and Leadville Railway
  • Greeley, Salt Lake and Pacific Railway
  • Leadville Mineral Belt Railway
  • Road Canon Railroad
  • Union Pacific, Denver and Gulf Railway

See also

  • Gilpin tramway
  • Former C.&S. Ry. Freight Cars Shipped To the White Pass In 1943
  • Existing White Pass Freight Cars and Selected On-Rail Maintenance Equipment - Includes 4 ex-C.&S. Ry. Cars Still Operating
  • Existing White Pass Car Bodies Disconnected from Trucks - Includes 8 ex-C.&S. Ry. Car Bodies

References

  • Overton, Richard C. (1965). Burlington Route, a History of the Burlington Lines. Knopf. 
  • Drury, George H. (1991). The Historical Guide to North American Railroads. Kalmbach Publishing Co.. ISBN 0-89024-072-8. 

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Colorado and Southern Railway — Le Colorado and Southern Railway (sigle AAR: C S, CS) était un chemin de fer américain de classe I localisé dans le Colorado. Il conserva son indépendance de 1898 à 1908, puis devint une filiale du Chicago, Burlington and Quincy Railroad jusqu en …   Wikipédia en Français

  • Colorado and Southern Railway — Logo Colorado &am …   Deutsch Wikipedia

  • Colorado and Wyoming Railway — Fondé en 1899, le Colorado and Wyoming Railway (C W) est une filiale de l Oregon Steel Mills. Il transporte du charbon, du minerais, et des produits de la métallurgie sur environ 8 km de voie entre l Oregon Steel Mills situé à Pueblo et ses… …   Wikipédia en Français

  • Cheyenne and Northern Railway — The Cheyenne and Northern Railway was a railroad in the U.S. state of Wyoming. The railroad was incorporated in 1886 to build a line from Cheyenne, Wyoming into northern Wyoming and Montana. The line extended 125 miles (201 km) to Wendover… …   Wikipedia

  • Fort Worth and Denver Railway — Fort Worth and Denver s Colorado Special rolls through the Texas Panhandle (1929) …   Wikipedia

  • Fort Worth and Denver Railway — Le Fort Worth and Denver Railway (sigle AAR: FWD), surnommé the Denver Road, était un chemin de fer américain de classe I qui opérait dans le nord du Texas de 1881 à 1982. Il eut une forte influence sur le peuplement et le développement… …   Wikipédia en Français

  • Greeley, Salt Lake and Pacific Railway — The Greeley, Salt Lake and Pacific Railway was a railroad that operated in northern Colorado in the United States during the 1880s. Founded with heavy backing with the Union Pacific Railroad, it was controlled by the Union Pacific from its… …   Wikipedia

  • Southern Railway 4501 — Southern Railway #4501 on display in 2006 Power type Steam Builder Baldwin Locomotive Works Serial number 37085 Build date …   Wikipedia

  • Southern Railway North Avenue Yards Historic District — U.S. National Register of Historic Places U.S. Historic district …   Wikipedia

  • Colorado Springs and Cripple Creek District Railway — Locale Colorado Dates of operation 1897–1920 Track ga …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”