marks=The Canadian Northern Railway (CNoR) is a historic Canadian railway.
Manitoba beginnings
CNoR had its start in the independent branchlines that were being constructed in
Manitoba in the 1880s and 1890s as a response to themonopoly exercised byCanadian Pacific Railway (CPR). Many of thesebranchline s were built with the sponsorship of the provincial government, which sought to subsidize local competition to the federally subsidized CPR; however, significant competition was also provided by the encroachingNorthern Pacific Railway (NPR) from the south.Two of these branchline contractors, William Mackenzie and
Donald Mann , took control of the bankrupt "Lake Manitoba Railway and Canal Company" in January, 1896. Mackenzie and Mann expanded their enterprise, in 1897, by building further north into Manitoba's Interlake district as well as east and west of Winnipeg. They also began building and buying lines south to connect the U.S. border atPembina, North Dakota , and east toOntario .Connecting the Prairies to the Lakehead
The Canadian Northern Railway was established, in 1899, and all railway companies owned by Mackenzie and Mann (primarily in Manitoba) were consolidated into the new entity. CNoR's first step toward competing directly with CPR came at the turn of the century with the decision to build a line linking the Prairie Provinces with
Lake Superior at the harbour in Port Arthur-Fort William (modernThunder Bay, Ontario ) which would permit the shipping of western grain to European markets as well as the transport of eastern Canadian goods to the West. This line incorporated an existing CNoR line toLake of the Woods and two local Ontario railways, thePort Arthur, Duluth and Western Railway and theOntario and Rainy River Railway whose charters Mackenzie and Mann had acquired in 1897. To reach Port Arthur which became the lake terminus of the CNoR, the line extended south of Lake of the Woods into northernMinnesota before heading northeast through Rainy River District to the head of navigation on theGreat Lakes . The Winnipeg-Port Arthur line was completed onDecember 30 ,1901 with the last spike being driven just east of Atikokan station by Ontario's Commissioner of Crown Lands,Elihu J. Davis .Throughout this time, Mackenzie and Mann had been busy expanding their prairie branch line network to feed the connection to Port Arthur. This network expanded in subsequent years to cover most parts of the prairies.
In 1914, the Canadian Northern Railway bought a 150 acre homestead north of Winnipeg on the shores of Lake Winnipeg. They purchased the land in order to develop a resort on Grand Beach.
Going it alone
In 1903, the federal government and
Grand Trunk Railway (GTR) were seeking a 2ndtranscontinental railway for Canada and approached Mackenzie and Mann to seek their co-operation. This effort was spurned and GTR and the federal government would go on to form a system composed of theGrand Trunk Pacific Railway (GTPR) and theNational Transcontinental Railway (NTR).Nationwide expansion
Mackenzie and Mann began their first significant expansion outside of the prairies with the purchase of Great Lakes steamships, railways into northern
Quebec 's Saguenay region and the acquisition of branchlines in southwesternNova Scotia (the H&SW) and westernCape Breton Island . Other acquisitions were insouthern Ontario and a connecting line was built from Toronto to Parry Sound.In 1905, CNoR reached the newly formed provincial capital at
Edmonton, Alberta . In 1908, a line was built east from a connection atCapreol, Ontario on the Toronto-Parry Sound line to Ottawa and on to Montreal. In 1910 a direct Toronto-Montreal line was built, as well as the start of construction on the line west of Edmonton throughYellowhead Pass to Vancouver, thanks to subsidies provided by the government ofBritish Columbia . In 1911, federal funding was made available for construction of the line from Montreal-Ottawa-Capreol-Port Arthur.In 1912, with GTR and CPR holding the ideal southern routes around
Mount Royal to downtown Montreal, CNoR started building a double-tracked mainline north by building theMount Royal Tunnel under the mountain.Obstacles in the Rockies
CNoR's initial expansion in the 1890s and 1900s had been relatively frugal, largely by acquiring bankrupt companies or finishing failed construction projects. By the 1910s, significant expenses were adding up from the construction north or Lake Superior and the
Mount Royal Tunnel , but the largest costs were from building on "the wrong side" of the Thompson and Fraser rivers in the mountains of British Columbia. CPR already had trackage on the desirable eastern side, leading to the port of Vancouver, forcing CNoR to blast tunnels and ledges out of these canyons.The most infamous construction folly on the CNoR in British Columbia happened in 1913, when blasting for a passage for the railway at Hells Gate triggered an enormous
landslide which partially blocked the narrow swift-flowing Fraser River. The resulting damage to Pacificsalmon runs took decades to reverse by the governmental construction of fishways.In addition to difficult construction between Jasper and Vancouver, CNoR started construction west of Edmonton in 1910, fully two years later than GTPR, which had started construction east from Prince Rupert in the
Skeena River , leading to Yellowhead Pass.Financial trouble and nationalization
The last spike of the CNoR transcontinental railway was driven
January 23 ,1915 , atBasque, British Columbia . Freight and passenger service north of Lake Superior also started in 1915, resulting in a system between Montreal and Vancouver, with lines in Nova Scotia, Southern Ontario, Minnesota, and onVancouver Island . Between 1915 and 1918, CNoR tried desperately to increase profits during the height of conflict in the First World War when the majority of wartime traffic was moving on CPR. The company was also saddled with ongoing construction costs associated with theMount Royal Tunnel project.CNoR was heavily indebted to banks and governments, and its profitable branchlines in the prairie provinces — "Canada's breadbasket" — would not generate enough revenue to cover construction costs in other areas. Unable to repay construction costs, the company requested financial aid. In exchange for funds, the federal government gained majority control of shares and CNoR was
nationalized onSeptember 6 ,1918 , when the directors of CNoR, including Mackenzie and Mann, resigned. The replacement board of directors appointed by the federal government forced CNoR to assume the management of federally ownedCanadian Government Railways (CGR). OnDecember 20 ,1918 , a Privy Council order directed CNoR and CGR to be managed under the monikerCanadian National Railway (CNR) as a means to simplify funding and operations, although CNoR and CGR would not be formally merged and cease corporate existence untilJanuary 20 ,1923 , the date that CNR was formally consolidated.Significant portions of the old CNoR system survive under
CN (as the CNR has been known since 1960); for example:
* theMount Royal Tunnel and suburban line toDeux-Montagnes, Quebec
* the line fromMontreal (Pointe-aux-Trembles ) northeast toSaguenay, Quebec
* the CN main line north and west fromToronto toLonglac, Ontario , about 900 km east ofWinnipeg
* the CN main line from theYellowhead Pass southwest toVancouver .The majority of CN's former CNoR branchline network across Canada has either been abandoned or sold to shortline operators. An important U.S. subsidiary of CNoR, theDuluth, Winnipeg and Pacific Railway , forms part of a key CN connection betweenChicago andWinnipeg .