- North–South and East–West Corridor
-
North–South and East–West Corridor
National highways with the north–south (red) and east–west (green) corridors highlightedRoute information Length: 7,300 km (4,500 mi) North–South Length: 4,000 km (2,000 mi) North end: Srinagar Major
junctions:NH 1A, NH 1, NH 2, NH 3, NH 75, NH 26, NH 7, NH 47 South end: Kanyakumari East–west Length: 3,300 km (2,100 mi) East end: Silchar Major
junctions:NH 54, NH 36, NH 37, NH 31, NH 31C, NH 57, NH 28, NH 25, NH 76, NH 14, NH 15, NH 8A, NH 8B West end: Porbandar Highway system Indian Road Network
National • Expressways • State
State Highways in ¬The North-South–East-West Corridor (NS-EW) is the largest ongoing highway project in India. It is the second phase of the National Highways Development Project (NHDP), and consists of building 7300 kilometers of four/six lane expressways connecting Srinagar, Kanyakumari, Porbandar and Silchar, at a cost of US$12.317 billion (at 1999 prices). As of September 2010[update], 5258 of 7300 km project has been completed.[1]
The NS–EW project is managed by the National Highways Authority of India under the Ministry of Road, Transport and Highways.
Contents
Route
Only National Highways are used in the two corridors.
- North–South Corridor (4,000 kilometres (2,500 mi)): NH 1A (Srinagar–Jalandhar), NH 1 (Jalandhar – Delhi), NH 2 (Delhi–Agra), NH 3 (Agra–Gwalior), NH 75 (Gwalior–Jhansi), NH 26 (Jhansi–Lakhnadon), NH 7 (Lakhnadon–Kanyakumari), NH 47 (Salem–Coimbatore–Kochi)
- East-West Corridor (3,300 kilometres (2,100 mi)): NH 8B (Porbandar–Rajkot), NH 8A (Rajkot–Samakhiali), NH 15 (Samkhiali–Radhanpur), NH 14 (Radhanpur–Pindwara), NH 76 (Pindwara – Shivpuri), NH 25 (Shivpuri–Lucknow), NH 28 (Lucknow–Muzaffarpur), NH 57 (Muzaffarpur–Darbhanga Purnia), NH 31 (Purnia–Galgalia), NH 31C (Galgalia–Bijni), NH 31 (Bijni–Guwahati), NH 37 (Guwahati–Nagaon), NH 36 (Nagaon–Dabaka), NH 54 (Dabaka–Silchar)
Interchange points between the corridors
- The following four stretches are common between the Golden Quadrilateral and the NS-EW Corridors.
- Delhi–Agra: Golden Quadrilateral & North–South Corridor
- Bangalore–Krishnagiri: Golden Quadrilateral & North–South Corridor
- Sikandra–Kanpur: Golden Quadrilateral & East–West Corridor
- Udaipur–Chittorgarh: Golden Quadrilateral & East–West Corridor
- The following is an interchange section
- Salem–Coimbatore–Kochi: North–South Corridor & North–south Corridor Extension
- Jhansi is the junction of North–South and East–West Corridors.
Major cities
North-South Corridor East-West Corridor (From North to South) (From West to East) Current status
Segment Total Length Length Completed Under Implementation Length to be Awarded Percent Completed(%) As of (date) North–South & East–West Corridor 7,300 km (4,500 mi) 5,831 km (3,623 mi) 891 km (554 mi) 420 km (260 mi) 79.87 September 30, 2011[1] See also
- List of National Highways in India by highway number
- List of National Highways in India
- National Highways Development Project
- Golden Quadrilateral
- Transport in India
References
External links
Indian Highways Network National Expressways NE 1 • NE 2
State Expressways Mumbai-Pune • Delhi-Gurgaon • DND Flyway • Bengaluru-Mysore • Chennai HSCTC • Hyderabad Elevated ExpresswaysNational Highways 1 • 1A • 1B • 1C • 1D • 2 • 2A • 3 • 4 • 4A • 4B • 5 • 5A • 6 • 7 • 7A • 8 • 8A • 8B • 8C • 8D • 8E • 9 • 10 • 11 • 11A • 11B • 12 • 12A • 13 • 14 • 15 • 16 • 17 • 17A • 17B • 18 • 19 • 20 • 21 • 21A • 22 • 23 • 24 • 24A • 24B • 25 • 25A • 26 • 26A • 27 • 28 • 28A • 28B • 28C • 29 • 30 • 30A • 31 • 31A • 31B • 31C • 31D • 32 • 33 • 34 • 35 • 36 • 37 • 37A • 38 • 39 • 40 • 41 • 42 • 43 • 44 • 44A • 45 • 45A • 45B • 45C • 46 • 47 • 47A • 47B • 47C • 48 • 49 • 50 • 51 • 52 • 52A • 52B • 53 • 54 • 54A • 55 • 56 • 57 • 57A • 58 • 59 • 59A • 60 • 60A • 61 • 62 • 63 • 64 • 65 • 66 • 67 • 68 • 69 • 70 • 71 • 71A • 71B • 72 • 72A • 73 • 73A • 74 • 75 • 76 • 77 • 78 • 79 • 79A • 80 • 81 • 82 • 83 • 84 • 85 • 86 • 86A • 87 • 88 • 89 • 90 • 91 • 91A • 92 • 93 • 94 • 95 • 96 • 97 • 98 • 99 • 100 • 101 • 102 • 103 • 104 • 105 • 106 • 107 • 108 • 109 • 110 • 111 • 112 • 113 • 114 • 116 • 117 • 119 • 121 • 123 • 125 • 126 • 127 • 128 • 129 • 150 • 151 • 152 • 153 • 154 • 155 • 200 • 201 • 202 • 203 • 203A • 204 • 205 • 206 • 207 • 208 • 209 • 210 • 211 • 212 • 213 • 214 • 214A • 215 • 216 • 217 • 218 • 219 • 220 • 221 • 222 • 223 • 224 • 226 • 227 • 228 • 229 • 234 • 235State Highways Andhra Pradesh • Arunachal Pradesh • Assam • Bihar • Chhattisgarh • Goa • Gujarat • Haryana • Himachal Pradesh • Jammu and Kashmir • Jharkhand • Karnataka • Kerala • Madhya Pradesh • Maharashtra • Manipur • Meghalaya • Mizoram • Nagaland • Orissa • Punjab • Rajasthan • Sikkim • Tamil Nadu • Tripura • Uttarakhand • Uttar Pradesh • West BengalNotable National Highways Development Project • Golden Quadrilateral • North–South and East–West CorridorCategories:- North–South and East–West Corridor
- Indian National Highways
Wikimedia Foundation. 2010.