- Chennai HSCTC
-
Chennai High Speed Circular Transportation Corridors Route information Length: 107.795 km (66.981 mi) Existed: 2009 – present History: First corridor: Chennai Port - Maduravoyal Corridor; scheduled for completion in 2013 Location Major cities: Chennai Highway system Indian Road Network
National • Expressways • StateChennai High Speed Circular Transportation Corridors (HSCTC) is an urban road transit in the form of elevated concentric beltways planned for the city of Chennai. The beltways are envisaged as an elevated 2-tier system with design speed of 80 km/h. The top tier is a 2-lane dedicated corridor for the Chennai BRTS system. The second tier is a 4-lane road for 4-wheelers (no buses and autos).[1]
Beltways
4 beltways have been proposed which covers a distance of 107.795 km. A connectivity corridor is also proposed to integrate the beltways with the ECR elevated expressway.
Beltway 1
Beltway 1 is the outermost beltway encompassing an area of 167 km2. It is formed by the following corridors.
- Adyar Corridor
- Chennai Bypass#
- North Buckingham Canal Corridor
- Central Buckingham Canal Corridor
Beltway 2
This beltway encompasses an area of 52 km2. It is formed by the following corridors.
- Adyar Corridor
- Chennai Bypass#
- Chennai Port - Maduravoyal Expressway#
Beltway 3
This beltway encompasses an area of 30 km2. It is formed by the following corridors.
- Adyar Corridor
- Inner Ring Road Corridor
- Chennai Port - Maduravoyal Expressway#
Beltway 4
The beltway 4 is formed by the following corridors.
- Adyar Corridor
- Mambalam Canal Corridor
Integrating beltways with elevated expressways
- Connectivity Corridor
# Already under construction by NHAI
Corridor Details
These 4 beltways can be broken down into 9 corridors.
Name Type Along/Across From To via Length (km) Cost in INR crores (Estimated) Status Developed by Completion Adyar Corridor Elevated 2-tier Corridor Southern Banks of Adyar River Thiru-vi-ka Bridge Porur Nandambakkam 15.845 1430 Proposed Adyar Poonga Trust 2013 (estimated) Port-Maduravoyal Corridor Elevated Corridor Banks of Cooum River Chennai Port Maduravoyal 19 1655[2]/2090[3] Under Construction[4][5] NHAI 2012 Chennai Bypass Corridor Fully access-controlled at grade 4-lane corridor with 2-lane elevated BRTS corridor along the median Tambaram Manali Maduravoyal 32 Under Construction NHAI 2010 North Buckingham Canal Corridor Elevated Corridor Western Bank of Buckingham Canal, Wall Tax Road, Poonamallee Hight Road, Flag Staff Road Manali Oil Refinery Road (MORR) War Memorial Chennai Central 12.3 740 Proposed Adyar Poonga Trust Central Buckingham Canal Corridor Elevated Corridor Western Bank of Buckingham Canal Swami Sivananda Salai Radhakrishnan Salai 2.860 170 Proposed Adyar Poonga Trust Connectivity Corridor Elevated Corridor ECR Elevated Expressway, Santhome bypass road, Santhome High Road, Greenways Road Radhakrishnan Salai Thiru-vi-ka Bridge Foreshore Estate 5.140 350 Proposed Adyar Poonga Trust Mambalam Canal Corridor Elevated Corridor Mambalam Canal Adyar Corridor G.N. Chetty Road Anna Salai, South Usman Road, Venkatnarayana Road, Theyagaraya Road 5.000 195 Proposed Adyar Poonga Trust Inner Ring Road Corridor At-grade 8-lane Corridor Inner Ring Road Jafferkhan Bridge Koyambedu Ashok Nagar 5.95 25 At-grade corridor coz of elevated corridor 2 of Chennai Metro that is under construction along the same alignment. Adyar Poonga Trust East Coast Elevated Expressway Elevated Corridor East Coast Light House ECR Besant Nagar 9.7 430* (1st Phase) Proposed[6] Tamil Nadu State Highways 2013 (estimated) Entire HSCTC 107.795 5400# * Revised cost during tender process # Excluding cost of Chennai Bypass Corridor
Chennai Port - Maduravoyal Corridor [19 km]
Main article: Chennai Port - Maduravoyal ExpresswayThis 19 km corridor is implemented under Phase-VII [7] of National Highways Development Project by NHAI. The pre-construction work has already begun.
Chennai Bypass Corridor [32 km]
Main article: Chennai BypassThe Chennai bypass Corridor is a 32 km fully access controlled at-grade corridor. A 2-lane elevated BRTS corridor is proposed along the median of the Phase II of this expressway. The corridor is under construction.
Adyar Corridor [15.845 km]
Section I
- Thiru-vi-ka Bridge (Km 0+000) to Nandambakkam Bridge (Km 11+100)
- 11.100 km
- Along Southern bank of Adayar River
Section II
- Nandambakkam Bridge (Km 11+100) to Chennai Bypass (Km 15+845)
- 4.845 km
- Along Mount – Poonamalee Road
North Buckingham Canal Corridor [12.3 km]
Section I
- Manali Oil Refinery Road (Km 0+000) to Basin Bridge (Km 8+400)
- 8.400 km
- Along Western bank of Buckingham Canal
Section II
- Basin Bridge (Km 8+400) to Central Station (Km 10+900)
- 2.500 km
- Along Wall Tax Road
Section III
- Central Station (Km 10+900) to Muthuswamy Bridge (Km 11+400)
- 0.500 km
- Along Poonamalee High Road
Section IV
- Muthuswamy Bridge (Km 11+400) to war Memorial (Km 12+300)
- 0.900 km
- Along Flag Staff Road
Central Buckingham Canal Corridor [2.860 km]
- Swami Sivananda Salai (Km 0+000) to Radhakrishna Salai (Km 2+860)
- Along Western bank of Buckingham Canal
Inner Ring Road Corridor [5.9 km]
- Jafferkhanpet Bridge (Km 0+000) to Koyambedu (Km 5+950)
- Along Inner Ring Road (IRR)
Mambalam Canal Corridor [5 km]
- Adayar River (Km 0+000) to G.N Chetty Road (Km 5+000)
- Along Mambalam Canal
Connectivity Corridor [5.140 km]
- Radhakrisha Salai (Km 0+000) to Thiru-vi-ka Bridge (Km 5.140)
- Along ECR Elevated Expressway from Light House till Foreshore Estate, Santhome Bypass Road, Santhome High Road, Greenways Road
East Coast Elevated Expressway [9.7 km]
Main article: East Coast Elevated ExpresswayThis is 9.7 km elevated expressway along the east coast of Bay of Bengal from Light House, Chennai to East Coast Road via Besant Nagar.
Interchanges
A total of 15 interchanges has been proposed along the HSCTC alignment of which 3 are already under construction by NHAI. A 3-tier interchange at Irumbuliyur is already functional.
Adyar Corridor Interchanges (6)
- A trumpet interchange at the end of Thiruvi-ka-bridge at the junction of Theosophical Society border and Durgabhai Deshmukh Road. This is where the Adyar Corridor begins.
- A non-conventional interchange with 5 ramps at Gandhi Mandapam Road.
- A trumpet interchange near Nandanam Cosmopolitan Club where the Mambalam Canal Corridor begins with an additional ramp.
- A non-conventional interchange with 2 ramps at Inner Ring Road.
- A non-conventional interchange with 3 ramps at Mount-Poonamallee Road.
- A trumpet interchange at Porur with Chennai Bypass with 2 additional ramps. This is where the Adyar Corridor ends.
Chennai Bypass Corridor Interchanges (2)
Main articles: Irumbuliyur Junction and Madhavaram Junction- A 3-tier interchange at Irumbuliyur. This is where the Chennai Bypass Corridor begins.
- A trumpet interchange is under construction at Madhavaram where the Corridor ends.
Chennai Port - Madhuravoyal Elevated Expressway Interchanges (2)
Main articles: Maduravoyal Junction and Koyambedu Junction- A Clover leaf interchange is under construction at Maduravoyal.
- A modified parclo interchange with 3-loops in under construction at Koyambedu.
North Buckingham Canal Corridor Interchanges (2)
- A trumpet interchange at Manali Oil Refinery Road (MORR) with an additional ramp. This is where the Buckingham Canal Corridors begin.
- A modified parclo interchange [in the shape of letter 'B'] with 4 additional ramps at Manali High road.
Mambalam Canal Corridor Interchanges (1)
- A non-conventional interchange with 4 ramps at Todhunter Nagar.
East Coast Elevated Expressway Interchanges (2)
- A non-conventional interchange with 4 ramps at Foreshore Estate.
- A 3-tier elevated interchange with the proposed Southern Bund Road along the Adyar River abutting Theosophical Society.
Project Status
2008
January:
- Governor's address on the preparation of pre-feasibility study for HSCTC and Preliminary works for Port-Maduravoyal Elevated expressway.[8]
November:
- Wilbur Smith Associates won the contract of TNUIFSL to prepare the feasibility study and DPR for the project.[9]
2009
28 May:
- DIR, cost estimates, work drawings and bid documents for the first leg the Chennai High Speed Circular Corridors (HSCC) was released to the public.
31 May:
- Public consultation will be held on June 3, 2009 at 10 a.m at Hotel Checkers, Little Mount.[10]
3 June:
- 2-tier and 3-tier systems were discussed with the public and experts. Residents of the affected areas opposed the project and demanded proper compensation if they are evicted.[11]
- Adyar Poonga Trust promises to resettle the displaced.[12]
16 June:
- Adyar Poonga Trust plans to bring commercial real estate in the elevated corridors as part of the fund equation. Residents voice out asking why not residential real estate for the affected fishermen.[13]
- DPR for Adyar Corridor and feasibility for other corridors will be ready by the end of 2009.
12 August:
- HSCTC Corridor length shortened to 100 km from 120 to accommodate the elevated section Metro along the IRR and St. Thomas Mount to Porur section.[14]
26 August:
- Feasibility study to be over by January 2010. Total length of the corridor is 110 km. 60 km will be built by NHAI as part of Chennai Port - Maduravoyal Expressway and Ennore - Manali Road Infrastructure Projects.[15]
2010
July 2010:
- Environmental clearance has been obtained from National Coastal Zone Management Authority (NCZMA) for Chennai Port —— Maduravoyal Expressway.[16]
See also
- IT Corridor
- Chennai Elevated Expressways
References
- ^ http://www.tnudf.com/index.asp
- ^ http://www.processregister.com/Chennai_Port-Maduravoyal_Four_Lane_Elevated_Road/Project/pid23275.htm
- ^ http://www.hindu.com/2009/06/18/stories/2009061859590400.htm
- ^ http://www.tn.gov.in/gorders/highways/hway_e_63_2008.pdf
- ^ http://www.hindu.com/2009/01/28/stories/2009012858270300.htm
- ^ http://www.hindu.com/2009/01/25/stories/2009012558090100.htm
- ^ http://www.nhai.org/nhdpphase7.asp
- ^ http://www.tn.gov.in/tnassembly/Governors_address_Jan2008.htm
- ^ http://www.hindu.com/2008/11/02/stories/2008110255220600.htm
- ^ http://www.hindu.com/2009/05/31/stories/2009053158450300.htm
- ^ http://www.hindu.com/2009/06/03/stories/2009060357630300.htm
- ^ http://timesofindia.indiatimes.com/Cities/Chennai/Adyar-Poonga-Trust-promises-to-resettle-families-displaced-by-circular-corridor/articleshow/4610505.cms
- ^ http://www.hindu.com/2009/06/16/stories/2009061651800300.htm
- ^ http://economictimes.indiatimes.com/News/News-By-Industry/Transportation/Chennai-circular-corridor-shortened-to-accommodate-metro-railway/articleshow/4886050.cms
- ^ http://www.hindu.com/2009/08/26/stories/2009082659990300.htm
- ^ http://www.thehindu.com/news/cities/Chennai/article533602.ece
Urban transit in Chennai Bus Transits Intra-city Expressways Rail Transits * Planned · † Under construction Categories:- Public transport in India
- Expressways in India
- Chennai HSCTC
- Proposed public transport in India
Wikimedia Foundation. 2010.