Chennai Elevated Expressways

Chennai Elevated Expressways

non

Chennai Elevated Expressways
Route information
History: Scheduled for completion in 2019–2020
Location
Major cities: Chennai
Highway system
Chennai HSCTC

Indian Road Network
National • Expressways • State

Chennai Elevated Expressways is a Road Network Development Scheme of the Second Master Plan by CMDA for the Chennai city.[1]

Contents

Corridors

A total of 5 Elevated Corridors have been proposed as a medium-term Scheme.[2]

Type Along/Across From To via Length (km) Cost in INR crores (Estimated) Status
Elevated Road Arcot Road Vadapalani Porur 300
Elevated Road Thiruvottiyur High Road Tollgate Ernavur Bridge 250
Elevated Road Rajaji Salai Parrys Corner Tollgate 350
Elevated Road Nungambakkam High Road Valluvarkottam High Road, Mc. Nichols High Road, College Road and Haddows Road 300
Elevated Road GST Chennai Port Tambaram 1400

The following 12 Corridors have been proposed in the Long term Scheme

Type Along/Across From To via Length (km) Cost in INR crores (Estimated) Status
Elevated Freight Corridor Ennore Port (Northern Gate) NH5 Tachur 100.68
Elevated Freight Corridor Ennore Port (Northern Gate) TPP (Thiruvottiyur Ponneri-Panjetty Road) Vallur 142.98
Elevated Freight Corridor Beach Ennore Port Chennai Port 1500
Elevated Road Anna Salai 750
Elevated Road EVR Salai 600
Elevated Road Kamarajar Salai 480
Elevated Road Rajiv Gandhi Salai (IT Expressway) 900
Elevated Road Arcot Road 360
Elevated Road Aminjikarai Sterling Road 225
Elevated Road Kathivakkam High Road 600
Elevated Road Thiruvottiyur High Road Monroe Statue Manali 600
Elevated Road NH45 Kathipara Tambaram 1350
* Revised cost during tender process.

Other Corridors

Apart from the Master Plan, other corridors are being planned by the Corporation of Chennai, Chennai Port Trust and Ennore Port Trust. The following are the details of these elevated roads.

Type Along/Across From To via Length (km) Cost in INR crores (Estimated) Status
Elevated Freight Corridor NH4 Maduravoyal Sriperumbudur Dry Port 20 (approx) Pre-feasibility study under process
Elevated Road Sardar Patel Road Halda Madhya Kailash Junction 3.6 {approx} 100 Proposed under JNNURM

Project Deadline

Ten years from the commencement of the project (Jan,2009). The corridors are expected to be completed by 2019-2020.

References


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • Elevated Expressways in Hyderabad — Elevated Expressways P.V. Narasimha Rao Elevated Expressway, Rajiv Elevated Expressway Route information Length: 31.6 km (19.6 mi) 11.6 kilometres (7.2 mi) ( P.V. Narasimha Rao ) 20 kilometres (12 mi) ( Rajiv ) History: [PVNR] Completed …   Wikipedia

  • Chennai HSCTC — Chennai High Speed Circular Transportation Corridors Route information Length: 107.795 km (66.981 mi) Existed: 2009 – present History: First corridor: Chennai Port Maduravoyal Corridor; scheduled for completion in 2013 …   Wikipedia

  • Chennai Bypass — Route information Maintained by National Highways Authority of India (NHAI) Length: 32 km (20 mi) …   Wikipedia

  • Chennai Monorail — Info Locale Chennai, India Transit type Monorail Number of lines 4 (Phase I) Headquarters Chennai …   Wikipedia

  • Chennai Suburban Railway — Info Owner Southern Railways Locale Chennai (Madras), India …   Wikipedia

  • Chennai RBTW — Chennai Rapid Bus Transit Ways (RBTW) Info Locale Chennai, India Transit type Rapid transit Number of lines 15 Technical System leng …   Wikipedia

  • Chennai Port — (Madras Port) Chennai Port Location Country …   Wikipedia

  • Chennai Mofussil Bus Terminus — Main facade of the CMBT Station statistics Address Inner Ring Road, Koyambedu …   Wikipedia

  • Chennai Airport Flyover–Travelator — Chennai Airport Flyover Travelator Type Flyover Travelator Locale Chennai, India Built By Airports Authority of India Distance 1 kilometre (0.62 mi) Direction One way traffic The Chennai Airport Flyover Tr …   Wikipedia

  • Chennai International Airport — சென்னை பன்னாட்டு வானூர்தி நிலையம் The Chennai Airport undergoing development work IATA: MAA – ICAO: VOMM …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”