National Broadband Network

National Broadband Network

The National Broadband Network (NBN) is a national wholesale-only, open-access data network under development in Australia. Up to one gigabit per second connections are sold to retail service providers (RSP), who then sell Internet access and other services to consumers. The NBN has been subject to political and industry debate for a number of years, before construction actually commenced.

The network is estimated to cost A$35.9 billion to construct over a 10-year period, including an Australian Government investment of A$27.5 billion. The build cost has been a key point of debate, especially the additional cost to serve some country and rural areas. NBN Co, a government-owned corporation, was established to design, build and operate the NBN, and construction began with a trial rollout in Tasmania in July 2010. The mainland rollout began with five first-release sites with the first services connected in April 2011.

The FTTP rollout is planned to reach approximately 93 per cent of the population by June 2021. Construction of the fixed wireless network is planned to begin in 2011, delivering its first services in 2012 and to be completed by 2015. Two satellites will be launched by 2015. The network will gradually replace the copper network, owned by Telstra and currently used for most telephony and data services. As part of an agreement with NBN Co, Telstra will move its customers to the NBN, and lease access to its exchange space and extensive network ducting to assist in the rollout.

Contents

Broadband policy

Previous attempts at national broadband networks

Broadband Advisory Group 2003

In a report released on 22 January 2003 the Howard government’s Broadband Advisory Group (BAG) recommended the Federal Government work with other governments and industry stakeholders to form a "national broadband network". [1] A subsequent Senate committee recommend the Federal Government replace the "increasingly obsolete" copper network with a new network based on fibre to the node (FTTN) or alternative technologies.[2]

Telstra Copper Upgrade Plans 2005

On 15 November 2005 Telstra, the owner of the national copper network, announced a plan to upgrade its ageing networks, including a rollout of a fibre to the node (FTTN) network. At the time, the Federal Government was the majority shareholder of Telstra, but the plan did not involve any additional government investment.[3][4] The rollout was later put on hold after the Howard Government refused to exempt the new network from laws requiring third party access, instead saying Telstra could achieve the exemption by applying to the competition regulator, the Australian Competition and Consumer Commission (ACCC).[5][6] Telstra dropped plans for the new network on 7 August 2006, after reaching an impasse in negotiations with the ACCC.[7] Former ACCC chairman, Graeme Samuel later said the proposal was "an illusion on cost and on the capacity to truly deliver high-speed broadband to end users".[8]

Broadband Connect Policy & OPEL Networks 2006/07

In June 2006 the Broadband Connect policy was announced by the Howard Government with an aim of providing greater access to broadband services in rural and regional areas.[9]

OPEL Networks—a 50–50 joint venture between Optus and Elders—was announced on 18 June 2007 as the sole successful bidder in tender [10] However, on 2 April 2008 Communications Minister Stephen Conroy terminated the agreement because OPEL had "failed to meet the terms of [the] contract".[11]

G9 Consortium 2007

Nine telecommunications companies—AAPT, Internode, iiNet, Macquarie Telecom, Optus, PowerTel, Primus, Soul and TransACT, formerly known as G9—proposed its own FTTN network on 20 April 2007,[12] however, it was rejected by the ACCC on 17 December 2007 because of future unknown conditions for access.[13]

Current policy

Initial failed federal government RFP 2007/09

In the run-up to the 2007 federal election, opposition Labour party leaders announced a Labour Government would build a "super-fast" national broadband network, if elected. [14][15]

The network was estimated to cost A$15 billion including a government contribution of A$4.7 billion which would be raised in part by selling the Federal Government's remaining shares in Telstra. [16] After the election, the new Labour Rudd Government issued a request for proposals (RFP) to build the NBN, and six proposals were submitted by Acacia, Axia NetMedia, Optus on behalf of Terria, TransACT and the Tasmanian Government (covering their respective states only), as well as Telstra. [17][18][19][19] [20][21] Telstra’s submission was later excluded [22] leading to warnings that if the project were to go ahead, Telstra would be entitled to compensation estimated at {{nowrap|A$15–20 billion [23][24] With the other bidders neither able to meet the government's requirements nor able to raise the necessary capital during the global financial crisis, the RFP was terminated on 7 April 2009. [25]

Current policy announcement April 2009

After terminating its initial RFP, the Rudd Government announced it would bypass the existing copper network by constructing a new national network combining fibre to the premises (FTTP), fixed wireless and satellite technologies. [26]

Tasmania was selected for a trial deployment based on the Tasmanian Government's submission to the RFP. [25]

Creation of NBN Co April 2009

NBN Co was established on 9 April 2009 [27][28] and Mike Quigley was appointed chief executive officer on 25 July 2009,[29] An implementation study was commissioned in April 2009 and released on 6 May 2010 by the Rudd Government.[30] McKinsey & Company and KPMG concluded the NBN can be implemented and made 84 recommendations in the study, including expanding the fibre footprint to 93 per cent from the original 90 per cent.[31] NBN Co released its business plan on 20 December 2010, including forecasts and network design.[32] A number of changes were made as part of NBN Co’s business plan, including an increase in the peak speed to one gigabit per second,[33] in response to Google Fiber[34] and giving "priority" to regional and rural areas during the rollout following the events after the 2010 election.[35][36]

'National Broadband Network Companies Act 2011'

The Parliament passed the National Broadband Network Companies Act 2011 and a related bill on 28 March 2011[37] with amendments by the Greens and independent senators adopted on 26 March 2011.[38] The amendments centred around transparency, freedom of information and competition concerns, including the adoption of uniform national wholesale prices for NBN connections.[39][40] The Government has required support from the Greens to pass NBN legislation through the Parliament. The Greens have voted in favour of NBN legislation, but have also won support for amendments that make NBN Co subject to freedom of information laws,[41] and that make any proposal to privatise the NBN subject to review by the Parliament and by the Productivity Commission.[42] The Government has also required the support of other independent and minor party members and senators for NBN legislation. Independent senator Nick Xenophon also supported NBN legislation in the upper house, but only after the government agreed to release a summary of NBN Co's business case.[43]

Agreement with Telstra and Optus 2011

A manhole for access to Telstra's ducts; this infrastructure is used by NBN Co.

Following threats by the federal government to force a structural separation of Telstra,[44][45] NBN Co signed a definitive agreement with Telstra on 23 June 2011 estimated to be worth A$9 billion post-tax net present value,[46] Building upon the signing of a financial heads of agreement a year beforehand.[47] Instead of separating, Telstra agreed to "disconnect"[48] its Internet customers from the copper and hybrid fibre-coaxial networks in areas where FTTP has been installed, and agreed to leased dark fibre, exchange space and ducts to NBN Co. Apart of the agreement, Telstra would not be able to market their mobile network as an alternative to the NBN for a number of years.[46] This clause is similar to the one in the agreement with Optus over its hybrid fibre-coaxial network estimated to be worth A$800 million post-tax net present value.[49] The ACCC—whose approval is required before both agreements take effect—raised concerns about the clauses being anti-competitive.[50] Both Telstra and Optus would remain the owner of their respective networks. [51] On 18 October 2011, Telstra shareholders overwhelmingly approved the deal. [52]

Responses by stakeholders

Since the announcement, the NBN has received both criticism and praise, from politicians, telecommunication companies, businesses and the public. The Coalition has described the NBN as a "dangerous delusion"[53] and "a white elephant on a massive scale";[54] instead advocate a policy on filling "gaps"[55] in the current copper networks where "commercial solutions were not always viable".[56] Nationals senator Barnaby Joyce said the NBN mirrors a proposal released by their think tank, saying it "delivers a strategic infrastructure outcome" and it is "vitally important that the [NBN] gets to the corners of our country where the market has failed".[57] The Greens said the NBN "is a key piece of 21st century infrastructure".[58] Independent MPs Rob Oakeshott,[59] Tony Windsor,[60] Bob Katter[61] and Andrew Wilkie[62] have expressed support for the NBN. Bob Katter said the NBN is "a great thing for this country".[61] Tony Windsor said the NBN is "too good an opportunity to miss".[60] Family First Party leader Steve Fielding said the NBN will "bring [Australia] up to speed".[63]

Telecommunication companies Optus,[64][65] iiNet,[64][65] Internode,[64] and Vodafone-Hutchison,[65] have expressed support for the project, along with the Australian Internet Industry Association, which said optical fibre solutions are "a critical part in the evolution of the internet".[66] Internode managing director Simon Hackett said he was "glad [the NBN is] going to go ahead".[64] Vodafone-Hutchison CEO Nigel Dews said the NBN will “transform the competitive landscape”.[65] However, other telecommunications companies including AAPT,[67] PIPE Networks[68] and Exetel[69] have expressed opposition to the NBN. AAPT chief executive Paul A. Broad said the NBN will "stifle competition".[67] PIPE Networks founder Bevan Slattery said the NBN is "economically irresponsible".[68] Exetel chief executive John Linton described the NBN as a "political stunt".[69]

Microsoft, Google and Intel have expressed their support for the NBN.[65][64] Google's head of engineering, Alan Noble, said the NBN will "be the greatest enabler of innovation". Intel managing director Philip Cronin said "the NBN has the potential to deliver significant long term benefits".[64] The Swinburne University of Technology conducted a survey of Australian Internet usage for the World Internet Project between September 2009 and October 2009. The survey of 1,000 people asked about Internet usage and how it influences daily life.[70] A question was included asking if the NBN was a "good idea"; 74.5 per cent agreed.[71] In the survey, the NBN had stronger support among younger people and Internet users.[72]

Network design

Fibre to the premises

The FTTP network.

Premises within the FTTP footprint are connected using Ethernet over a gigabit passive optical network (GPON) giving a peak speed of one gigabit per second.[73][74] A fibre-optic cable, known as the "drop fibre", goes from the premise to the street ending at the top of a power pole or in an underground pit. The "drop fibre" cable joins a "local network" which links a number of premises to a splitter in the fibre distribution hub.[75] A "distribution fibre"[76] cable connects the splitter in the distribution hub to a fibre access node, which is linked up to a PoI.[75] Mike Quigley said one of the advantages of a GPON network is the distribution hub requires no electronics. He used an example in the United States where a hub was "under water and full of mud" and it continued to function while the fire department used a high pressure hose to clean it.[77] Without electronics, the distribution hub does not require a power supply, nor a battery for power outages. In a GPON network only the local exchanges housing the fibre access nodes and the equipment on premises requires a power supply.[77][78]

The FTTP network architecture chosen by NBN Co comprises a number of replicating modules which is combined to make up the FTTP network.[79] A fibre distribution area includes up to 200 premises linked up to a fibre distribution hub. A fibre serving area module comprises 16 fibre distribution areas, which services up to 3,200 premises.[79] A fibre serving area comprises 12 fibre serving area module connected to a fibre access node, which services up to 38,400 premises. During the 10-year construction, NBN Co plans to build or lease approximately 980 fibre serving areas, servicing up to 37,632,000 premises.[79] Mike Quigley said the modular design will decreases the construction risk of the NBN and allow continuous improvements in the construction, network design and supply chains.[80]

Fixed wireless and satellite

Approximately 93 per cent of the population is planned to be serviced with FTTP,[81] with the remainder serviced by either fixed wireless or satellite technologies.[82] The FTTP build costs for each premise increases with each percentile in the last 7 per cent, because of a low population density.[81] The current funding could only achieve approximately 93 per cent FTTP footprint,[83] however, the FTTP footprint will be expanded where users or communities are willing to pay the incremental costs of installing FTTP.[84]

NBN Co will deploy a 4G Long Term Evolution fixed wireless network covering approximately 4 per cent of the population outside the fibre footprint.[85] The premises in the fixed wireless footprint will be hooked up to an antenna allowing a connection to a wireless base station; the base station links to a PoI via a backhaul.[86][87] The 2.3 GHz and 3.4 GHz spectrums[88] will be used to delivery these fixed wireless services. Unlike the mobile networks, only premises can connect to the NBN's fixed wireless network.[89] The number of premises assigned to each base station will also be limited.[83] Mike Quigley said the limits will ensure users received a "good service" because of the "high[er] throughput".[83] Users at the edge of the coverage for each base station will receive a peak speed of 12 megabits per second, the speed increases "considerably" moving closer to the base station.[90]

NBN Co is planning to launch two Ka band satellites by 2015, each offering 80 gigabits per second of bandwidth of which is a jump from the four to six gigabits per second capacity available from current satellites above Australia.[83][91][92] In the interim, NBN Co will use existing satellite to provide six megabit per second to a limited number of premises who currently do not have access to broadband speeds.[83][93] The satellites will be used to bounce signals from a satellite dish on the premises to an earth station, known as a "gateway"; the gateway is then connected to a PoI via a fibre backhaul.[87][94] Mike Quigley said the satellite design was "not easy", because the required coverage is about "five per cent of the world's land mass" containing "at least 200,000 premises" spread across "over 7,000 kilometres" of area between Cocos Islands and Norfolk Island.[83]

Equipment and connectivity

How RSPs and wholesalers connect to the NBN.

Internet access and other services using the NBN are sold to consumers from a retail service provider (RSP),[95] who connects their network to the NBN at a Point of Interconnect (PoI).[96] Mike Quigley has said the "ubiquity and standardisation" is important in the NBN, he continued RSPs will be able to connect to PoIs "using the same BSS processes and interfaces, at the same prices and with the same product constructs as far as is possible across all three technology products".[97] Layer 2 network access is sold to RSPs,[95] with uniform pricing within each of the three technologies regardless of where the service is delivered and across the technologies for the basic package.[98] To provide this uniform pricing, regional and rural areas will be cross-subsidised with the lower cost metropolitan areas. To prevent other potential providers from undercutting NBN Co in metropolitan areas, new fibre networks are required to be open access and charge similar prices; these rules are known as the "anti-cherry picking" provisions, which were passed into law with other NBN legislation.[99]

When completed the NBN will have 121 PoIs available to RSPs.[100] Originally, NBN Co planned for a more centralised model with only 14 PoIs, however, was overruled by the Federal Government on the advice from the Australian Competition and Consumer Commission (ACCC). The ACCC considered the plan to be "mission creep" and would have given NBN Co a monopoly over backhaul, however, NBN Co said centralised model would have allowed smaller RSPs to connect without going through a wholesale aggregator.[101] ACCC recommended 121 Pols after public consultation.[100] Internode criticised the "insane"[102] number of PoIs and after its pricing announcement warned it might have to charge more in regional areas because of the increase costs.[103] In response, Shadow Minister for Communications, Malcolm Turnbull said the "government can't deliver on a crucial promise" of "national uniform pricing", however, Minister for Communications, Stephen Conroy said we "guaranteed uniform wholesale pricing" not retail pricing.[104]

The NBN will use one of the three technologies to connect the RSP and its network to the network termination device (NTD) on premises. The NTD will allow devices to connect the NBN using the Ethernet or telephone ports.[105] An external source is required to power the NTD, while a battery will supply power for a limited time during power outages. NBN Co will supply a battery during the rollout, however, the end users or their RSP will be responsible for maintenance and replacement of the battery.[106] Mike Quigley said the batteries are the biggest source of complaints from trial users with some users doubting they will ever use the battery. The Federal Government and NBN Co are in talks over the issue.[107]

Expected cost and return

The Rudd Government estimated to the total cost of the project initially to be A$43 billion. NBN Co later revised down the cost in its business plan to A$35.9 billion.[108] The project is to be financed by a combination of a Federal Government investment of A$27.5 billion and private investment for the remainder.[108] The size of the government investment in the NBN has been a key point of both criticism and praise. The Coalition called for a cost-benefit analysis, describing the NBN as "a white elephant on a massive scale".[54] The Economist Intelligence Unit (EIU) criticised the NBN as a "huge cost to the public sector",[109] however, Minister for Communications, Stephen Conroy said the EIU were a "right-wing dogma" and would criticise any government investment in infrastructure.[110] Vint Cerf, co-creator of TCP/IP, said the NBN is "a stunning investment"[111] and asked for a "full and frank breakdown of the costs" at the conclusion of the project, to "aid and inform attempts by other countries to build a national network".[112] NBN Co intends to begin paying dividends back to the Federal Government in 2020, and to have fully repaid the Government's contribution by 2034.[113] NBN Co's business plan forecasts a return on investment of 7 per cent, expecting to turn over revenue of A$5.8 billion by 2021.[114] Prime Minister Julia Gillard says "taxpayers will be repaid their investment in the NBN with interest",[114] however, Shadow Minister for Communications, Malcolm Turnbull said "expectations of strong early revenues [for NBN Co] are looking overly optimistic".[115]

Implementation

Trial rollout in Tasmania

The trial rollout in Tasmania, including stage one (in red), two (in yellow), three (in green) and fibre "backbones" (in grey).

Tasmania was selected as the first state[116] to begin the rollout of the NBN, based on the Tasmanian Government's "shovel ready"[117] submission to the RFP for the original NBN.[25] A new company, NBN Tasmania (previously Tasmania NBN Co),[118] was formed on 8 April 2009 to build the NBN in Tasmania.[119] The company was planned to be a joint-venture between NBN Co, Aurora Energy and the Tasmanian Government.[117] The Tasmanian Government also floated an idea to invest A$12.7 million in Aurora Energy to get access to its fibre network, however, the joint-venture and deal were both cancelled on 9 November 2010 when the negotiations reached a impasse.[117][120] Although the joint-venture was cancelled, Aurora Energy still plays a role in the construction of the NBN in Tasmania.[121]

The trial rollout in Tasmania comprises three stages. Stage one was announced on July 2009 with the first customers being connected a year later.[122][123] Stage one included connections to premises in Smithton, Scottsdale and Midway Point[121] and construction of fibre "backbones" from Port Latta to Smithton, Cambridge to Midway Point, Midway Point to Triabunna, George Town to Scottsdale and Scottsdale to St Helens.[124] On completion of stage one, 4,000 premises were offered fibre installation; 51 per cent took up the offer.[125] As of 6 May 2011, 712 premises have an active service and 11 premises are awaiting service activation by a retail service provider (RSP).[121]

The Tasmanian Parliament passed opt-out legislation on 18 November 2010,[126] to allow NBN Co to install fibre connections to premises unless the property owners explicitly decline the installation.[127] The fibre connection is free, however, if the installation is declined and a connection is ordered at a later date, NBN Co may charge a connection fee.[128] The bill passed the Tasmanian lower house with the support of all members.[126] During his second reading speech, then-Premier of Tasmania David Bartlett said the take-up rates were "a good early result", however, he said it was "important to increase the participation rate".[128] In his closing remarks, Bartlett said "[the] NBN in Tasmania is a once-in-a-generation opportunity to create jobs and contribute to a new economic direction".[129] In her second reading speech on behalf of the Tasmanian Opposition, Elise Archer said "the NBN is an important infrastructure", but that "the State Liberals have some concern that the NBN business model seems to rely more and more on eliminating competition and other technologies".[130]

Stages two and three were announced on 21 October 2009 and 1 March 2010, respectively. Approximately 11,150 premises in Sorell, Deloraine, George Town, St Helens, Triabunna, Kingston Beach and South Hobart were included in stage two.[131][132] Stage three includes approximately 90,000 premises in Hobart, Launceston, Devonport and Burnie.[133] Stage two will include a trial of expanding the FTTP footprint to areas not included in the initial rollout. The trial will allow individuals and councils to pay the incremental cost of a fibre connection over fixed wireless in order to receive a fibre connection from NBN Co. The costs will include provisioning further space in exchanges and rolling out additional fibre optic cables.[134]

At the time of launch, the access prices for RSPs were temporarily set at a flat rate of A$300 per premises with no ongoing monthly charges.[135] Mike Quigley said one of the reasons for the flat rate is the OSS and BSS systems was not built to make the process automatic. He continued if NBN Co charged a monthly charge without the systems, it would have been a "very manually intensive process" and not a "sensible proposition".[136] However, RSPs did charge a monthly fee to customers, to cover the cost of the trial.[136]

First release sites

The first (in red) and second (in green) release sites of the NBN rollout.

Five areas comprising around 14,000 premises were chosen as the "first mainland sites", each representing rollout challenges the NBN was expecting to face during an Australia-wide rollout, with the first services going live on 19 April 2011.[137][138][139] commenced on 17 August 2010,[140][141] Armidale was the first site to officially launch on 18 May 2011 with 2,900 premises included of which 90% opted for connection.[142][143] Kiama Downs and Minnamurra was the second site to officially launch, following Armidale on 29 July 2011. Approximately 2,350 premises were passed, of which 80 per cent opted in for installation.[144] Brunswick had the lowest installation rate at the time of its official 4 August 2011 launch: of the approximately 2,689 premises passed, only 50 per cent opted for installation.[145] Aitkenvale and Mundingburra followed Brunswick on 1 September 2011 with approximately 3,100 premises passed and 63 per cent opted for installation.[146] Willunga was the fifth and final "first release site" to officially launch on 16 September 2011 with approximately 940 premises passed and 91 per cent opted for installation.[147]

Second release sites

Fourteen second release sites comprising 54,000 premises in all states and territories were announced on 8 July 2010 with construction commencing in August 2011.[148] The sites comprise premises in Aspley, Bacchus Marsh, Casuarina, Coffs Harbour, Geraldton, Gungahlin, Mandurah, Modbury, Prospect, Riverstone, South Morang, Springfield Lakes, Toowoomba and Victoria Park.[149][150] Telstra had agreed to allow NBN Co to use its exchanges and ducts in the second release sites before the agreement was finalised.

National rollout

Construction of the NBN began with a trial rollout in Tasmania,[116] with the first customers connected in July 2010.[122][123] NBN Co plans to complete the FTTP rollout by June 2021,[151] along with the completion of the fixed wireless[85] and satellite rollout by 2015.[91][92]

Fibre to the premises

In April 2010, NBN Co began a tender for the major FTTP rollout. 14 vendors submitted a proposal, however, NBN Co suspended the process on 1 April 2011, as the prices were "unacceptably high".[152] After the suspension, NBN Co entered into an agreement worth up to A$380 million with Silcar on 1 June 2011. The agreement covers the construction of the NBN in Queensland, New South Wales and the ACT by Silcar, a company joint-owned by Siemens and Thiess.[153] The agreement also includes the option of a two-year extension with an additional value of A$740 million.[154]

Fixed wireless

The 2.3 GHz and 3.4 GHz radio spectrums will be used to provide Long Term Evolution fixed wireless covering approximately 4 per cent of the population outside the fibre footprint.[85] NBN Co bought spectrum from Austar for A$120 million in February 2011,[155] with the remanding spectrum covering areas in Western Australia, the Northern Territory, South Australia, outback Queensland and New South Wales were bought on 13 July 2011 for A$1.3 million in an auction by the Australian Communications and Media Authority. NBN Co said the spectrum bought from Austar and in the auction covers "all the geographic coverage it needed" to build its fixed wireless network.[156]

NBN Co signed an initial 12-month contract on 1 June 2011 with Ericsson to design, build and operate the network with options to extend the contract for up to 10 years at a total cost of A$1.1 billion. Construction will commence in 2011, with the first five locations announced as the regional and rural communities surrounding Geraldton, Toowoomba, Tamworth, Ballarat and Darwin.[157] The first services are scheduled to begin in 2012 and completion in 2015.[85]

Satellite services

While the planning continues on the two satellites due to launch by 2015, NBN Co has launch interim satellite services on 1 July 2011, providing up to six megabits per second.[158] Due to the limited satellite capacity, these services were given to customers who did not have access to alternative "metro comparable" services, similar to the Federal Government's Australian Broadband Guarantee (ABG) program which ended on 30 June 2011.[158] The criteria for alternative "metro comparable" services were minimum data speeds of at least 512 kilobits per second, a 3GB per month data allowance and a total price to the end customer of no more than A$2,500 over three years.[93] To provide these services NBN Co brought managed satellite services and satellite capacity from Optus for $200 million and additional satellite capacity from IPstar for A$100 million.[159]

NBN Co is planning to launch two Ka band satellites by 2015 at a total cost of A$1 billion, each offering eighty gigabytes per second of bandwidth.[91][92]

Operation

Greenfields and Brownfields

On 20 June 2011, the Productivity Commission said they have began an investigation spanning across approximately three months to look into allegations of anti-competitive behaviour by NBN Co in new housing estates. Three separate complaints were received from private greenfields fibre builders, led by Greenfield Fibre Operators Australia chairman and OPENetworks' Michael Sparksman. The operators were concerned that NBN Co was misleading housing estate developers by promoting its role as "provider of first choice", rather than its commitment as the "provider of last resort".[160]

See also

References

  1. ^ Broadband Advisory Group (22 January 2003), The Broadband Advisory Group's Report to Government, Minister for Communications, Information Technology and the Arts, http://parlinfo.aph.gov.au/parlInfo/download/media/pressrel/YUC86/upload_binary/yuc864.pdf, retrieved 17 June 2011 
  2. ^ Environment, Communications, Information Technology and the Arts Senate Committee (August 2004), The Australian telecommunications network, Parliament of Australia, http://www.aph.gov.au/Senate/committee/ecita_ctte/completed_inquiries/2002-04/tele_network/report/telecommunications.pdf, retrieved 17 June 2011 
  3. ^ Ferguson, Iain (15 November 2005), Telstra to slash tech costs under review, ZDNet, http://www.zdnet.com.au/telstra-to-slash-tech-costs-under-review-139222399.htm, retrieved 30 April 2011 
  4. ^ Maiden, Malcolm (16 November 2005), Telstra dives as $10bn plans unveiled, The Age, http://www.theage.com.au/news/business/telstra-dives-as-10bn-plans-unveiled/2005/11/15/1132016797364.html, retrieved 30 April 2011 
  5. ^ LeMay, Renai; Ferguson, Iain (21 December 2005), Telstra says fibre to the node plans on hold, ZDNet, http://www.zdnet.com.au/telstra-says-fibre-to-the-node-plans-on-hold-139228866.htm, retrieved 30 April 2011 
  6. ^ LeMay, Renai (14 December 2005), Clock ticks on Telstra operational separation, ZDNet, http://www.zdnet.com.au/clock-ticks-on-telstra-operational-separation-139227709.htm, retrieved 19 June 2011 
  7. ^ LeMay, Renai (7 August 2006), Telstra fibre talks break down, ZDNet, http://www.zdnet.com.au/telstra-fibre-talks-break-down-139265692.htm, retrieved 30 April 2011 
  8. ^ Australian Associated Press (15 June 2011), Telstra broadband plan an 'illusion': ACCC, The Age, http://news.theage.com.au/breaking-news-national/telstra-broadband-plan-an-illusion-accc-20110615-1g3di.html, retrieved 23 July 2011 
  9. ^ New look broadband policy unveiled, The Sydney Morning Herald, 15 May 2006, http://www.smh.com.au/news/breaking/new-look-broadband-policy-unveiled/2006/05/15/1147545243277.html, retrieved 17 June 2011 
  10. ^ Australia Connected: Fast affordable broadband for all Australians, Minister for Communications, Information Technology and the Arts, 18 June 2007, http://www.minister.dbcde.gov.au/coonan/media/media_releases/australia_connected_fast_affordable_broadband_for_all_australians, retrieved 17 June 2011 
  11. ^ OPEL Networks Funding Agreement not to proceed, Minister for Broadband, Communications and the Digital Economy, 2 April 2008, http://www.minister.dbcde.gov.au/media/media_releases/2008/019, retrieved 17 June 2011 
  12. ^ Australian Associated Press (20 April 2007), G9 telcos release Aussie broadband plan, The Sydney Morning Herald, http://news.smh.com.au/national/g9-telcos-release-aussie-broadband-plan-20070420-8pe.html, retrieved 19 June 2011 
  13. ^ O'Sullivan, Matt (17 December 2007), Regulator rejects G9 plan for a broadband network, The Sydney Morning Herald, http://www.smh.com.au/business/regulator-rejects-g9-plan-for-a-broadband-network-20071217-1hmr.html, retrieved 19 June 2011 
  14. ^ Beazley, Kim (15 November 2006), My blueprint for prosperity, Parliament of Australia, http://parlinfo.aph.gov.au/parlInfo/download/media/pressrel/VLGL6/upload_binary/vlgl64.pdf, retrieved 17 June 2011 
  15. ^ {{cite |last=Tindal |first=Suzanne |title=Labor unveils A$4.7 billion broadband plan |publisher=ZDNet |date=21 March 2007 |url=http://www.zdnet.com.au/labor-unveils-au-4-7-billion-broadband-plan-339274391.htm |accessdate=27 April 2011
  16. ^ Australian Associated Press (21 March 2007), Govt attacks Rudd over broadband plan, The Sydney Morning Herald, http://news.smh.com.au/national/govt-attacks-rudd-over-broadband-plan-20070321-3el.html, retrieved 19 June 2011 
  17. ^ Corner, Stuart (26 November 2008), Acacia's NBN promises 100 percent population coverage, iTWire, http://www.itwire.com/business-it-news/networking/21926-acacias-nbn-promises-100-percent-population-coverage, retrieved 18 September 2011 
  18. ^ Tindal, Suzanne (17 November 2008), Axia commits to NBN bid, ZDNet, http://www.zdnet.com.au/axia-commits-to-nbn-bid-339293329.htm, retrieved 18 September 2011 
  19. ^ a b LeMay, Renai; Tindal, Suzanne (26 November 2008), Terria, Axia, TransACT submit NBN bids, ZDNet, http://www.zdnet.com.au/terria-axia-transact-submit-nbn-bids-339293498.htm, retrieved 18 September 2011 
  20. ^ Tindal, Suzanne (26 November 2008), Acacia, Tassie govt confirm NBN bids, ZDNet, http://www.zdnet.com.au/acacia-tassie-govt-confirm-nbn-bids-339293511.htm, retrieved 18 September 2011 
  21. ^ LeMay, Renai; Tindal, Suzanne (15 December 2008), Govt kicks Telstra out of NBN tender, ZDNet, http://www.zdnet.com.au/govt-kicks-telstra-out-of-nbn-tender-339293798.htm, retrieved 18 September 2011 
  22. ^ Tindal, Suzanne (26 November 2008), Telstra submits non-compliant NBN bid, ZDNet, http://www.zdnet.com.au/telstra-submits-non-compliant-nbn-bid-339293491.htm, retrieved 18 September 2011 
  23. ^ Long, Stephen (11 April 2011), National Broadband Network, Four Corners, http://www.abc.net.au/4corners/content/2011/s3188338.htm, retrieved 27 April 2011 
  24. ^ Pauli, Darren (12 June 2009), FttN jettisoned to dodge Telstra compensation, Computerworld, http://www.computerworld.com.au/article/307303/fttn_jettisoned_dodge_telstra_compensation_/, retrieved 27 April 2011 
  25. ^ a b c {{cite |first=Renai |last=LeMay |title=No NBN winner: Govt goes FTTH alone |publisher=ZDNet |date=7 April 2009 |url=http://www.zdnet.com.au/no-nbn-winner-govt-goes-ftth-alone-339295839.htm |accessdate=27 April 2011
  26. ^ {{cite |first=Kevin |last=Rudd |title=Press Conference about the National Broadband Network |publisher=Parliament of Australia |date=7 April 2009 |url=http://parlinfo.aph.gov.au/parlInfo/search/display/display.w3p;query=Id%3A%22emms%2Femms%2F133523%22 |accessdate=31 May 2011
  27. ^ NBN Co Limited, National names index, Australian Securities and Investments Commission, http://www2.search.asic.gov.au/cgi-bin/gns030c?acn=136_533_741, retrieved 2 June 2011 
  28. ^ LeMay, Renai (30 April 2009), NBN company details hard to find, ZDNet, http://www.zdnet.com.au/nbn-company-details-hard-to-find-339296229.htm, retrieved 1 June 2011 
  29. ^ Corner, Stuart (25 July 2009), Mike Quigley to be CEO of NBN Co, iTWire, http://www.itwire.com/it-industry-news/strategy/26490-mike-quigley-to-be-ceo-of-nbn-co, retrieved 1 June 2011 
  30. ^ {{cite |last=Lohman |first=Tim |title=NBN Implementation Study released |publisher=Computerworld |date=6 May 2010 |url=http://www.computerworld.com.au/article/345610/nbn_implementation_study_released/ |accessdate=12 June 2011
  31. ^ Sharp, Ari (6 May 2010), Unveiled: plan for cheaper, faster, bigger national broadband network, The Sydney Morning Herald, http://www.smh.com.au/technology/unveiled-plan-for-cheaper-faster-bigger-national-broadband-network-20100506-ud9u.html, retrieved 23 June 2011 
  32. ^ Taylor, Josh (20 December 2010), NBN business case unveiled, ZDNet, http://www.zdnet.com.au/nbn-business-case-unveiled-339308102.htm, retrieved 19 September 2011 
  33. ^ Tung, Liam (19 March 2010), Quigley: NBN Co to deliver 1Gbps, ZDNet, http://www.zdnet.com.au/quigley-nbn-co-to-deliver-1gbps-339301748.htm, retrieved 12 June 2011 
  34. ^ Taylor, Josh (29 April 2011), 1Gbps NBN a response to Google: Quigley, ZDNet, http://www.zdnet.com.au/1gbps-nbn-a-response-to-google-quigley-339314096.htm, retrieved 19 June 2011 
  35. ^ Labor forms minority government, CRN Australia, 7 September 2010, http://www.crn.com.au/News/231316,labor-forms-minority-government.aspx, retrieved 18 June 2011 
  36. ^ Massola, James (7 September 2010), Broadband, regional package push independents to back Labor after split with Katter, The Australian, http://www.theaustralian.com.au/national-affairs/broadband-regional-package-push-independents-to-back-labor-after-split-with-katter/story-fn59niix-1225915391367, retrieved 27 April 2011 
  37. ^ NBN bills finally pass lower house, Herald Sun, 28 March 2011, http://www.heraldsun.com.au/news/more-news/nbn-bills-finally-pass-lower-house/story-fn7x8me2-1226029602261, retrieved 18 June 2011 
  38. ^ NBN bills passed after marathon session, Sky News Australia, 26 March 2011, http://www.skynews.com.au/topstories/article.aspx?id=593463, retrieved 15 May 2011 
  39. ^ Australian Associated Press (2 March 2011), Greens pass NBN FoI amendments through lower house, Computerworld, http://www.computerworld.com.au/article/378374/greens_pass_nbn_foi_amendments_through_lower_house/, retrieved 15 May 2011 
  40. ^ NBN bills passed in marathon session, ABC News, 26 March 2011, http://www.abc.net.au/news/stories/2011/03/26/3174347.htm, retrieved 18 June 2011 
  41. ^ Greens pass NBN FoI amendments through lower house, Australian Associated Press, 2 March 2011, http://www.computerworld.com.au/article/378374/greens_pass_nbn_foi_amendments_through_lower_house/, retrieved 20 June 2011 
  42. ^ Hepworth, Annabel; Wilson, Lauren (23 November 2010), Julia Gillard runs ruler over National Broadband Network, The Australian, http://www.theaustralian.com.au/national-affairs/julia-gillard-runs-ruler-over-national-broadband-network/story-fn59niix-1225958870420, retrieved 20 June 2011 
  43. ^ Kelly, Joe; Massola, James (24 November 2010), Nick Xenophon to vote for NBN legislation after PM releases business plan summary, The Australian, http://www.theaustralian.com.au/national-affairs/julia-gillard-backs-down-on-nbn-business-plan-agrees-to-give-key-senator-a-summary/story-fn59niix-1225960155144, retrieved 20 June 2011 
  44. ^ Tung, Liam (15 September 2009), Govt to break up Telstra: All the details, ZDNet, http://www.zdnet.com.au/govt-to-break-up-telstra-all-the-details-339298518.htm, retrieved 30 April 2011 
  45. ^ Department of Broadband, Communications and the Digital Economy, Telecommunications Legislation Amendment (Competition and Consumer Safeguards) Bill 2009, Parliament of Australia, http://parlinfo.aph.gov.au/parlInfo/search/display/display.w3p;query=Id%3A%22legislation%2Fbillhome%2Fr4212%22, retrieved 23 June 2011 
  46. ^ a b NBN Co (23 June 2011), NBN Co and Telstra Sign Binding Definitive Agreements, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/nbn-co-and-telstra-sign-binding-definitive-agreements-23-jun-11.pdf, retrieved 29 June 2011 
  47. ^ Bingemann, Mitchell; Hewett, Jennifer (21 June 2010), Telstra in $11bn NBN deal with Rudd government, The Australian, http://www.theaustralian.com.au/business/telstra-in-11bn-nbn-deal-with-rudd-government/story-e6frg8zx-1225882022392, retrieved 27 April 2011 
  48. ^ Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, p. 16, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 31 May 2011 
  49. ^ NBN Co (23 June 2011), NBN Co and Optus Sign Binding Agreement, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/nbn-co-and-optus-sign-binding-agreement-23-jun-11.pdf, retrieved 29 June 2011 
  50. ^ Taylor, Josh (31 August 2011), Telstra wireless ad ban worries watchdog, ZDNet, http://www.zdnet.com.au/telstra-wireless-ad-ban-worries-watchdog-339321463.htm, retrieved 14 October 2011 
  51. ^ Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, pp. 16,31, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 31 May 2011 
  52. ^ Jacob, Philip (2011-10-18). "Telstra shareholders vote yes on NBN | thetelegraph.com.au". Dailytelegraph.com.au. http://www.dailytelegraph.com.au/business/telstra-shareholders-to-vote-on-nbn/story-e6frez7r-1226169421049. Retrieved 2011-11-10. 
  53. ^ Tindal, Suzanne (7 May 2009), Turnbull slams 'dangerous NBN delusion', ZDNet, http://www.zdnet.com.au/turnbull-slams-dangerous-nbn-delusion-339296322.htm, retrieved 28 May 2011 
  54. ^ a b Rodgers, Emma (14 September 2010), Abbott orders Turnbull to demolish NBN, ABC News, http://www.abc.net.au/news/stories/2010/09/14/3011557.htm, retrieved 27 April 2011 
  55. ^ Smith, Tony; Robb, Andrew (10 August 2010), "Real Action on Broadband", Media Release (Parliament of Australia), http://parlinfo.aph.gov.au/parlInfo/download/media/pressrel/QJLX6/upload_binary/qjlx60.pdf, retrieved 2 June 2011 
  56. ^ Australian Associated Press (17 October 2007), Coonan attacks Labor broadband plans, The Sydney Morning Herald, http://news.smh.com.au/national/coonan-attacks-labor-broadband-plans-20071017-14t6.html, retrieved 19 June 2011 
  57. ^ The Nationals' Broadband Network, Barnaby Joyce, 9 April 2009, http://www.barnabyjoyce.com.au/Newsroom/MediaReleases/tabid/74/articleType/ArticleView/articleId/781/The-Nationals-Broadband-Network.aspx, retrieved 21 June 2011 
  58. ^ Ludlam, Scott (1 June 2011), Greens welcome progress on NBN, Australian Greens, http://scott-ludlam.greensmps.org.au/content/media-release/greens-welcome-progress-nbn, retrieved 20 September 2011 
  59. ^ Lohman, Tim (7 September 2010), NBN becomes lynchpin in Labor win, Computerworld, http://www.computerworld.com.au/article/359685/nbn_becomes_lynchpin_labor_win/, retrieved 27 April 2011 
  60. ^ a b Transcript of Tony Windsor's announcement, The Age, 7 September 2010, http://www.theage.com.au/federal-election/transcript-of-tony-windsors-announcement-20100907-14zew.html, retrieved 17 July 2011 
  61. ^ a b Hutchinson, James (7 September 2010), Katter backs NBN, but goes with Coalition, Computerworld, http://www.computerworld.com.au/article/359731/katter_backs_nbn_goes_coalition/, retrieved 17 July 2011 
  62. ^ Bingemann, Mitchell (31 August 2010), National Broadband Network top priority for independent Wilkie, The Australian, http://www.theaustralian.com.au/australian-it/national-broadband-network-top-priority-for-independent-wilkie/story-e6frgakx-1225912082058, retrieved 20 June 2011 
  63. ^ Symons-Brown, Bonny (24 November 2010), Fielding backs NBN, The Sydney Morning Herald, http://news.smh.com.au/breaking-news-national/fielding-backs-nbn-20101124-187c0.html, retrieved 20 June 2011 
  64. ^ a b c d e f LeMay, Renai (8 September 2010), Labor wins: industry speaks, ZDNet, http://www.zdnet.com.au/labor-wins-industry-speaks-339305869.htm, retrieved 27 April 2011 
  65. ^ a b c d e Pauli, Darren (8 May 2010), Telcos joined by Google, Intel to applaud NBN Study, Computerworld, http://www.computerworld.com.au/article/345781/telcos_joined_by_google_intel_applaud_nbn_study/, retrieved 27 April 2011 
  66. ^ Tay, Liz (19 August 2010), IIA throws support behind NBN, iTnews, http://www.itnews.com.au/News/229324,iia-throws-support-behind-nbn.aspx, retrieved 27 April 2011 
  67. ^ a b Freri, Marina (30 March 2011), NBN will stifle competition, says AAPT, Delimiter, http://delimiter.com.au/2011/03/30/nbn-will-stifle-competition-says-aapt/, retrieved 25 June 2011 
  68. ^ a b LeMay, Renai (20 April 2010), Slattery calls 'bullshit' on NBN economics, ZDNet, http://www.zdnet.com.au/slattery-calls-bullshit-on-nbn-economics-339302553.htm, retrieved 25 June 2011 
  69. ^ a b Taylor, Josh (31 January 2011), Speaking out: Exetel's view of telco issues, ZDNet, http://www.zdnet.com.au/speaking-out-exetel-s-view-of-telco-issues-339308798.htm, retrieved 12 May 2011 
  70. ^ Ewing, Scott; Thomas, Julian (2010), CCi Digital Futures: The Internet in Australia, Swinburne University of Technology, p. 49-52,54, http://cci.edu.au/sites/default/files/sewing/CCi%20Digital%20Futures%202010%201.pdf, retrieved 15 May 2011 
  71. ^ Ewing, Scott; Thomas, Julian (2010), CCi Digital Futures: The Internet in Australia, Swinburne University of Technology, p. 42, http://cci.edu.au/sites/default/files/sewing/CCi%20Digital%20Futures%202010%201.pdf, retrieved 15 May 2011 
  72. ^ Ewing, Scott; Thomas, Julian (2010), CCi Digital Futures: The Internet in Australia, Swinburne University of Technology, p. vii, http://cci.edu.au/sites/default/files/sewing/CCi%20Digital%20Futures%202010%201.pdf, retrieved 15 May 2011 
  73. ^ Rodgers, Emma (12 August 2010), Big gig: NBN to be 10 times faster, ABC News, http://www.abc.net.au/news/stories/2010/08/12/2980752.htm, retrieved 27 April 2011 
  74. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, p. 62, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 1 June 2011 
  75. ^ a b Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, pp. 2-3, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 31 May 2011 
  76. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 152, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 24 June 2011 
  77. ^ a b Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, pp. 18-19, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 31 May 2011 
  78. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, p. 73, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 22 June 2011 
  79. ^ a b c NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 79, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 24 June 2011 
  80. ^ Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, pp. 4, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 25 June 2011 
  81. ^ a b NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 70, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 21 June 2011 
  82. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, p. 12, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 1 June 2011 
  83. ^ a b c d e f Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, pp. 3, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 31 May 2011 
  84. ^ Crozier, Ry (29 April 2011), NBN Co to trial paid upgrades in Tasmania, iTWire, http://www.itnews.com.au/News/255874,nbn-co-to-trial-paid-upgrades-in-tasmania.aspx, retrieved 27 April 2011 
  85. ^ a b c d Corner, Stuart (1 June 2011), Ericsson scores NBN Co wireless contract, with $1.1b potential, iTWire, http://www.itwire.com/it-industry-news/deals/47543-ericsson-scores-nbn-co-wireless-contract-with-11b-potential, retrieved 17 June 2011 
  86. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, p. 95, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 1 June 2011 
  87. ^ a b Taylor, Josh (18 August 2010), NBN Co calls for design feedback, ZDNet, http://www.zdnet.com.au/nbn-co-calls-for-design-feedback-339305305.htm, retrieved 27 April 2011 
  88. ^ Australian Associated Press (17 February 2011), Austar soars on NBN spectrum deal, The Sydney Morning Herald, http://www.smh.com.au/business/austar-soars-on-nbn-spectrum-deal-20110217-1ax6y.html, retrieved 27 April 2011 
  89. ^ LeMay, Renai (9 September 2010), NBN Co now a wireless play: Slattery, ZDNet, http://www.zdnet.com.au/nbn-co-now-a-wireless-play-slattery-339305906.htm, retrieved 27 April 2011 
  90. ^ Hansard (22 February 2011), Environment and Communications Legislation Committee Estimates, Parliament of Australia, p. 26, http://www.aph.gov.au/hansard/senate/commttee/S13569.pdf, retrieved 19 June 2011 
  91. ^ a b c Hutchinson, James (30 March 2011), NBN Co seeks solid satellite speeds, Computerworld, http://www.pcworld.idg.com.au/article/381517/nbn_co_seeks_solid_satellite_speeds/, retrieved 27 April 2011 
  92. ^ a b c Bingemann, Mitchell (1 June 2010), Satellite operators shortlisted for national broadband network, The Australian, http://www.theaustralian.com.au/australian-it/satellite-operated-shortlisted-for-national-broadband-network/story-e6frgakx-1225873722807, retrieved 27 April 2011 
  93. ^ a b NBN Co (26 May 2011), NBN Co releases Interim Satellite eligibility criteria, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/satellite-eligibility-final-26-may-11.pdf, retrieved 23 July 2011 
  94. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, p. 96, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 1 June 2011 
  95. ^ a b NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 30–31, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 1 June 2011 
  96. ^ Taylor, Josh (22 October 2010), NBN Co pitches interconnect compromise, ZDNet, http://www.zdnet.com.au/nbn-co-pitches-interconnect-compromise-339306781.htm, retrieved 27 April 2011 
  97. ^ Hansard (16 June 2011), Environment and Communications Legislation Committee Estimates, Parliament of Australia, p. 26, http://www.aph.gov.au/hansard/senate/commttee/s115.pdf, retrieved 18 June 2011 
  98. ^ Taylor, Josh (26 March 2011), Senate passes NBN Bills with amendments, ZDNet, http://www.zdnet.com.au/senate-passes-nbn-bills-with-amendments-339312052.htm, retrieved 27 April 2011 
  99. ^ Taylor, Josh (24 March 2011), NBN amendments clarify cherry-picking, ZDNet, http://www.zdnet.com.au/nbn-amendments-clarify-cherry-picking-339311912.htm, retrieved 27 April 2011 
  100. ^ a b Australian Competition and Consumer Commission (1 March 2011), ACCC announces outcome of NBN points of interconnect confirmation process, Australian Competition and Consumer Commission, http://www.accc.gov.au/content/index.phtml/itemId/975609/fromItemId/966100, retrieved 15 July 2011 
  101. ^ Corner, Stuart (20 December 2010), ACCC pans NBN Co's 14 point of interconnect plan, wants 120, iTWire, http://www.itwire.com/it-policy-news/regulation/44051-accc-pans-nbn-cos-14-point-of-interconnect-plan-wants-120, retrieved 27 April 2011 
  102. ^ LeMay, Renai (20 December 2010), Hundreds of POIs 'insane': Hackett, ZDNet, http://www.zdnet.com.au/hundreds-of-pois-insane-hackett-339308100.htm, retrieved 23 July 2011 
  103. ^ Moses, Asher; Battersby, Lucy (21 July 2011), NBN retail price revealed: up to $189.95/month, The Sydney Morning Herald, http://www.smh.com.au/technology/technology-news/nbn-retail-price-revealed-up-to-18995month-20110721-1hqbn.html, retrieved 23 July 2011 
  104. ^ Tindal, Suzanne (22 July 2011), We never promised a uniform retail NBN price: Conroy, ZDNet, http://www.zdnet.com.au/we-never-promised-a-uniform-retail-nbn-price-conroy-339319083.htm, retrieved 23 July 2011 
  105. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 73–74, 156-157, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 1 June 2011 
  106. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, p. 27,73-74, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 22 June 2011 
  107. ^ Hutchinson, James (11 October 2011), NBN users complain about battery backup, iTwire, http://www.itnews.com.au/News/276366,nbn-users-complain-about-battery-backup.aspx, retrieved 14 October 2011 
  108. ^ a b NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 133, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 20 June 2011 
  109. ^ NBN costs taxpayers 24 times South Korea at one tenth the speed: report, The Sydney Morning Herald, 9 February 2011, http://www.smh.com.au/technology/technology-news/nbn-costs-taxpayers-24-times-south-korea-at-one-tenth-the-speed-report-20110209-1amm2.html, retrieved 20 June 2011 
  110. ^ LeMay, Renai (10 February 2011), Conroy eviscerates Economist’s “right-wing dogma”, Delimiter, http://delimiter.com.au/2011/02/10/conroy-eviscerates-economists-right-wing-dogma/, retrieved 13 October 2011 
  111. ^ Bingemann, Mitchell (21 January 2011), Internet visionary and Google web evangelist Vint Cerf praises NBN, The Australian, http://www.theaustralian.com.au/australian-it/telecommunications/internet-visionary-and-google-web-evangelist-vint-cerf-praises-nbn/story-fn4iyzsr-1225992510039, retrieved 27 April 2011 
  112. ^ McDonald, Kim (8 July 2011), Vint Cerf calls for clarity in NBN cost data, iTnews, http://www.itnews.com.au/News/262897,vint-cerf-calls-for-clarity-in-nbn-cost-data.aspx, retrieved 13 July 2011 
  113. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 23, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 20 June 2011 
  114. ^ a b Wilson, Lauren (20 December 2010), NBN to repay taxpayers 'with interest', says Julia Gillard, citing business plan, The Australian, http://www.theaustralian.com.au/business/in-depth/nbn-return-to-be-lower-than-in-commercial-plan-business-plan-shows/story-e6frgaif-1225973839279, retrieved 20 June 2011 
  115. ^ LeMay, Renai (13 May 2011), Budget 2011: Turnbull slams off-book NBN, ZDNet, http://www.zdnet.com.au/budget-2011-turnbull-slams-off-book-nbn-339314975.htm, retrieved 20 June 2011 
  116. ^ a b Australian Associated Press (8 April 2009), Tasmania to get govt broadband first, The Sydney Morning Herald, http://news.smh.com.au/breaking-news-national/tasmania-to-get-govt-broadband-first-20090408-a0ae.html, retrieved 31 May 2011 
  117. ^ a b c Riley, James (9 November 2010), Feds terminate NBN Tassie joint-venture, iTWire, http://www.itwire.com/it-policy-news/government-tech-policy/43030-feds-terminate-nbn-tassie-joint-venture, retrieved 27 April 2011 
  118. ^ NBN Tasmania, National names index, Australian Securities and Investments Commission, http://www.search.asic.gov.au/cgi-bin/gns030c?acn=138_338_271, retrieved 5 June 2011 
  119. ^ Withers, Stephen (8 April 2009), Tasmania to get first bite of the NBN apple, iTWire, http://www.itwire.com/business-it-news/technology/24341-tasmania-to-get-first-bite-of-the-nbn-apple, retrieved 6 May 2011 
  120. ^ Tung, Liam (11 June 2009), Tassie tips $12.7m in Aurora's NBN, ZDNet, http://www.zdnet.com.au/tassie-tips-12-7m-in-aurora-s-nbn-339296888.htm, retrieved 27 April 2011 
  121. ^ a b c Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, pp. 4, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 31 May 2011 
  122. ^ a b Lui, Spandas (3 July 2010), iPrimus: We connected first NBN customer, not Internode, ARNnet, http://www.arnnet.com.au/article/351924/iprimus_we_connected_first_nbn_customer_internode/, retrieved 27 April 2011 
  123. ^ a b LeMay, Renai; Tindal, Suzanne (2 July 2010), Internode connects first customer to NBN, ZDNet, http://www.zdnet.com.au/internode-connects-first-customer-to-nbn-339304244.htm, retrieved 27 April 2011 
  124. ^ Smithton, Scottsdale and Midway Point first NBN towns, ARNnet, 26 July 2009, http://www.arnnet.com.au/article/312452/smithton_scottsdale_midway_point_first_nbn_towns/, retrieved 27 April 2011 
  125. ^ Grubb, Ben (22 October 2010), One in 10 of first 4000 offered sign up for a service on NBN, The Sydney Morning Herald, http://www.smh.com.au/technology/technology-news/one-in-10-of-first-4000-offered-sign-up-for-a-service-on-nbn-20101022-16x6z.html, retrieved 29 May 2011 
  126. ^ a b Tasmanian House of Assembly (18 November 2010), Votes & Proceedings, Parliament of Tasmania, p. 5 
  127. ^ Hepworth, Annabel; Bingemann, Mitchell (30 March 2011), Labor ready to use law to force NBN link-up, The Australian, http://www.theaustralian.com.au/national-affairs/labor-ready-to-use-law-to-force-nbn-link-up/story-fn59niix-1226030333203, retrieved 27 April 2011 
  128. ^ a b Bartlett, David (2010), National Broadband Network (Tasmania) Bill 2010: Second Reading Speech, Parliament of Tasmania, p. 3, http://www.parliament.tas.gov.au/bills/Bills2010/pdf/Notes/67_of_2010-SRS.pdf, retrieved 27 April 2011 
  129. ^ Bartlett, David (2010), National Broadband Network (Tasmania) Bill 2010: Second Reading Speech, Parliament of Tasmania, p. 9, http://www.parliament.tas.gov.au/bills/Bills2010/pdf/Notes/67_of_2010-SRS.pdf, retrieved 27 April 2011 
  130. ^ Archer, Elise (18 November 2010), Hansard, Tasmanian House of Assembly, p. 53 
  131. ^ Ramli, David (21 October 2009), Stage 2 of Tasmanian NBN announced, ARNnet, http://www.arnnet.com.au/article/323043/stage_2_tasmanian_nbn_announced, retrieved 27 April 2011 
  132. ^ Taylor, Josh (28 April 2011), NBN Tasmania second sites announced, ZDNet, http://www.zdnet.com.au/nbn-tasmania-second-sites-announced-339314005.htm, retrieved 4 May 2011 
  133. ^ Lohman, Tim (1 March 2010), Stage 3 NBN Tasmania announced, Computerworld, http://www.computerworld.com.au/article/337825/stage_3_nbn_tasmania_announced/, retrieved 27 April 2011 
  134. ^ Hutchinson, James (29 April 2011), Tasmanian towns trial NBN fibre extension, Computerworld, http://www.computerworld.com.au/article/384777/tasmanian_towns_trial_nbn_fibre_extension/, retrieved 17 June 2011 
  135. ^ Tindal, Suzanne (2 September 2010), NBN access pricing still unclear, ZDNet, http://www.zdnet.com.au/nbn-access-pricing-still-unclear-339305743.htm, retrieved 27 April 2011 
  136. ^ a b Hansard (16 May 2011), Joint Committee on the National Broadband Network, Parliament of Australia, pp. 14, http://www.aph.gov.au/hansard/joint/commttee/j32.pdf, retrieved 31 May 2011 
  137. ^ Battersby, Lucy (5 October 2011), Turnbull's electorate put on hold for NBN connection, The Sydney Morning Herald, http://www.smh.com.au/technology/technology-news/turnbulls-electorate-put-on-hold-for-nbn-connection-20111004-1l7d6.html, retrieved 5 October 2011 
  138. ^ Crozier, Ry (2 March 2010), NBN Co unveils five national fibre test sites, iTnews, http://www.itnews.com.au/News/168568,nbn-co-unveils-five-national-fibre-test-sites.aspx, retrieved 27 April 2011 
  139. ^ NBN Co (30 September 2011), A new era of broadband service begins in first sites as “trial” end, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/ready-for-commercial-service-final-30-sept-11.pdf, retrieved 5 October 2011 
  140. ^ Tindal, Suzanne; Australian Associated Press (17 August 2010), NBN mainland construction begins, ZDNet, http://www.zdnet.com.au/nbn-mainland-construction-begins-339305259.htm, retrieved 22 June 2011 
  141. ^ Hutchinson, James (19 April 2011), Test customers go live on Armidale NBN, Computerworld, http://www.computerworld.com.au/article/383764/test_customers_go_live_armidale_nbn/, retrieved 27 April 2011 
  142. ^ Taylor, Josh (18 May 2011), NBN Armidale launches for 7 customers, ZDNet, http://www.zdnet.com.au/nbn-armidale-launches-for-7-customers-339315262.htm, retrieved 23 May 2011 
  143. ^ Taylor, Josh (17 May 2011), Gillard to launch NBN Armidale tomorrow, ZDNet, http://www.zdnet.com.au/gillard-to-launch-nbn-armidale-tomorrow-339315165.htm, retrieved 16 June 2011 
  144. ^ NBN Co (29 July 2011), Kiama Downs and Minnamurra ready to join NBN, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/kiama-downs-and-minnamurra-ready-to-join-nbn-29-Jul-11.pdf, retrieved 31 July 2011 
  145. ^ {{cite |author=NBN Co |title=National Broadband Network Goes Live in Melbourne |publisher=NBN Co |date=4 August 2011 |url=http://nbnco.net.au/assets/media-releases/2011/national-broadband-network-goes-live-in-brunswick-4-aug-11.pdf |accessdate=5 August 2011
  146. ^ NBN Co (1 September 2011), Queensland connected to the National Broadband Network, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/national-broadband-network-goes-live-in-townsville-01-sep-11.pdf, retrieved 16 September 2011 
  147. ^ NBN Co (16 September 2011), National Broadband Network goes live in Willunga, NBN Co, http://nbnco.com.au/assets/media-releases/2011/national-broadband-network-goes-live-in-willunga-frs-16-sep-11.pdf, retrieved 16 September 2011 
  148. ^ {{cite |first=James |last=Hutchinson |title=NBN Co reveals second release start dates |publisher=iTnews |date=3 August 2011 |url=http://www.itnews.com.au/News/265615,nbn-co-reveals-second-release-start-dates.aspx |accessdate=14 October 2011
  149. ^ {{cite |last=Crozier |first=Ry |title=NBN Co releases 14 new trial sites |publisher=iTnews |date=8 July 2010 |url=http://www.itnews.com.au/News/219260,nbn-co-releases-14-new-trial-sites.aspx |accessdate=27 April 2011
  150. ^ Broughall, Nick (8 July 2010), The Next 19 NBN Rollout Locations Are…, Gizmodo, http://www.gizmodo.com.au/2010/07/the-next-19-nbn-rollout-locations-are/, retrieved 27 April 2011 
  151. ^ NBN Co (15 December 2010), Corporate Plan 2011–2013, NBN Co, pp. 77, http://www.nbnco.com.au/assets/documents/nbn-co-3-year-gbe-corporate-plan-final-17-dec-10.pdf, retrieved 22 June 2011 
  152. ^ Taylor, Josh (1 April 2011), NBN Co halts network construction tender, ZDNet, http://www.zdnet.com.au/nbn-co-halts-network-construction-tender-339312456.htm, retrieved 27 April 2011 
  153. ^ Taylor, Josh (1 June 2011), Silcar scores $1.1b NBN construction tender, ZDNet, http://www.zdnet.com.au/silcar-scores-11b-nbn-construction-tender-339316004.htm, retrieved 17 June 2011 
  154. ^ Griffin, Rhonda (1 June 2011), NBN Co & Silcar reach agreement to deliver value-for-money fibre rollout, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/construction-mr-1-jun-11.pdf, retrieved 17 June 2011 
  155. ^ Crozier, Ry (17 February 2011), NBN Co buys Austar wireless spectrum for $120m, iTWire, http://www.itnews.com.au/News/248454,nbn-co-buys-austar-wireless-spectrum-for-120m.aspx, retrieved 4 May 2011 
  156. ^ NBN Co (13 July 2011), Spectrum win brings wireless broadband to rural areas starting 2012, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/spectrum-win-brings-wireless-broadband-to-rural-areas-13-jul-11.pdf, retrieved 23 July 2011 
  157. ^ NBN Co (3 August 2011), First communities for National Broadband Network fixed wireless service unveiled, NBN Co, http://nbnco.com.au/news-and-events/news/first-communities-for-national-broadband-network-fixed-wireless-service-unveiled.html, retrieved 4 August 2011 
  158. ^ a b NBN Co (1 July 2011), NBN Co launches Interim Satellite Service for rural and remote Australians, NBN Co, http://www.nbnco.com.au/assets/media-releases/2011/nbn-co-launches-interim-satellite-service-final-1-jul-11.pdf, retrieved 23 July 2011 
  159. ^ Taylor, Josh (6 May 2011), NBN awards $300m interim satellite tender, ZDNet, http://www.zdnet.com.au/nbn-awards-300m-interim-satellite-tender-339314552.htm, retrieved 6 May 2011 
  160. ^ Hutchinson, James (20 June 2011), Productivity Commission investigates NBN Co, iTnews, http://www.abc.net.au/news/stories/2011/03/26/3174347.htm, retrieved 20 June 2011 

External links



Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • National Broadband Network (Australia) — The National Broadband Network is a proposed Fibre to the Node (FTTN) and/or Fibre to the Home (FTTH) network in Australia. The Australian Government has called for proposals to build an Open Access Network providing download speeds of 12… …   Wikipedia

  • Philippine National Broadband Network controversy — The Philippine National Broadband Network controversy (also referred to as the NBN/ZTE deal or NBN/ZTE mess) involved allegations of corruption in the awarding of a US$329 million construction contract to Chinese telecommunications firm ZTE for… …   Wikipedia

  • National broadband plans from around the world — Broadband is a term normally considered to be synonymous with a high speed connection to the internet. The term itself is technology neutral; broadband can be delived by a range of technologies including DSL, LTE or next generation access. This… …   Wikipedia

  • National Broadband Plan (United States) — Connecting America: The National Broadband Plan, unveiled March 16, 2010,[1] is a FCC (Federal Communications Commission) plan which deals with improving broadband Internet access throughout the United States. One goal was providing… …   Wikipedia

  • National Broadband Task Force — The National Broadband Task Force was an initiative of the Government of Canada whose mandate was established in 2001 by the Canadian Minister of Industry,[1] at that time Brian Tobin. The Task Force was chaired by David Lloyd Johnston, and its… …   Wikipedia

  • Community Broadband Network — CBN Type Industrial and Provident Society Industry Broadband networking Founded 2004 …   Wikipedia

  • Hong Kong Broadband Network — Infobox Company company name = Hong Kong Broadband Network company company type = Internet Service Provider company slogan = foundation = 2000 location = Hong Kong key people = industry = products = revenue = operating income = net income = num… …   Wikipedia

  • National Telecommunications and Information Administration — Agency overview Formed 1978 Jurisdict …   Wikipedia

  • Network Convergence — refers to the provision of telephone, video and data communication services within a single network. In other words, one pipe is used to deliver all forms of communication services. The process of Network Convergence is primarily driven by… …   Wikipedia

  • Network neutrality in Canada — Network Neutrality Related issues and topics Automatic telephone exchange Data discrimination End to end principle Internet Protocol Tiered Internet Bandwidth Throttling …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”