Docklands Light Railway

Docklands Light Railway

Docklands Light Railway (DLR)
Overview
Type light metro and light rail/rapid transit
Locale Greater London
Stations 45
Services Bank-Lewisham
Bank-Woolwich Arsenal
Stratford-Lewisham
Tower Gateway-Beckton
Stratford International-Woolwich Arsenal
Stratford International-Beckton
Operation
Opened 31 August 1987
Owner DLR Ltd; part of Transport for London (TfL)
Operator(s) Serco Docklands Ltd
Depot(s) Poplar
Beckton
Rolling stock

DLR rolling stock

3 carriages per trainset
Technical
Line length 34 km (21 mi)
Track gauge 1,435 mm (4 ft 8 12 in) Standard gauge
Electrification third rail, 750 V DC
Operating speed 80 km/h (50 mph)

The Docklands Light Railway is an automated light metro or light rail system opened on 31 August 1987 to serve the redeveloped Docklands area of London.[1] It covers several areas of London, reaching north to Stratford, south to Lewisham, west to Tower Gateway and Bank in the City of London financial district, and east to Beckton, London City Airport and Woolwich Arsenal.

The DLR is operated under a concession awarded by Transport for London to Serco Docklands Ltd, part of the Serco Group. The system is owned by DLR Limited, part of the London Rail division of Transport for London (TfL). In 2006 the DLR carried over 60 million passengers.[2] It has been extended several times and further extensions are being planned. Although it is similar to other public transport systems in London such as the London Underground, DLR trains are not compatible with the Underground network, Crossrail or the wider railway network in Britain.

Contents

History

Origins and development

Tower Gateway station was the DLR's original link to central London.

The docks immediately east of London began to decline in the early 1960s as cargo became containerised.[3] The opening of the Tilbury container docks, further east in Essex, rendered them redundant and in 1980 the British government gained control. The Jubilee line of the London Underground opened in 1979 from Stanmore to Charing Cross as the first stage of an intended cross-town tube line beyond Charing Cross to south-east London.[4] Although land, as at Ludgate Circus and Lewisham, had been reserved for the second stage, the rising cost led to the project's indefinite postponement in the early 1980s.[5]

The London Docklands Development Corporation (LDDC), needing to provide public transport cheaply for the former docks area to stimulate regeneration,[6][7] considered several proposals and chose a light-rail scheme using surviving dock railway infrastructure to link the West India Docks to Tower Hill and to run alongside the Great Eastern lines out of London to a northern terminus at Stratford station where a disused bay platform at the west of the station was available for interchanges with the Central Line and main lines. Stratford was preferred to a Mile End alternative, which would have involved street running trams and was at variance with the concept of a fully automated railway. The growth brought to Docklands enabled the Jubilee Line to be extended in 1999 to east London by a more southerly route than originally proposed, through Surrey Quays/Docks, Canary Wharf and the Greenwich Peninsula (which was the next regeneration area) to Stratford.

The contract for the initial system was awarded to G.E.C. Mowlem in 1984[8] and the system was constructed over three years from 1985 to 1987[9] at a cost of £77 million.[10] The line was opened to the public by Queen Elizabeth II on 30 July 1987, and passenger services began on 31 August of that year.[8]

Initial system (1987–1990)

A first generation DLR EMU crosses West India Dock, September 1987.

The initial system comprised two routes, one from Tower Gateway to Island Gardens and the other from Stratford to Island Gardens. Most of the track on these lines is elevated (either on disused railway viaducts or on newly built concrete viaducts) with some use of disused surface-level railway rights of way, although in the original plans for the DLR the lines were intended to be entirely above ground. The trains have always been fully automated and controlled by computer operations and normally have no driver; a Passenger Service Agent (PSA),[11][12] originally referred to as a "Train Captain", on each train is responsible for patrolling the train, checking tickets, making announcements and controlling the doors. PSAs can also take control of the train in certain circumstances including equipment failure and emergencies.

The system was lightweight, with stations designed for trains with a length of only a single articulated vehicle. The three branches totalled 8 miles (13 km) of route,[13] had 15 stations,[8][14] and were connected by a flat triangular junction near Poplar. Services ran Tower Gateway-Island Gardens and Stratford-Island Gardens, so the north side of the junction was only used for trains to travel to and from the depot at Poplar, not in regular passenger service. The first stations were mostly of a common design and constructed from standard components. A characteristic of them was a relatively short half-cylindrical glazed blue canopy to provide shelter from the rain. All stations were above ground and were generally unstaffed (stations located below ground built during later extensions were required by law to be staffed, in case evacuation is needed).

First stage extensions (1991–1994)

The view from Tower Gateway looking east prior to rebuilding shows Fenchurch Street approach tracks to the left, the original DLR line in the centre, and just visible in the distance is a DLR train which has emerged from the tunnel to Bank to the right.

The initial system had little capacity, but the Docklands area very quickly developed into a major financial centre and employment zone, increasing the demand on the fledgling commuter network. In particular Tower Gateway, at the edge of the City of London, attracted criticism for its poor connections. This is partly because the system experienced higher than expected levels of usage.[15] Plans were developed to extend to Bank and to Beckton before the system opened to the public.[16] As a result, all stations and trains were extended to two-unit length, and the system was extended into the heart of the City of London to Bank underground station through a new tunnel which opened in 1991.[17] This extension diverged from the initial western branch, leaving Tower Gateway station on a stub. The original trains, not suitable for use underground, became obsolete (see the Rolling Stock section below, and the main article Docklands Light Railway rolling stock).

As the Canary Wharf office complex grew, Canary Wharf DLR station was redeveloped from a small wayside station to a large one with six platforms serving three tracks, with a large overall roof, fully integrated into the malls below the office towers.[18] The original DLR station was never completed and was dismantled before the line officially opened, although the automatically operated trains continued to stop at its location.

The areas in the east of Docklands needed better transport connections to encourage development and so a fourth branch was opened in 1994,[8] from Poplar to Beckton via Canning Town transport interchange, running along the north side of the Royal Docks complex. Initially it was thought likely to be underutilised, due to sparse development.[19] Several proposals were made for the Blackwall area.[20] As part of this extension, one side of the original flat triangular junction was replaced with a grade-separated junction west of Poplar, and a new grade-separated junction was built at the divergence of the Stratford and Beckton lines east of Poplar. Poplar station was rebuilt to give cross-platform interchange between the Stratford and Beckton lines.

Second stage extensions (1996–1999)

DLR platforms at Greenwich station, a northbound train approaching the station

Early in the DLR operation, Lewisham London Borough Council commissioned a feasibility study into extending the DLR under the River Thames. This led the council to advocate an extension to Greenwich, Deptford and Lewisham. In its early days, the DLR had been criticised by some experts as being "the wrong type of system for Docklands' needs", in comparison with the Underground line proposed in the 1980s.[21] However, the ambitions of operators were supported by politicians in Parliament, including then Labour Deputy Prime Minister John Prescott[22], and Lord Whitty,[23] and by 1996 construction work on the line had begun as proposed.[18]

On 3 December 1999 the Lewisham extension opened to the public.[24] It left the original Island Gardens route south of the Crossharbour turn-back sidings, dropped gently to Mudchute where a street-level station replaced the high-level one on the former London & Blackwall Railway viaduct, and then entered a tunnel following the line of the viaduct and reached a new shallow subsurface station at Island Gardens, accessed by stairs. The line crossed under the Thames to Cutty Sark, a station in the centre of Greenwich, and then surfaced at the main-line Greenwich station with cross-platform interchange between the northbound DLR track and the city-bound main line. Then the line snaked on a concrete viaduct to Deptford, Elverson Road station at street level, close to Lewisham town centre and terminated in two platforms between and below the main-line platforms at Lewisham railway station, which is near the town shopping centre, with bus services stopping directly outside the station. The Lewisham extension quickly proved profitable.[25]

Third stage extensions and enhancements (2004–2009)

Route of Woolwich Arsenal extension.

The next series of developments of the DLR were aided by a five-year programme of investment for public transportation across London that was unveiled by Mayor of London Ken Livingstone on 12 October 2004.[26] On 2 December 2005, a new eastward branch, along the route of the former Eastern Counties and Thames Junction Railway on the southern side of the Royal Docks complex, opened from Canning Town to King George V via London City Airport.[27]

A further extension link from King George V to Woolwich Arsenal opened on 10 January 2009, with the terminal station built at or close to the planned future stop on the Crossrail line to Abbey Wood via West India and Royal Docks.[28], met by Private Finance Initiative funding.[29] Construction began in June 2005, the same month that the contracts were finalised,[30] and the tunnels were completed on 23 July 2007,[31] and officially opened by Boris Johnson, Mayor of London on 12 January 2009.[32] Following completion, this project was shortlisted for the 2009 Prime Minister's Better Public Building Award.[33]

The original Tower Gateway station was closed in mid-2008 for complete reconstruction. The two terminal tracks either side of a narrow island platform were replaced by a single track between two platforms, one for arriving passengers and the other for those departing. The station reopened on 2 March 2009.[34][35]

As part of an upgrade to the system to allow three-car trains, some strengthening work was necessary at the Delta Junction north of West India Quay. It was decided to include this in a plan for further grade-separation at this critical junction to eliminate the conflict between services to Stratford and from Bank. Following this, a new timetable has been introduced with improved frequencies in peak hours. The new grade-separated route from Bank to Canary Wharf is only used at peak times as it bypasses West India Quay station.[36] Work on this project proceeded concurrently with the three-car upgrade work and the 'flyunder', and the improved timetable came into use on 24 August 2009.[37]

Olympics Extension (2011)

In addition to the 3-car station extensions, part of which was funded from the 2012 Olympics budget, a further DLR line was opened from Canning Town to Stratford, and onwards to Stratford International. This was built along the line of the former North London Line of the national rail system, with a number of additional, closer spaced stations, and also parallels the London Underground Jubilee Line for much of its length. As part of the project a substantial multi-level flying junction was built south of Canning Town to enable trains from both the Bank/Poplar direction, and also from the Stratford International direction, to operate to either of the eastern termini at Beckton ad Woolwich Arsenal, and the train service provides through services between all these points, although with different patterns at different times of the day. The Stratford International extension suffered some delay in opening, finally being completed in September 2011. It provides a direct link between two of the major Olympics locations, the main stadium at Stratford and the Excel Centre adjacent to Custom House station on the Beckton line.

Current system

Overview

Shadwell DLR train coming in to the station

The DLR is now 19 miles (31 km) long,[38] with 45 stations along the route. There are six branches: to Lewisham in the south, to Stratford and Stratford International in the north, to Beckton and to Woolwich Arsenal in the east, and to Central London in the west, splitting to serve Bank and Tower Gateway.[39] Although the layout allows many different combinations of routes, at present the following six are operated in normal service:

  • Stratford to Lewisham
  • Bank to Lewisham
  • Bank to Woolwich Arsenal
  • Tower Gateway to Beckton
  • Stratford International to Woolwich Arsenal (Weekday peak hours only)
  • Stratford International to Beckton

There is an additional shuttle service from Canning Town to Prince Regent, operated when exhibitions are in progress at the ExCeL exhibition centre, to double the normal service. These trains reverse direction in the eastbound platform at Canning Town and on a crossover at the high point where the line crosses the Connaught Crossing road bridge between Prince Regent and Royal Albert stations.

At other stations trains reverse direction in the terminal platforms, except at Bank where there is a reversing headshunt beyond the station. Some peak hour trains on the Stratford line turn back at Crossharbour rather than continuing to Lewisham. There are also occasional trains from Tower Gateway to Crossharbour and Lewisham. Trains serve every station on the route with the exception of peak services from Westferry to Canary Wharf. These services are unable to call at West India Quay because they are routed along a different track to avoid junction conflicts. During the substantial long-term works for various DLR extension projects, a range of other routes may be operated at weekends, such as Beckton to Lewisham if the Bank branch is closed.

The northern, southern and south-eastern branches terminate at the National Rail (main line) stations at Stratford, Stratford International, Lewisham and Woolwich Arsenal. Other direct interchanges between the DLR and National Rail are at Limehouse, Greenwich and West Ham.

Map

Dlr extract for wiki

Stations

An eastbound train leaving Westferry Station.

Most DLR stations are elevated, with others at street level, in a cutting, or underground. Access to the platforms is mostly by staircase and lift, although there are escalators at some stations. From the outset the network has been fully accessible to wheelchairs; much attention was paid to quick and effective accessibility for all passengers.[38] The stations have high platforms, matching the floor height of the cars, allowing easy access for passengers with wheelchairs or pushchairs.

Most stations are of a modular design dating back to the initial system, extended and improved over the years. This design has two side platforms, each with separate access from the street, and platform canopies with a distinctive rounded roof design. Stations are unstaffed, except the underground stations at Bank, Island Gardens, Cutty Sark and Woolwich Arsenal (for safety reasons), a few of the busier interchange stations and City Airport which has a manned ticket office to cater for passengers unfamiliar with the system. Canning Town, interchange with the Jubilee line, along with the exhibition centre stations at Custom House and Prince Regent, are normally staffed on the platform whenever there is any significant exhibition at the ExCeL exhibition centre. During the recent engineering works which have closed the Bank branch, additional staff were present at Tower Gateway to ensure the larger numbers of passengers using the station were able to board/exit trains safely.

On 3 July 2007, DLR officially launched[40] an art programme called DLR Art,[41] similar to that on the London Underground, Art on the Underground. Alan Williams was appointed to produce the first temporary commission, called "Sidetrack", which portrays the ordinary and extraordinary sights often unfamiliar to passengers, on the system and was displayed throughout the network.[42]

Fares and ticketing

A train awaits departure from Woolwich Arsenal.

Ticketing on the DLR is part of the London fare zone system, and Travelcards that cover the correct zones are valid. There are one-day and season DLR-only "Rover" tickets available, plus a one-day DLR "Rail and River Rover" ticket for use on the DLR and on City Cruises river boats. Oyster Pre-Pay is also available;[43] passengers need to both touch in and touch out on the platform readers or pass through the automatic gates. Tickets must be purchased from ticket machines at the entrance to the platforms, and are required before the passenger enters the platform. There are no ticket barriers in DLR-only stations,[44] and correct ticketing is enforced by on-train checks by the PSA. There are barriers at Bank, Canning Town, Woolwich Arsenal and Stratford, where the DLR platforms are within the barrier lines of a London Underground or National Rail station.

Although Oyster cards are TfL's preferred method of ticketing on the DLR, there are some differences in the implementation compared to the Underground. Stations are basic and most do not have ticket gates. There have been criticisms[by whom?] that the Oyster touch in/out units are not readily apparent, particularly to infrequent passengers, as they have been sited where there is an electrical supply, which may not be the most obvious point for users. London City Airport station, which is used by many travellers from overseas, is a particular example of this.[citation needed]

Performance

The DLR is now used by up to 100,000 people every day. Within a year of launch, annual passenger numbers were 17 million.[45] By 2009 this had increased to 64 million.[2][45] While the first five years were plagued by unreliability and operational problems,[46] the system has now become highly reliable.[46] In 2008, 87% of the population of North Woolwich were in favour of the DLR.[47]

The Parliamentary Transport Select Committee has reviewed light rail.[48] Due to the success of the DLR, proposals for similar systems elsewhere have emerged. The North and West London Light Railway is one such plan for an orbital railway serving the other side of London.[49]

The Docklands Light Railway has been successful, as with other light rail systems built in recent years.[50] However, the DLR has been criticised for having been designed with insufficient capacity to meet the demand that quickly arose.[21] The level of demand was underestimated.[15][18] In 1989 such criticism was aimed at GEC, a major contractor for the DLR construction.[51] There remains debate in the UK as to whether light rail is cost-effective, with criticism focused on alleged low ridership and cost overruns.[52]

Although DLR claims to be highly accessible,[38] the only bicycles allowed on its trains are folding ones. One incident involved a station manager refusing to allow a train to leave before several triathlon competitors had to leave the vehicle. DLR says this is because if evacuation of a train is required, they would slow down the process. DLR cars are not designed with bicycles in mind – if they were allowed, they might obstruct doors and emergency exits.[53]

Rolling stock

A B07 rolling stock at Poplar DLR station

The DLR is operated by high-floor, bi-directional, single-articulated electrical multiple unit cars. Each car has four doors on each side, and two or three cars make up each train.[54] There are no driver's cabs because normal operations are automated. Instead, the cars have a small driver's console (concealed behind a locked panel at each car end) from which the PSA (Passenger Service Agent) can drive the car.[55] Consoles at each door opening allow the PSA to control door closure and make announcements whilst patrolling the train. Because of the absence of a driver's position, the fully glazed car ends provide an unusual forward (or rear) view for passengers. The current stock has a top speed of 100 kilometres per hour (62 mph).

Despite having high floors and being highly automated, the cars are derived from a German light-rail design intended for use in systems with street running. All the cars that have operated on the system to date look similar, but there have been several different types, some still in service and others sold to other operators. New units (B2007) for the Docklands Light Railway were purchased from Bombardier in 2005 and delivered between 2007 and 2010.[56]

There are two operating and maintenance depots. The first was built at Poplar, but its is now secondary to the larger site at Beckton, built on the site of the former Beckton Gas Works in 1996. Rolling stock is kept at both locations, furnished with maintenance workshops and extensive open-air carriage sidings. The Poplar depot, which is also the operating headquarters of DLR Limited and Serco Docklands, contains diesel locomotives used for track maintenance tasks. Poplar is located alongside the north side of the Stratford line east of the station, while the Beckton depot is to the east of the line on a long spur north-east of Gallions Reach station.

Signalling technology

Originally the DLR used signalling based on a fixed-block technology developed by GEC-General Signal and General Railway Signal.[9] This was replaced in 1994 with a moving-block TBTC (Transmission Based Train Control) system developed by Alcatel, called SelTrac. The SelTrac system was bought by Thales in 2007 and current updates are being provided by Thales Rail Signalling Solutions. The same technology is used for some other rapid transit systems, including Vancouver's SkyTrain, Toronto's SRT, San Francisco's Municipal Railway (MUNI) and Hong Kong's MTR, the SelTrac S40 system is currently being adopted by the Jubilee line and Northern line on London Underground. Transmissions occur via an inductive loop cable between each train's Vehicle On-Board Controller (VOBC) and the control centre (VCC, SMC) at Poplar. If this link is broken i.e. communication is lost between the VOBC and VCC, SMC, the train emergency brakes and stops until it is authorised to move again. If the whole system fails the train can run in restricted manual at only 12 miles per hour (19 km/h) for safety until the system is restored and communication is re-established. Emergency brakes can be applied if the train breaks the speed limit during manual control or overshoots a fixed stopping point, or if the train leaves the station when the route has not been set.[13]

SelTrac: Standard Elektrik Lorenz Transport Control System VOBC: Vehicle On-Board Controller SMC: System Management Center VCC: Vehicle Control Center

Current developments

With the development of the eastern Docklands as part of the Thames Gateway initiative and London’s successful bid for the 2012 Summer Olympics, several extensions and enhancements are under construction, being planned or being discussed.[57]

Upgrading entire system to three-car trains

Status – Complete
Cutty Sark Station, Southbound platform 1 looking south

The capacity of the entire system has been increased by upgrading it to take three-car trains. The alternative of more frequent trains was rejected as the signalling changes needed would have cost no less than upgrading to longer trains and with fewer benefits.[58] The railway was originally built for single-car operation, and the upgrade required both strengthening viaducts to take the heavier longer trains and lengthening many platforms;[59] however, recent extensions were already built to take three-car trains. It has been suggested that the extra capacity will be useful during the 2012 Summer Olympics, which are expected to increase the use of London's transport network.[60] The main contractor selected to carry out the expansion and alteration works on the DLR network was Taylor Woodrow.[61]

A few stations (Elverson Road, Pudding Mill Lane (one platform Stratford-bound), Royal Albert, Gallions Reach, Cutty Sark) have not been extended to accept three-car trains; such extension may be impossible in some cases. Selective door operation will be used instead, with emergency walkways in case a door fails to remain shut. For instance Cutty Sark station is underground, and both costs and the risk to nearby historic buildings prevent platform extension. The tunnel there was built with an emergency walkway throughout its length. Additional work beyond that needed to take the three-car trains has been carried out at some stations. This included replacing canopies with more substantial ones along the full platform length. A new South Quay station has been built 200 metres (660 ft) to the east of the former location as nearby curves precluded lengthening. Mudchute now has a third platform and all its platforms have full-length canopies.[62] Tower Gateway was closed until March 2009 and re-opened as a single-track three-car terminus with two platforms – one side for boarding and the other for alighting.

For this upgrade DLR purchased an additional 31 cars compatible with existing rolling stock to meet the demand for more train units.[63] The works were originally planned as three separate phases: Bank-Lewisham, Poplar-Stratford, and finally the Beckton branch. The original £200m works contract was awarded on 3 May 2007.[64] Work started in 2007 and the Bank-Lewisham phase was originally due to be completed in 2009. However, the work programme for the first two phases was merged and the infrastructure work was completed by the end of January 2010. The Lewisham-Bank route now exclusively runs three-car trains on Mondays-Fridays. They started running on the Beckton branch on 9 May 2011.[65] Other routes will run the longer trains when demand builds up to require it.

Stratford International extension

Status – Complete
Abbey Road station shown under construction in April 2010.
Stratford station in December 2009, showing the new DLR line and platforms under construction, this was formerly the North London Line platforms

The extension to Stratford International station taking over that part of the North London Line from Canning Town to Stratford, links the Docklands area with domestic and international high-speed services on High Speed 1. It is an important part of transport improvements for the 2012 Olympic Games, much of which will be held on a site adjoining Stratford International.[66] The first contract for construction work was awarded on 10 January 2007[67] and construction work started in mid 2007. Originally scheduled to open in mid 2010,[68] the line opened to public service on the 31 August 2011.[69]

Station names in bold are former North London Line stations.

New stations for DLR are:

From Canning Town to Stratford low level the Stratford International extension runs parallel to the London Underground Jubilee line. As well as providing an interchange with the adjacent Jubilee line stations there will be additional DLR-only stations at Star Lane, Abbey Road and Stratford High Street.

At Stratford new platforms have been built for the North London Line at a new location at the northern end of the station. The old platforms (formerly 1 and 2) adjacent to the Jubilee line have been rebuilt for the DLR and are renumbered 16 (towards Stratford International) and 17 (towards Beckton/Woolwich Arsenal). Interchange between the Stratford International branch and DLR trains via Poplar will be possible although their platforms are widely separated and at different levels. There is no physical connection between the two branches. As part of the Transport & Works Act (TWA) application, Royal Victoria station on the Beckton branch has been be extended to accommodate three-car trains, with a siding to enable trains to reverse there, using land released by the closure of this section of the parallel North London Line. A partly grade-separated junction has been built south of Canning Town to prevent conflicting movements between the existing Bank branch and the Stratford International branch going to and from the Beckton and Woolwich Arsenal branches.

Relocation of Pudding Mill Lane station

Status – Under Construction

When Crossrail is built, one of its tunnel portals will be on the current site of Pudding Mill Lane station. As a consequence, work has begun to divert the DLR between City Mill River and the River Lea onto a new viaduct to be built further south. This will include a replacement station.[70] The current station is situated on the only significant section of single track on the system, between Bow Church and Stratford;[71] the opportunity may be taken to double the track here to improve capacity, although there is no provision for works beyond the realigned section in the Crossrail Act.

Proposed developments

Dagenham Dock extension

Dagenham Dock railway station has been proposed as the new terminus of the extension
Status – Not currently being developed

This proposed extension from Gallions Reach to Dagenham Dock via the riverside at Barking would connect the Barking Reach area, a formerly industrial area now due to be a major redevelopment as part of the London Riverside, with the Docklands.[72] It would cover major developments at Creekmouth, Barking Riverside, Dagenham Dock Opportunity Area, and five stations are planned, at Beckton Riverside station, Creekmouth, Barking Riverside, Goresbrook (formerly Dagenham Vale) and Dagenham Dock. The extension is key if English Partnerships' plan is to work. As shown in DLR's first consultation leaflet,[73] there are proposals for the DLR to extend further than Dagenham Dock, possibly to Dagenham Heathway or Rainham.[74]

Construction was not expected to start until 2013, and the earliest expected completion date was 2017.[75] However, the financial downturn meant that TfL requested a delay to the public enquiry whilst funding was clarified.[76] Given that the purpose of the extension was to serve as-yet unbuilt homes, it became very difficult to predict timescales for this project. The project has been reported to have been cancelled by the Mayor of London Boris Johnson as a cost-cutting measure,[77][78] although there have been calls for this to be reconsidered,[79][80] the extension being regarded by Barking and Dagenham council as essential to regenerating the area.[81]

In October 2009, the plan had seemed to be once again under consideration. The Mayor's Transport Strategy stated that the Mayor, through Transport for London, would investigate the feasibility of the extension to Dagenham Dock as part of the housing proposals for Barking Riverside.[82]

Thames Wharf station

Status – On hold

This station had been included as potential future development on the London City Airport extension since it was first planned.[83] It would be between Canning Town and West Silvertown, due west of the western end of Royal Victoria Dock. Since the station's intended purpose is to serve the surrounding area (currently a mix of brownfield and run-down industrial sites) when it is regenerated, the development is indefinitely on hold due to the area being safeguarded for the Silvertown Link,[84] a new Thames river crossing that has been proposed but currently has no timetable for implementation.

Connaught Road/Silvertown Interchange station

Status – Proposed

A site near to London City Airport has been identified as a possible additional station on the London City Airport branch. The Connaught Tunnel is here, and will be used again when some of the former Custom House to North Woolwich section of the Eastern Counties and Thames Junction Railway is taken over by Crossrail.[85] However, no plans have emerged as if or when a station might be built here, even though the original extension was designed to allow this. It may be located south of the Connaught Crossing.[86]

Victoria/Charing Cross extension

Charing Cross tube station of the London Underground, an extension to the DLR is proposed to connect to it
Docklands Light Railway flag box
Status – Proposed – 2006

In February 2006 a proposal to extend the DLR to Charing Cross station from Bank DLR branch was revealed.[71] The idea, originating from a DLR "Horizon Study", is at a very early stage at the moment, but would involve extending the line from Bank in bored tunnels under Central London to the Charing Cross Jubilee Line platforms, which would be brought back to public use. These platforms are now on a spur off the current Jubilee line and are not used by passenger trains. It has since been revealed that a proposed route as far as Victoria station will be investigated.[87]

While not confirmed, it is probable that the scheme would also use the existing overrun tunnels between the Charing Cross Jubilee platforms and a location slightly to the west of Aldwych. These tunnels were intended to be incorporated into the abandoned Phase 2 of the Fleet Line (Phase 1 became the original Jubilee Line, prior to the Jubilee Line Extension).[88] However they would need some enlargement because DLR gauge is larger than tube gauge and current safety regulations would require an emergency walkway to be provided in the tunnel.

Two reasons driving the proposal are capacity problems at Bank, having basically one interchange between the DLR and the central portion of Underground, and the difficult journeys faced by passengers from Kent and South Coast between their rail termini and the DLR. Intermediate stations would be at Ludgate Circus and Aldwych, which was intended for future connection with the proposed but now abandoned Cross River Tram.

Euston/King's Cross extension

Status – Proposed

During the last Horizon study, a possible extension was considered from Bank towards Euston or London King's Cross.[89] The main benefit of such an extension would be to broaden the available direct transport links to the Canary Wharf site. It would create a new artery in central London and help relieve the Northern and Circle lines. There are no official plans for possible stations except towards Farringdon, possibly using some of the disused Thameslink infrastructure.[citation needed]

Lewisham to Catford extension

Status – Proposed – 2006

This possible extension was considered during the latest Horizon Study. The route would follow the Southeastern line and terminate between Catford and Catford Bridge stations. It has been seen as attractive to the district, as has the current terminus at Lewisham which was built in an earlier extension.[90][91] However, early plans showed problems due to Lewisham DLR station being only marginally lower than the busy A20 road which impedes any proposed extension. The plan is however being revised.[92] When the Lewisham extension was first completed there were proposals to continue further to Beckenham to link it up with the Tramlink system. However, the way in which Lewisham DLR was built impedes this possible extension and it would prove costly to redevelop.[citation needed]

Accidents and incidents

Overrun of station buffers

The original Island Gardens DLR station located at the end of a viaduct

On 10 March 1987, before the railway opened, a test train crashed through station buffer stops at the original high-level terminus Island Gardens station and was left hanging from the end of the elevated track. The accident was caused by unauthorised tests being run before accident-preventing modifications had been installed. The train was being driven manually at the time.[93][94][95]

Collision at West India Quay bridge

On 22 April 1991, two trains collided at a junction on the West India Quay bridge during morning rush hour, requiring a shutdown of the entire system and evacuation of the involved passengers by ladder.[96][97] One of the two trains was travelling automatically, operating without a driver, while the other was under manual control.[98]

South Quay bombing

On 9 February 1996, the Provisional Irish Republican Army blew up a lorry under a bridge near South Quay,[99] killing two people and injuring many others. This number would have been higher had there not been an advance warning.[100] The blast caused £85 million of damage and marked an end to the IRA ceasefire. Significant disruption was caused to DLR services, and a train was left stranded at Island Gardens station, unable to move until the track was rebuilt.

Management

The DLR is owned by DLR Limited, part of the London Rail division of TfL, which also manages London Overground, London Tramlink and Crossrail. London Rail first awarded the concession to operate the DLR in 1997 to Serco Docklands Ltd, a joint organisation of the former DLR management team and Serco Group. Serco has won all subsequent contracts, the latest being a seven-year contract awarded in May 2006. Three recent extensions, Lewisham, City Airport and Woolwich Arsenal, have also been designed, financed, built and now maintained by private companies: City Greenwich Lewisham (CGL) Rail, City Airport Rail Enterprises (CARE) and Woolwich Arsenal Rail Enterprises (WARE).[101]

Prior to 1997, the DLR was a wholly owned subsidiary of London Regional Transport. In 1992 it was transferred to the London Docklands Development Corporation, sponsored by the Department of Environment. In 1994 it was announced that the DLR would be privatised, which led to the concession being granted to Serco in 1997.[101]

See also

References

  1. ^ Cross, David (1 September 1987). "Enthusiasts flock to busy opening day: Docklands Light Railway". The Times (London). http://find.galegroup.com/itx/generateInfomark.do?docType=IAC&contentSet=IAC-Documents&type=retrieve&tabID=T004&PDFRange=%5B%5D&pageNumber=&docId=CJ117571103&searchId=R3&prodId=SPN.SP00&currentPosition=7&userGroupName=kccl&qrySerId=Locale%28en%2C%2C%29%3AFQE%3D%28ke%2CNone%2C23%29docklands+light+railway%3AAnd%3ALQE%3D%28DA%2CNone%2C19%2919870101+-+19871231%24&inPS=true&pageIndex=0. Retrieved 17 August 2009. 
  2. ^ a b "Docklands Light Railway carries 60 million passengers" (Press release). Transport for London. 4 April 2007. http://www.tfl.gov.uk/corporate/media/newscentre/archive/4825.aspx. Retrieved 9 July 2008. [dead link]
  3. ^ "The closure of the docks: The end of the upstream docks". bardaglea.org.uk. http://www.bardaglea.org.uk/docklands/9-the-end.html. Retrieved 24 June 2009. [dead link]
  4. ^ "Clive's Underground Line Guides: Jubilee Line". Clive's UndergrounD Line Guides. http://www.davros.org/rail/culg/jubilee.html#dates. Retrieved 26 June 2009. 
  5. ^ "Various route options for the London Underground dating from the 1960s to 1980s". London Docklands Development Corporation. http://www.lddc-history.org.uk/transport/3tran1.jpg. Retrieved 17 April 2007. 
  6. ^ "The key to Docklands accessibility- a public transport spine". London Docklands Development Corporation. http://www.lddc-history.org.uk/transport/tranmon2.html#DLRResolving. Retrieved 25 June 2009. 
  7. ^ Russell, Helena (19 February 1998). "Transport: Being there". New Civil Engineer (London). http://www.nce.co.uk/transport-being-there/840825.article. Retrieved 25 June 2009. 
  8. ^ a b c d "Docklands Light Railway (D.L.R.) – Exploring 20th Century London". Exploring 20th Century London. http://www.20thcenturylondon.org.uk/server.php?show=conInformationRecord.27. Retrieved 3 September 2009. 
  9. ^ a b Jolly, Stephen; Bayman, Bob (November 1986). Docklands Light Railway Official Handbook. Harrow Weald: Capital Transport Publishing. ISBN 0 904711 80 3. 
  10. ^ "Opening of the Docklands Light Railway," Roger Ford, Modern Railways, September 1987
  11. ^ "Technology: Signalling & Control". Transport for London. http://www.tfl.gov.uk/corporate/modesoftransport/dlr/keyfacts/1546.aspx. Retrieved 29 August 2007. 
  12. ^ "The Docklands Light Railway, London, UK". BBC – h2g2. http://www.bbc.co.uk/dna/h2g2/A9948757. Retrieved 29 August 2007. 
  13. ^ a b "Docklands Light Railway Extensions, London, United Kingdom". Railway-Technology.com. http://www.railway-technology.com/projects/docklands/index.html. Retrieved 9 July 2008. 
  14. ^ "Mayor of London – Transport Strategy – DLR". London.gov.mt. http://www.london.gov.uk/mayor/transport/dlr.jsp. Retrieved 3 September 2009. [dead link]
  15. ^ a b "New Games transport link marks 20 years of progress". London 2012 Official Blog. 13 January 2009. http://www.london2012.com/blog/2009/01/13/new-games-transport-link-marks-20-years-of-dlr-progress.php. Retrieved 24 June 2009. 
  16. ^ "Hansard". 6 May 1987. http://hansard.millbanksystems.com/written_answers/1987/may/06/docklands-light-railway#S6CV0115P0_19870506_CWA_30. 
  17. ^ "Ben Roskrow reports on Nuttal's extension of the Docklands Light Railway". Construction News. 16 February 1990. http://www.cnplus.co.uk/news/16feb90-uk-ben-roskrow-reports-on-nuttalls-extension-of-the-docklands-light-railway-(1-of-2)/1689334.article. Retrieved 25 June 2009. 
  18. ^ a b c DLR history timeline TfL official site. Retrieved 3 September 2007.
  19. ^ Widdicombe, Gillian (30 March 1994). "Architecture: A driverless train, a blighted destination". The Independent (London). http://www.independent.co.uk/arts-entertainment/art/news/architecture-a-driverless-train-a-blighted-destination-a-railway-deep-into-londons-docklands-emphasises-the-potential-yet-to-be-realised-in-the-east-says-gillian-widdicombe-1432567.html. Retrieved 24 June 2009. 
  20. ^ "Options for the DLR Beckton Extension route". http://www.lddc-history.org.uk/transport/3tran15.jpg. Retrieved 23 February 2008. 
  21. ^ a b Wolmar, Christian (25 January 1995). "Crucial links hold key to the future: Docklands, a special report". The Independent (London). http://www.independent.co.uk/life-style/crucial-links-hold-key-to-the-future--docklands-a-special-report-1569645.html. Retrieved 24 June 2009. 
  22. ^ "Prescott backs DLR airport extension". New Civil Engineer. http://www.nce.co.uk/prescott-backs-dlr-airport-extension/844052.article. Retrieved 25 June 2009. 
  23. ^ "DLR: Take off for airport link" (Press release). M2 Presswire. 18 February 1999. http://www.highbeam.com/doc/1G1-53908044.html. Retrieved 25 June 2009. 
  24. ^ De Haan, Judy (29 August 2000). "Getting Back On The Right Track (letter to the editor)". The Bolton News. http://www.theboltonnews.co.uk/news/344110.credit_crunch_shows_signs_of_easing. Retrieved 25 June 2009. 
  25. ^ Withers, Malcolm (8 March 2001). "DLR helps Mowlem ride high at £25 million". London Evening Standard. http://www.highbeam.com/doc/1G1-75307455.html. Retrieved 25 June 2009. 
  26. ^ Muir, Hugh (12 October 2004). "Mayor unveils £10bn scheme for capital's transport". The Guardian (London). http://www.guardian.co.uk/uk/2004/oct/12/transport.london. Retrieved 28 June 2009. 
  27. ^ "Docklands Light Railway reaches City airport". The Times (London). 6 December 2005. http://www.timesonline.co.uk/tol/travel/business/article749409.ece. Retrieved 25 June 2009. 
  28. ^ {{Cite news |url=http://www.railway-technology.com/projects/docklands/docklands11.html |title=An extension to the DLR is being built between King George V and Woolwich Arsenal. Government approval for the project was given in February 2004, with a projected cost of £150 million, due to a required second DLR tunnel crossing of the River Thames
  29. ^ "New DLR extension wins approval". BBC News Online. 26 February 2004. http://news.bbc.co.uk/1/hi/england/london/3489298.stm. Retrieved 24 June 2009. 
  30. ^ "AMEC, RBoS jv finalise contract for DLR extension to Woolwich Arsenal". Forbes. 6 January 2005. http://www.forbes.com/feeds/afx/2005/06/01/afx2068185.html. Retrieved 24 June 2009. 
  31. ^ "Tunnel extending Docklands Light Railway to Woolwich completed" (Press release). Transport for London. 23 July 2007. http://pressroom.dlr.co.uk/news/details.asp?id=141. Retrieved 29 June 2008. 
  32. ^ "Mayor unveils DLR Woolwich Arsenal station" (Press release). Transport for London. 12 January 2009. http://www.tfl.gov.uk/static/corporate/media/newscentre/archive/10970.html. Retrieved 17 January 2009. [dead link]
  33. ^ "DLR extension award". Construction News. 10 June 2009. http://www.cnplus.co.uk/sectors/transport/dlr-extension-award/5203213.article. Retrieved 24 June 2009. 
  34. ^ "Tower Gateway Station – Now Open". Transport for London. http://improvements.dlr.co.uk/project_updates/towergateway.asp. Retrieved 21 June 2009. 
  35. ^ "DLR Terminal suddenly reopens: Taking passengers by surprise". East London Advertiser (Ilford). http://www.eastlondonadvertiser.co.uk/content/towerhamlets/advertiser/news/story.aspx?brand=elaonline&category=news&tBrand=northlondon24&tCategory=newsela&itemid=WeED02%20Mar%202009%2008%3A51%3A29%3A073. Retrieved 21 June 2009. 
  36. ^ "Docklands Light Railway (DLR) Delta Junction Grade Separation". Transport for London. http://developments.dlr.co.uk/pdf/enhancements/phase2/delta.pdf. Retrieved 21 June 2009. 
  37. ^ "Docklands Light Railway – West India Quay/Poplar Junction Improvements". Transport for London. http://developments.dlr.co.uk/enhancements/capacity/wiqpoplar.asp. Retrieved 1 August 2009. 
  38. ^ a b c "History". Transport for London. http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1538.aspx. Retrieved 9 July 2008. 
  39. ^ "Docklands Light Railway". visitlondon.com. http://www.visitlondon.com/travel/getting_around/docklands-light-railway. Retrieved 21 June 2009. 
  40. ^ "Docklands Light Railway draws up public arts strategy". Transport for London. 3 July 2007. http://pressroom.dlr.co.uk/news/details.asp?id=139. Retrieved 23 February 2008. 
  41. ^ "Docklands Light Railway". DLR Art. http://www.dlrart.co.uk/. Retrieved 5 August 2010. 
  42. ^ "Alan Williams – Sidetrack". Docklands Light Railway. http://www.dlrart.co.uk/projects/view.asp?id=8. Retrieved 25 June 2009. 
  43. ^ "London jetpack: London Oyster travelcard". studentjetpacks.com. http://www.studentjetpacks.com/jetpacks_london_oystercard.asp. Retrieved 21 June 2009. 
  44. ^ Webster, Ben; Clennell, Andrew (5 January 2004). "Tube errors may cost you dear". The Times (London). http://www.timesonline.co.uk/tol/news/uk/article842314.ece. Retrieved 24 June 2009. 
  45. ^ a b "Docklands Light Railway (DLR) boasts an impressive operational record". Transport for London. http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1536.aspx. Retrieved 24 June 2009. 
  46. ^ a b "DLR: resolving the problems". The LDDC History Pages. http://www.lddc-history.org.uk/transport/tranmon2.html#DLRResolving. Retrieved 11 July 2008. 
  47. ^ "North Woolwich Research: Changes, 2006–2008 – The influence of Docklands Light Railway". lcacc.org. http://www.lcacc.org/access/north-woolwich-research-report.pdf. Retrieved 26 June 2009. 
  48. ^ "Horses for Courses: The Advantages of Light Rail". Transport Select Committee. Parliament – House of Commons. 3 April 2005. http://www.publications.parliament.uk/pa/cm200405/cmselect/cmtran/378/37805.htm. 
  49. ^ Flintoff, John-Paul (17 September 2009). "Orbital rail the solution to city congestion?". The Times (London). http://timesonline.typepad.com/environment/2009/09/orbital-rail-the-solution-to-city-congestion.html. Retrieved 16 December 2009. [dead link]
  50. ^ "Light Rail – the Solution to Inner-City Chaos?". Railway Technology. http://www.railway-technology.com/features/feature1953/. Retrieved 26 June 2009. 
  51. ^ "GEC escape criticism over London's Docklands Light Railway". cbronline.com. 8 June 2007. http://www.cbronline.com/news/gec_escape_criticism_over_londons_docklands_light_railway. Retrieved 26 June 2009. 
  52. ^ Clark, Andrew (23 April 2004). "Tram systems 'too costly and underused'". The Guardian (London). http://www.guardian.co.uk/society/2004/apr/23/communities.politics. Retrieved 28 June 2009. 
  53. ^ "DLR bans Triathlon cyclists". London Evening Standard. 8 June 2007. http://www.thisislondon.co.uk/events/article-23407230-details/Last+one+in+the+water+is+toast/article.do. Retrieved 26 June 2009. 
  54. ^ DLR Key Facts. railway-technology.com
  55. ^ "Unmanned Train: DLR Respond". The Londonist. http://londonist.com/2007/11/unmanned_train.php. Retrieved 24 June 2009. 
  56. ^ "Bombardier receives a $94 million US order from Docklands Light Railway for automatic Light Rail cars to be used in London, UK" (Press release). Montreal: Bombardier. 4 May 2005. http://bombardier.com/en/corporate/media-centre/press-releases/details?docID=0901260d8000fc2d. Retrieved 14 July 2009. 
  57. ^ "Docklands Light Railway – Development Projects". Transport for London. http://developments.dlr.co.uk/index.asp. Retrieved 9 July 2008. 
  58. ^ "Docklands Light Railway – Three-carriage Capacity Enhancement Project". Transport for London. http://developments.dlr.co.uk/enhancements/capacity/index.asp. Retrieved 9 July 2008. 
  59. ^ "Longer trains for Docklands Line". BBC News. 31 July 2007. http://news.bbc.co.uk/1/hi/england/london/6924214.stm. Retrieved 24 June 2009. 
  60. ^ "Docklands Light Railway (DLR) 3 Car Enhancements Project". Arup. http://www.arup.com/rail/project.cfm?pageid=11148. Retrieved 24 June 2009. 
  61. ^ "Taylor Woodrow wins £200m Docklands Light Railway project". Contract Journal. 3 May 2007. http://www.contractjournal.com/Articles/2007/05/03/54774/taylor-woodrow-wins-200m-docklands-light-railway-project.html. Retrieved 24 June 2009. 
  62. ^ "Mudchute third platform". London Connections. 11 April 2008. http://londonconnections.blogspot.com/2008/04/mudchute-third-platform.html. Retrieved 29 June 2008. 
  63. ^ "Olympic rail gets a head start: ten lines will serve London's Olympic Park when it opens for the 2012 Games. But the network, which will allow a train to serve the main Olympic venue every 15 seconds, is expected be up and running long before the torch enters the stadium". accessmylibrary.com. 1 July 2006. http://www.accessmylibrary.com/coms2/summary_0286-32102864_ITM. Retrieved 24 June 2009. 
  64. ^ "Extra carriage on every DLR train" (Press release). Transport for London. 3 May 2007. http://developments.dlr.co.uk/NewsDetail.aspx?newsid=1138. Retrieved 10 June 2011. 
  65. ^ "Docklands Light Railway ready for 2012 Games with three-car upgrade completed" (Press release). Transport for London. 10 May 2011. http://www.tfl.gov.uk/corporate/media/newscentre/19961.aspx. 
  66. ^ "£20m bullet trains to serve Olympic Park". London2012.org. 28 September 2004. http://www.london2012.org/news/archive/bid-phase/20m-bullet-trains-to-serve-olympic-park.php. Retrieved 6 July 2005. 
  67. ^ "Major contract award signals start of work on DLR Stratford International Extension". Transport for London. 10 January 2007. http://developments.dlr.co.uk/ProjectUpdatesDetail.aspx?updateid=1053. Retrieved 8 August 2011. [dead link]
  68. ^ "Government gives green light to key 2012 rail link" (Press release). TfL. 25 October 2006. http://developments.dlr.co.uk/ProjectUpdatesDetail.aspx?updateid=1049. Retrieved 8 August 2011. 
  69. ^ BBC News 31 August 2011 [1]
  70. ^ "Pudding Mill Lane Station To Be Rebuilt". Londonist. 28 July 2011. http://londonist.com/2011/07/pudding-mill-lane-station-to-be-rebuilt.php. Retrieved 13 August 2011. 
  71. ^ a b Ian Allan Publishing. Modern Railways. March 2006.
  72. ^ Docklands Light Railway – Dagenham Dock: Key Project Milestones Transport for London
  73. ^ "DLR Barking Riverside consultation document". Transport for London. Archived from the original on 1 December 2007. http://web.archive.org/web/20071201220109/http://developments.dlr.co.uk/pdf/extensions/dagenham/dagenham_consultation_leaflet2.pdf. Retrieved 23 February 2008. 
  74. ^ Transport for London – DLR Dagenham Dock extension preferred alignment (February 2008)
  75. ^ "TfL Board meeting papers February 2008". http://www.tfl.gov.uk/assets/downloads/corporate/Agenda-08-02-06.pdf. Retrieved 13 February 2008. 
  76. ^ "'Threat to homes' as DLR on hold". BBC News Online. 24 October 2008. http://news.bbc.co.uk/1/hi/england/london/7688635.stm. Retrieved 24 June 2009. 
  77. ^ "TfL scraps projects and cuts jobs". BBC News Online. 6 November 2008. http://news.bbc.co.uk/1/hi/england/london/7712002.stm. Retrieved 24 June 2009. 
  78. ^ "Go-ahead for our new future". Barking and Dagenham Post. 22 June 2009. http://www.bdpost.co.uk/news/go_ahead_for_our_new_future_1_574583. 
  79. ^ "Dagenham prison plan under attack". London Evening Standard. http://www.thisislondon.co.uk/standard/article-23706295-details/Dagenham+prison+plan+under+attack/article.do. Retrieved 24 June 2009. 
  80. ^ "Doubts over future DLR extension". BBC News Online. http://www.bbc.co.uk/london/content/articles/2008/10/20/barking_dlr_feature.shtml. Retrieved 26 June 2009. 
  81. ^ Hetherington, Peter (22 March 2006). "Home truths". The Guardian (London). http://www.guardian.co.uk/society/2006/mar/22/communities.guardiansocietysupplement. Retrieved 28 June 2009. 
  82. ^ "Mayor's Transport Strategy, Chapter five—transport proposals". Transport for London. http://mts.tfl.gov.uk/documents/MTS09-Chapter-5-Proposals.aspx. Retrieved 21 October 2009. 
  83. ^ "London City Airport gets DLR extension". accessmylibrary.com. 19 March 2002. http://www.accessmylibrary.com/coms2/summary_0286-25164810_ITM. Retrieved 24 June 2009. 
  84. ^ "London City Airport Extension". Docklands Light Railway. 10 November 2006. http://developments.dlr.co.uk/pdf/factsheets/lcy_ext.pdf. Retrieved 24 June 2009. 
  85. ^ "Crossrail brings old tunnel back to life". BBC. 27 April 2011. http://www.bbc.co.uk/news/uk-england-london-13210232. Retrieved 27 April 2011. 
  86. ^ "DLR to City Airport". AlwaysTouchOut.com. http://www.alwaystouchout.com/project/9. Retrieved 9 July 2008. 
  87. ^ "DLR Victoria extension – official". District Dave's London Underground Site. 23 October 2008. http://districtdave.proboards39.com/index.cgi?board=dlr&action=display&thread=9383. Retrieved 10 January 2009. 
  88. ^ Clive Feather, Clive's UndergrounD Line Guides (CLUG), Jubilee Line, A Modern Tube. Retrieved 26 June 2008.
  89. ^ Chapter 5: Major Transport and Regeneration Projects, item 5.6.3[dead link]
  90. ^ Wilkes, Roger (19 June 2002). "One long picnic, it certainly ain't". The Daily Telegraph (London). http://www.telegraph.co.uk/property/propertyadvice/propertymarket/3303494/One-long-picnic-it-certainly-aint.html. Retrieved 24 June 2009. 
  91. ^ "DLR takes off". accessmylibrary.com. 6 May 2004. http://www.accessmylibrary.com/coms2/summary_0286-21244474_ITM. Retrieved 24 June 2009. 
  92. ^ "DLR to Catford". Always Touch Out. 27 October 2007. http://www.alwaystouchout.com/project/129. Retrieved 9 July 2008. 
  93. ^ London Docklands Light Railway; Northern Line's Dot-Matrix Indicators RISKS Digest Volume 5 Issue 29 Article 3, 13 August 1987
  94. ^ Report on the Docklands Light Railway Accident Which Occurred at Island Gardens Station on 10 March 1987, Modern Railways, May 1987
  95. ^ "'Unauthorised Tests' Caused DLR Crash", Modern Railways, June 1987
  96. ^ Another commuter train wreck in London, Jonathan I. Kamens, RISKS Digest Volume 11 Issue 52 Article 1, 23 April 1991
  97. ^ Computer-controlled commuter trains collide in east London, UPI report relayed by ClariNet news service, 22 April 1991
  98. ^ Re: Trains collide in east London, Ian G Batten, RISKS Digest Volume 11 Issue 54 Article 10, 25 April 1991
  99. ^ Tumposky, Ellen; Gentile, Don (10 February 1996). "Blast shatters London, Adams Presumes IRA's Responsible". New York Daily News. http://www.nydailynews.com/archives/news/1996/02/10/1996-02-10_blast_shatters_london__adams.html. Retrieved 12 November 2008. 
  100. ^ "ON THIS DAY: Docklands bomb ends IRA ceasefire". BBC News Online. 10 February 1996. http://news.bbc.co.uk/onthisday/hi/dates/stories/february/10/newsid_2539000/2539265.stm. Retrieved 2 January 2010. 
  101. ^ a b "DLR management". Transport for London. http://www.tfl.gov.uk/corporate/modesoftransport/dlr/1532.aspx. Retrieved 10 June 2011. 

Bibliography

  • Jolly, Stephen; Bayman, Bob (November 1986). Docklands Light Railway Official Handbook. Harrow Weald: Capital Transport Publishing. ISBN 0 904711 80 3. 
  • Gonsalves, B.F.; R.W. Deacon, D. Pilgrim, B.P. Pritchard (1991). Docklands Light Railway and Subsequent Upgrading. Proceedings of the Institution of Civil Engineers. 

External links


West: Crossings of the River Thames East:
Greenwich foot tunnel Lewisham branch,
between Island Gardens
and Cutty Sark
Jubilee line
between Canary Wharf
and North Greenwich
Woolwich foot tunnel Woolwich branch,
between King George V
and Woolwich Arsenal
(Thames Gateway Bridge – proposed)
380kV Thames Crossing

Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • Docklands Light Railway — Saltar a navegación, búsqueda Docklands Light Railway (DLR) Datos generales Tipo Tren ligero …   Wikipedia Español

  • Docklands Light Railway — Streckenlänge: 34 km Spurweite: 1435 mm (Normalspur) Systemtyp: fahrerlose Hochbahn …   Deutsch Wikipedia

  • Docklands Light Railway — Réseau ferré des TRANSPORT FOR LONDON Métro de Londres   Bake …   Wikipédia en Français

  • Docklands Light Railway rolling stock — B07 stock train in 2008 livery at Poplar DLR station The interior of the new B07 Ro …   Wikipedia

  • Docklands Light Railway extension to Dagenham Dock — Coordinates: 51°30′32″N 0°04′18″E / 51.50889°N 0.07167°E / 51.50889; 0.07167 The D …   Wikipedia

  • Docklands Light Railway — (abbr DLR) a system of light trains used for public transport in the London Docklands which started operating in 1987. The trains are controlled by computer and travel above ground, often high up on raised lines. Many of its stations are linked… …   Universalium

  • Liste des stations du Docklands Light Railway — Article principal : Docklands Light Railway. La liste des stations du Docklands Light Railway, est une liste alphabétique[1] des stations du Docklands Light Railway (métro léger de Londres) en Angleterre. Voir aussi la liste alphabétique… …   Wikipédia en Français

  • Liste der Stationen der Docklands Light Railway — Streckennetz der Docklands Light Railway Dies ist die Liste der Stationen der Docklands Light Railway. Die nachfolgenden, alphabetisch geordneten Tabellen enthalten folgende Informationen: Name der Station Übergang: Gibt die… …   Deutsch Wikipedia

  • (the) Docklands Light Railway — the Docklands Light Railway [the Docklands Light Railway] (abbr DLR) a system of light trains used for public transport in the London ↑Docklands which started operating in 1987. The trains are controlled by computer and travel above ground, often …   Useful english dictionary

  • List of Docklands Light Railway stations — This is a list of the stations located on the Docklands Light Railway. They are listed per branches on which they are found, showing the system layout.tations on west to east branchesBank branchOpened 1991 * Terminus: Bank for Central London… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”