- North London Line
-
North London Line
A Class 378 "Capitalstar" at Canonbury in June 2010Overview Type Commuter rail, Suburban rail, Freight rail, Heavy rail, Rapid transit System National Rail
London UndergroundStatus Operational Locale Greater London Termini Richmond
StratfordStations 23 Services 1 Operation Opened 1869 (fully) Closed 2006 (Stratford - North Woolwich) Owner Network Rail Operator(s) London Overground
London Underground (District line)Depot(s) Willesden TMD Rolling stock Class 378 Capitalstar
London Underground D78 StockTechnical No. of tracks 2-4 Track gauge Standard gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 25kV AC OHLE
750 V DC third railThe North London Line is a railway line which passes through the inner suburbs of north London, England. Its route is a rough semicircle from the south west to the north east, avoiding central London. The line is owned and maintained by Network Rail. Although much of it originated as part of the North London Railway, the current route is the result of a series of amalgamations, closures and re-openings; and has a mixed third-rail and overhead electrical power supply. It is an important freight route and is used by the Richmond to Stratford service of the London Overground, as part of the National Rail network.[1] Also between Richmond and Gunnersbury, London Underground's District line shares tracks with London Overground services, although this part is also owned and maintained by Network Rail.
The line closed in February 2010 between Gospel Oak and Stratford for installing a new signalling system and for extending 30 platforms, ultimately to allow four-car trains to run on the London Overground network. The line reopened on 1 June 2010 with a reduced service and none on Sundays,[2] and with the upgrade work completed the full seven-day service resumed with effect from 22 May 2011.
Contents
History
Formation
North London Line LegendIf display breaks up, try Hide/Show. Aligned dotted routes connect off this map Waterloo to Reading Line (▲ Reading ) Richmond District line Single track link from platform 3 Link lifted. LO and LU share tracks Richmond to G'bury Waterloo to Reading Line (◄ Waterloo ) Kew Gardens Kew Railway Bridge across River Thames (Chiswick - Kew Bridge) Hounslow Loop Link lifted Kew (L&SWJR) 1853-1866 Gunnersbury District (◄ Turnham Green) Freight/SOC link lifted District and Piccadilly lines (◄ Up - Down ►) Bollo Lane S. Acton Jn District and freight link lifted South Acton (LU service to Acton Town 1905-1959) Freight link lifted Hammersmith & Chiswick branch (1857 - 1965) Acton Central Churchfield Road Great Western Main Line (Paddington - Bristol) HUB = Acton Wells Junction Central line New North Main Line To WCML and Dudding Hill Line ◄ West London Line to Clapham Junction Old Oak (or South West/ern) sidings WCML (◄ Up - Down ►) The junction is Willesden Junction Watford DC Line (LO) and Bakerloo (LU) share tracks. (Down ►) Willesden Junction HL/LL (◄ Up) Watford DC Line to Euston, B'loo to El. & Castle From West Coast Main Line Kensal Green Turnback Siding Kensal Green & Harlesden (1861-1873) Kensal Rise Brondesbury Park Brondesbury Chiltern Main Line (Marylebone - Birmingham)
Metropolitan tracks wrap Jubilee tracksJubilee line West Hampstead LU West Hampstead NLL MML 3rd crossing (◄ St Pancras - The North ►) Thameslink West Hampstead TLK Finchley Road & Frognal Hampstead Heath Tunnel above Northern line to Edgware Hampstead Heath Freight link Gospel Oak Gospel Oak to Barking Line ► Lifted link to Gospel Oak to Barking Line MML 2nd crossing (▲ The North - St Pancras ▼) ▲ Down Watford DC Line ▲ Down West Coast Main Line Kentish Town West (1867-1971, re-opened 1981) Up West Coast Main Line to Euston ▼ Up Watford DC Line to Euston, Primrose Hill (1855-1992) Northern line to High Barnet Camden Road 4-track after here to §§ except 2/3 at ## ◄ St Pancras MML 1st crossing (◄ St Pancras - The North ▲) High Speed 1 (◄ St Pancras - Channel Tunnel ▼) Maiden Lane (NLR) (1887-1917) East Coast Main Line (King's Cross - Edinburgh) Noise abating covered bridge leads into tunnel Piccadilly line From here to near Homerton HS1 tunnel runs beneath NLL Caledonian Road & Barnsbury first site (1852-1870) Caledonian Road & Barnsbury Dual voltage transfer link. ## = 2/3 track. LH track is ELL Highbury & Islington Victoria line to Walthamstow Central Northern City Line (Moorgate - Finsbury Park) NLL-ECML chord Canonbury Canonbury first site (1858-1870) Mildmay Park (1880-1934) To ELL from 2010. §§ End of 4-track Dalston Kingsland (1850-1865, re-opened 1983) Dalston Jn (1865-1986) on NLR City Extn to Broad Street re-opened 2010 on LO ELL Link lifted Graham Road curve ◄ Liverpool Street WAML and Lea Valley Lines Hackney Central (1850-1944, re-opened 1980) Homerton (1868-1944, re-opened 1985) HS1 (▲ St Pancras International - Channel Tunnel ►) Victoria Park (1856-1943). Track rebuilt in 1960s Lifted link to Old Ford on former L&BR Hackney Wick River Lea (or Lee) Link to Lea Valley Lines DLR to Stratford International HUB = Stratford also suffixed "Regional" or "(London)" (HL) LO from Richmond (HL) Great Eastern Main Line (HL) Central line (HL) DLR from Poplar (LL) DLR to Canning Town and beyond (NLL service 1855-2008) (LL) Jubilee Line Links to GEML lifted Former route to Woolwich, taken over by DLR & Crossrail Stratford High Street (Stratford Market (1847-1957)) Abbey Road District and H&C lines, shared tracks London, Tilbury and Southend Line West Ham, (NLL service 1979-2006) Link lifted Star Lane DLR from East India Canning Town (NLL service 1855- 2006) Jubilee line towards North Greenwich From Tidal Basin to past Pontoon Dock DLR route to WA is elevated on line of Silvertown Tramway Tidal Basin (1858-1943). Line at left was Silvertown Tramway Royal Victoria Crossrail to Canary Wharf under construction Custom House (NLL service 1855-2006, CR service from 2018) DLR to Beckton West Silvertown To Gallions ► Pontoon Dock Connaught Tunnel (549 m / 27 ch) DLR to Woolwich Arsenal Line at left (Silvertown Tramway) was first EC&TJR route Silvertown & London City Airport (1863-2006) North Woolwich (1847-2006) for Woolwich Free Ferry Crossrail to Abbey Wood under construction The North London Line between Richmond and North Woolwich derives from five connecting sections which were opened over 25 years from 1846:
- The easternmost section opened as the Eastern Counties and Thames Junction Railway in 1846/7 between Stratford and North Woolwich. The later construction of the Royal Victoria Dock necessitated a swing-bridge on the original route south of Canning Town which was rerouted in 1850 via Custom House and the Connaught Tunnel. The original route was retained as the Silvertown Tramway, a local freight line connected at both ends to the new main line.
- The main central section opened from 1850 to 1852 as the East & West India Docks & Birmingham Junction Railway (renamed the North London Railway (NLR) in 1853). This gave a link from the Euston main line near Primrose Hill to the docks at Poplar via Bow.
- In the west, the North & South Western Junction Railway was opened in 1853 from Willesden Junction station to a junction with the Hounslow Loop Line near Kew Bridge.
- The last link in the east was opened between the NLR near Victoria Park and Stratford in 1854.
- To obviate NLR trains running on the busy Euston main line, the Hampstead Junction Railway was opened from the NLR at Camden Road to Willesden via Hampstead Heath in 1860.
- To give the NLR direct access to the City of London the City Extension to Broad Street was opened from Dalston Junction in 1865.
- The final part of the route was the opening of a link from South Acton to Richmond by the London & South Western Railway (LSWR) in 1869.
Developments
The line between Broad Street and both Kew Bridge and Richmond was electrified by the LNWR in 1916 on the 4th rail DC system.
In 1944 passenger service on the NLR Poplar branch ceased. Freight traffic probably continued on the branch until the docks on the Isle of Dogs closed during the 1960s and 1980s. The trackbed of the southern part of the branch, from Poplar to Bow, was used for the Docklands Light Railway (DLR) branch to Stratford.
In 1979 the North Woolwich to Stratford service was extended to Camden Road as the CrossTown LinkLine service using the same Cravens-built diesel multiple unit trains. There were no intermediate stations until in 1980 Hackney Wick, near the site of the former Victoria Park station, opened and Hackney Central re-opened, Homerton re-opened in 1985 (both those stations had closed in 1944). New platforms were built at West Ham for interchange with the adjacent Underground station.
Closures
In the 1980s Broad Street station closed and the Tottenham Hale–Stratford link and the station at Lea Bridge ceased to be used by regular passenger trains. The line between Dalston and North Woolwich was electrified on the third-rail system and Broad Street services were diverted to North Woolwich using former Southern Region 2-EPB types built in the 1950s. The two-car trains soon proved too small and were replaced by three-car Class 313 electric multiple units. The new service was branded by British Rail as the North London Link, and some signs using this name still exist.
In December 2006, as with the Poplar branch (see above), the line between Stratford and North Woolwich was permanently closed to make a way for a future DLR extension from Canning Town to Stratford International (opening February 2011). The section south of Canning Town was not used by the DLR as it is largely duplicated by the DLR King George V branch. Instead, the section will become part of Crossrail's branch to Abbey Wood (opening 2018). The section south of Stratford had always been the Cinderella end of the line, when there were operating problems it was common for trains to be turned short at Stratford.
Poor performance before the TFL take over
Despite published performance figures[3] the North London Line used to be regarded by frequent travellers as offering a poor service,[4] with extremely congested trains and an unreliable service[5] with trains often cancelled shortly before they are due to arrive. A 2006 London Assembly report described the current service as "shabby, unreliable, unsafe and overcrowded", proposing the transfer of the service to Transport for London (TfL) as a solution to improve the quality of the service[6] due to upgrade plans[7] which coincide with the extension of the East London line. A report on the line can be found on the London Assembly website.[8]
TfL
The North London Line, as part of Silverlink Metro, along with the West London Line, Gospel Oak to Barking Line and the Watford DC Line, was transferred to Transport for London (TfL) in 2007 to form its new London Overground service. TfL began to remodel stations, integrate lines and following the transfer and extension of the East London Line, aims to create an orbital rail service. TfL also brought in new trains and the line, which previously appeared on tube maps following a public campaign, gained its own colour. TfL extensively refurbished and upgraded the line.
Former services
In addition to the primary Broad Street - Richmond service there were services that linked Broad Street with Harrow & Wealdstone and Watford Junction on the West Coast Main Line. Most of these were routed via the line between South Hampstead and Camden Road, calling at Primrose Hill, although some travelled via Hampstead Heath and switched to the Watford line at Willesden Junction. By the time that Broad Street closed in 1986 the Watford services operated only in the rush hours, and they were diverted to Liverpool Street by way of a new link in Hackney, known as the Graham Road Curve. However, with trains frequently cancelled, and some timed to arrive at Liverpool Street station after the start of the working day (plus the evening workings also being timed to not be suitable for office workers), patronage was very low and after a few years they were withdrawn.
In 2000, Anglia Railways started a service between Basingstoke and Ipswich, utilising parts of the North London Line. The service was called London Crosslink and ran up to five times a day at roughly two-hourly intervals. The service called only at principal stations such as Staines, Feltham and Brentford. On the North London Line, the trains called only at Stratford, Highbury & Islington, Camden Road (some services), West Hampstead and Willesden Junction. The service was withdrawn in 2002.
The AC electrification of the eastern part of the North London Line uses the previously unelectrified northern pair of tracks, which were also partially singled at the same time. Between Canonbury and Highbury & Islington there is a line which links to the East Coast Main Line at Finsbury Park station. This used to carry passenger trains to / from various North London stations (such as Edgware, Alexandra Palace, High Barnet, Welwyn Garden City and others) over part of the North London Line to Broad Street Station; however, since the opening of the Great Northern Electrics suburban electrification which in the 1970s saw trains being diverted into Moorgate and London King's Cross stations, this link has only been used for freight trains. It too was singled concurrent with the AC electrification of the eastern part of the North London Line.
Route
Track
Most of the line runs in a curve across north London. Only Richmond and Kew Gardens stations at the western end are south of the River Thames. The river crossing is made by Kew Railway Bridge on tracks which are shared with the London Underground District Line. The location of the eastern extremity has varied over the years. Between 1944 and 1986 it was at Broad Street station, then it switched to North Woolwich. It was cut back to Stratford. A tunnel, the Hampstead Heath tunnel, runs under Hampstead between Finchley Road & Frognal and Hampstead Heath. The line is double track throughout with a mix of triple and quadruple track between Camden Road and Dalston Kingsland. The former North Woolwich branch included a section of single track between Custom House and North Woolwich stations, and the Broad Street branch was at one time formed of quadruple track.
During the February–May 2010 closure, stations at Caledonian Road & Barnsbury, Highbury & Islington and Canonbury were extensively rebuilt. The through route was moved to the north side of the cutting, to allow the extended East London Line to serve Highbury & Islington and Canonbury on a pair of completely segregated tracks occupying the former route on the south side of the cutting. West of Highbury and Islington, the passenger line switches to the inner pair of tracks, while the outer pair are for freight train use, all tracks under overhead wires. Once the extension is complete, there will therefore be four tracks between Dalston (Western) Junction and shortly east of Camden Road.
Electric supply
The line is electrified using the third rail system from Richmond to Acton Central. Overhead lines are used from Acton Central to Stratford. The line to Broad Street used third rail supply and when the through service to North Woolwich started in 1985 trains used the third rail throughout. When the trains were replaced a few years later by dual-system Class 313 trains it became possible to use the overhead electrification system which had been added to parts of the line for the benefit of freight trains. There had been some unexpected difficulties with earth currents from the third rail system which this overcame. This usage was steadily extended and trains had to make a number of changes between electrification systems during their short journey. These were at Dalston Kingsland, Camden Road and Acton Central. With the final upgrade of the line between Camden Road and Stratford, the need to change electification systems on this stretch was eliminated, and now the only changeover takes place at Acton Central.
Connections
The line crosses or comes into contact with a very large number of railway lines, especially lines radiating from central London. This does provide opportunities to move between separate sectors of suburban London without having to enter the central zone.
Interchanges shown on the tube map
- at Richmond, to and from South West Trains services including the Kingston loop line.
- at Gunnersbury, connecting NLL services north of the station to District Line services east of the station.
- at Willesden Junction, with the Bakerloo Line, Watford DC Line and West London Line.
- at West Hampstead, with the Jubilee Line and First Capital Connect (Thameslink) stations, each situated a short walk either side of the NLL station.
- at Gospel Oak, to and from the Gospel Oak to Barking Line of London Overground.
- at Highbury & Islington, to and from the Victoria Line and the East London Line. On weekdays, there are also trains operated by First Capital Connect to Moorgate, Finsbury Park and connecting to the Great Northern Line.
- at Canonbury, with the East London Line.
- at Stratford, to and from the Central Line, Great Eastern Main line National Express East Anglia services between East Anglia and Liverpool Street, the Jubilee line, and Docklands Light Railway.
Other interchanges
- at Brondesbury, to and from Kilburn station on the Jubilee Line.
- at Finchley Road & Frognal, to and from Finchley Road station on the Metropolitan Line and Jubilee Line, a walk of about 400m.
- at Camden Road, which is about 400m from Camden Town on the Northern Line.
- at Caledonian Road & Barnsbury, which is about 1/2 km from Caledonian Road on the Piccadilly Line.
- at Hackney Central which is about 500m from Hackney Downs station for National Express East Anglia services.
- at South Acton, to and from Acton Town station on the Piccadilly Line and District Line. This is a walk of a little over 1 km.
- at Dalston Kingsland, where interchanges can be made 200m away with the East London Line at Dalston Junction from May 2010
Former interchanges
- at North Woolwich passengers could cross the Thames via the Woolwich foot tunnel or the free ferry to Woolwich Arsenal station for connections on the North Kent line to Medway Towns, Gravesend, Dartford, Sidcup, Abbey Wood, Blackheath, Lewisham, Greenwich and Central London
Current operations
Rolling stock
London Overground uses Class 378 Capitalstar four-car dual-voltage electric trains, compatible with both 750V DC third-rail and 25kV AC overhead power sources,[9] The Class 378 Capitalstars replaced the Class 313 trains, which were withdrawn from the route by February 2010.
Service levels
Trains run seven days a week day from approximately 6am (9am Sundays) until 11.30pm. During peak times, there are 4 trains per hour between Richmond and Stratford; and 4 trains per hour operate between Clapham Junction and Stratford on the West London Line service, making up a total of 8 trains per hour between Willesden Junction and Stratford. During off-peak times, there are 4 trains per hour between Richmond and Stratford, and 4 trains per hour on the West London line between Clapham Junction and Willesden Junction, with two of these per hour continuing to Stratford, making up a total of 6 trains per hour between Willesden Junction and Stratford. The introduction of the new four-car, air-conditioned trains, combined with improved signalling and passenger information has dramatically overhauled the service, making it a very effective alternative to travelling through central London for many orbital journeys.
East London Line extension
From March 2011, the extended East London Line connects to the NLL with ELL services joining the line west of Dalston Kingsland, running to Highbury & Islington.,[10][11]
Proposed developments
Maiden Lane
Maiden Lane station may be reopened by Camden Council[12] however the Office of Rail Regulation has not included this in the current plans.[13]
Crossrail to Hounslow
Hounslow council proposed that part of the North London Line be used as a branch of Crossrail to Hounslow.[14] This would see Crossrail services stopping at Acton Central and South Acton. However it was not included in the initial Crossrail bill, but could potentially form part of a later extension.
Old Oak Common
Under the former government's plans for High Speed 2 line from London Euston to Birmingham; a new station called Old Oak Common would be built by 2025 serving the North London Line, West London Line, High Speed 2 and Crossrail. The new government does support this after opposing it at first.[15]
North Acton
Another new station at North Acton is proposed for interchange with the Central Line. As this may require the central line station being moved to the east, it is merely an aspiration.
High Speed 2
The planned link between the proposed High Speed 2 line and the existing High Speed 1 line would use the North London Line alignment around Camden Road station which may reduce the existing or future capacity of the line. Due to its heavy investment in the line and the passenger growth on it, Transport for London is against the alignment's use as a link between the two High Speed lines.[16]
Closed stations
Closed stations apart from those on the closed sections of the line are:
City Extension
On 1 November 1865 the NLR opened its City Extension mostly on a viaduct from a triangular junction at Dalston to Broad Street in the City with these stations:
The extension closed on 30 June 1986, but although the track was lifted the viaduct remained in place. In 2010, the route was re-opened as part of the extended East London Line, which, like the North London Line, is operated by London Overground.
North Woolwich section
On 10 December 2006, the former Eastern Counties and Thames Junction Railway line between Stratford and North Woolwich was closed to allow building between Stratford and Canning Town of a Docklands Light Railway line to Stratford International. Part of the south end of closed section is to be used for Crossrail.[17]
NLL stations closed were:
- Stratford low level
- West Ham
- Canning Town
- Custom House
- Silvertown
- North Woolwich
DLR and Jubilee Line services are not affected at the first three of those stations.
The DLR line to Stratford International will use the former NLL low level platforms at Stratford. NLL trains now terminate at new platforms on the north side of the high level station.
References
- ^ "Route 6 - North London Line and Thameside : 2009 Route Plan". Network Rail. 2009. http://www.networkrail.co.uk/browse%20documents/StrategicBusinessPlan/RoutePlans/2009/Route%206%20-%20North%20London%20Line%20and%20Thameside.pdf. Retrieved 2009-05-28.
- ^ "London Overground to close from Gospel Oak to Stratford as part of £326m upgrade to deliver longer, more frequent trains". TfL. 18 December 2009. http://www.tfl.gov.uk/corporate/media/newscentre/archive/13867.aspx. Retrieved 6 February 2010.[dead link]
- ^ "Silverlink rises to second position in the national performance league". 2006-09-18. http://www.atoc-comms.org/dynamic/toc-press-story/999831/Silverlink-rises-to-second-position-in-the-national-performance-league. Retrieved 2007-10-26. Association of Train Operating Companies [1] Press Releases
- ^ Sharp, Rachel (2007-10-24). " TfL to take on rail network". Ealing Times. http://www.ealingtimes.co.uk/news/localnews/display.var.1782035.0.tfl_to_take_on_rail_network.php. Retrieved 2007-10-26.
- ^ " Braced for rail strikes". Hackney Gazette. 2007-10-26. http://www.hackneygazette.co.uk/content/hackney/gazette/news/story.aspx?brand=HKYGOnline&category=news&tBrand=northlondon24&tCategory=newshkyg&itemid=WeED25%20Oct%202007%2011%3A49%3A35%3A157. Retrieved 2007-10-26.
- ^ London Assembly - Light at end of the tunnel for London's forgotten railway
- ^ Always Touch Out - London Overground & Orbirail
- ^ London's forgotten railway (PDF)
- ^ Transport for London - £36m contract to bring extra rail carriages for London Overground
- ^ Transport for London - East London Railway project
- ^ Dalston Junction to Highbury & Islington now Connected
- ^ King's Cross Development plan (PDF)
- ^ "Sections 17/18 - Section 17 and 18 - new track access contracts : Office of Rail Regulation". Rail-reg.gov.uk. http://www.rail-reg.gov.uk/server/show/nav.1257. Retrieved 2010-06-22.
- ^ "A4" (PDF). http://www.hounslow.gov.uk/crossrail.pdf. Retrieved 2010-06-22.
- ^ No business case' to divert HS2 via Heathrow, say Mawhinney Page 6-7, Rail Magazine, Issue 649, 28 July to 10 August 2010
- ^ Transport Select Committee, 28 June 2011, House of Commons
- ^ Transport for London - Stratford International Extension
Bibliography
- HP White. 1971. A Regional History of the Railways of Great Britain, Volume 3 - Greater London. ISBN 0-7153-5337-3
Railway lines in London Primary Secondary Bexleyheath Line · Brighton Main Line · Caterham Line · Chatham Main Line · Chiltern Main Line · Crossrail (under construction) · Dartford Loop Line · Hertford Loop Line · Lea Valley Lines · London to Aylesbury Line · London, Tilbury and Southend Line · North Kent Line · Oxted Line · Shepperton Branch Line · South Eastern Main Line · South Western Main Line · Sutton & Mole Valley Lines · Tattenham Corner Line · Thameslink · Watford DC Line · Waterloo to Reading Line · West Anglia Main LineLocal Bromley North Line · Catford Loop Line · Chessington Branch Line · Chingford Branch Line · Dudding Hill Line · East London Line · Epsom Downs Branch · Gospel Oak to Barking Line · Greenford Branch Line · Greenwich Line · Nunhead to Lewisham Link · Hayes Line · Hounslow Loop Line · Kingston Loop Line · Mid-Kent Line · New North Main Line · North London Line · Northern City Line · Romford to Upminster Line · South London Line · West London LineDisused Addiscombe Line · City Widened Lines · North London Line (City Branch) · Crystal Palace High Level Branch Line · Palace Gates Line · Staines & West Drayton Line · Uxbridge (Vine Street) Branch Line · West Croydon to Wimbledon Line · Woodside & Sanderstead LineCategories:- London Overground
- Transport in Richmond upon Thames
- Transport in Hounslow
- Transport in Ealing
- Transport in Brent
- Transport in Camden
- Transport in Islington
- Transport in Hackney
- Transport in Newham
- Railway lines in London
- Railway lines opened in 1869
- Standard gauge railways in England
Wikimedia Foundation. 2010.