- Jubilee line
Infobox TfL line
Line=Jubilee
ColourName=Grey
TextColour=White
YearOpened=1979
DeepOrSurface=Deep Level
RollingStock=1996 Tube Stock
StationsServed=27
LengthKm=36.2
LengthMiles=22.5
AnnualPassengers=127,584,000
Depots=Neasden, Stratford Marketcite web |url=http://www.tfl.gov.uk/corporate/modesoftransport/londonunderground/1608.aspx|title=London Underground Key Facts |publisher=Transport for London|accessdate=2008-05-21 ]The Jubilee line is a line on the
London Underground ("the Tube"), in theUnited Kingdom . It was built in two major sections - initially to Charing Cross inCentral London , and later extended in 1999 to Stratford in East London. The later stations are notable for their larger size and safety features (both being attempts tofuture-proof the line). Out of 27 stations served, 13 are below ground. It is the sixth busiest line on the network.Fact|date=February 2008The Jubilee line is coloured silver/grey on the
Tube map .Up to 1939
The Metropolitan main line had been extended from Wembley Park to Stanmore, opening in 1932. The line, as with many others in the north-west London area, was designed to absorb commuter traffic from the new and rapidly expanding suburbs. The line presented the Metropolitan with a problem — so successful was the suburban traffic that by the early 1930s, the lines into Baker Street were becoming overloaded, a problem which was exacerbated by the post-
war flight from the City to the West End.At first the Metropolitan had advocated a new underground line roughly following the line of the Edgware Road between its Edgware Road station and a point near Willesden Green. Indeed, construction advanced as far as the rebuilding of Edgware Road station to accommodate 4 platforms of 8 car length. Things changed though with the formation of the LPTB and the subsequent absorption of the Metropolitan. The solution now presented was an extension of the
Bakerloo line , north from Baker Street to serve St. John's Wood and Swiss Cottage, thereby rendering the existing stations (Lord's, Marlborough Road and Swiss Cottage) on the parallel route redundant, and negating the need for the Mets' extension from Edgware Road station (it should be noted, however, that Swiss Cottage Met was proposed to remain open during peak hours for interchange with the Bakerloo, and that Lord's station would further open for special Cricketing events. In the event, both closed permanently as war time economies). The line would rise between the Metropolitan tracks at Finchley Road, providingcross-platform interchange with the Metropolitan line. Continuing north to Wembley Park, the Bakerloo was to provide intermediate service on the Metropolitan line, allowing Metropolian Line trains to run Wembley Park to Finchley Road non-stop, cutting seven minutes from journey times. At Wembley Park, the Bakerloo would run on to serve Kingsbury, Queensbury, Canons Park and Stanmore. The Bakerloo extension, built as above, opened in 1939.1939 to 1979
The immediately pre- and post-war planning for the Tube network considered a series of new routes. The main results of this study concerned two major routes: the south to north-east "line C" (later constructed as the
Victoria line ) and lines 3 and 4, new cross-town routes, linking the north-east suburbs to Fenchurch Street, Wapping and variously Lewisham and Hayes.The Fleet Line was mentioned in a 1965 "Times" article, discussing options after the
Victoria line had been completed — suggesting that the Fleet Line could take a Baker Street-Bond Street-Trafalgar Square-Strand-Fleet Street-Ludgate Circus-Cannon Street route, then proceeding into south-east London [cite news|title=More Tube Lines Discussed|date=27 April 1965|publisher=The Times|accessdate=2008-07-11] .Line C opened as the Victoria line, in stages, between 1968 and 1972. Work on the north-east - south-west route continued.
In 1971 construction began on the new 'Fleet line'. Economic pressures, and doubt over the final destination of the line, had led to a staged approach. Under the first stage, the Baker Street to Stanmore branch of the Bakerloo Line was joined at Baker Street to a new convert|2.5|mi|0|adj=on segment into central London, with intermediate stops at Bond Street and Green Park and terminating at a new station at Charing Cross, thereby relieving pressure on the West End section of the Bakerloo Line between Baker Street and Charing Cross and also allowing increased frequencies on the section north of Baker Street.
The new tube was to offer cross-platform interchange between the Bakerloo and Fleet at Baker Street, as pioneered on the Victoria line. The work was completed in 1979. As part of the works, Trafalgar Square (Bakerloo) and Strand (Northern) stations were combined into a single station complex, Charing Cross. The existing Charing Cross station on the sub-surface District and Circle lines was renamed Embankment.
The new line was to have been called the Fleet line [cite book|last=Willis|first=Jon |title=Extending the Jubilee Line: The Planning Story|publisher=London Transport|date=1994|accessdate=2008-07-11] after the
River Fleet (although it would have only crossed under the Fleet at Ludgate Circus; the Central London section mostly follows the Tyburn). The project was renamed the Jubilee Line for Queen Elizabeth II's 1977Silver Jubilee following a pledge made by the Conservatives in theGreater London Council election of 1977. The original choice of battleship grey for the line's colour was based on the naval meaning of the word "fleet"; this became a lighter grey, representing the silver colour of the Jubilee itself.The line was officially opened by the Prince of Wales on
30 April 1979 , with passenger services operating from1 May 1979 ,cite web |url=http://www.davros.org/rail/culg/jubilee.html#dates |title=Jubilee Line, Dates |publisher=Clive's Underground Line Guides |accessdate=2008-02-12 ] cite book |last=Rose |first=Douglas |title=The London Underground, A Diagrammatic History |year=1999 |publisher=Douglas Rose/Capital Transport |isbn=1-85414-219-4 ]1979 to 1999
The Jubilee line of 1979 was to be the first of four phases of the project, but lack of funds meant that no further progress was made until the late 1990s.
* Phase 2 would have extended the line along
Fleet Street to stations at Aldwych,Ludgate Circus , Cannon Street and Fenchurch Street.* Phase 3 would have seen the line continue under the river to Surrey Docks tube station with a branch to both Lewisham via New Cross, and to New Cross Gate Station.
* Phase 4 was the possible continuation of the Lewisham branch to take over suburban services on the Addiscombe and Hayes (Kent) Branch.
An alternative plan was devised in the 1970s to extend the Jubilee line parallel to the River Thames: this would have taken the line from Fenchurch Street to Thamesmead via
St Katharine Docks , Wapping, Surrey Docks North, Canary Wharf, North Greenwich, Custom House,Silvertown ,Woolwich Arsenal , thence toThamesmead . However the 'River Line', as this extension was called, was deemed too expensive and construction of the extension never proceeded.Changes in land use, particularly the
urban renewal of the Docklands area, caused the project to extend the line beyond Charing Cross to change considerably in the 1970s, 1980s and 1990s. TheJubilee Line Extension , as the eventual project became known, opened in three stages in 1999. It split from the existing line at Green Park creating a one-station branch to Charing Cross, which is now closed (although it is still maintained for reversing trains at times of disruption, and for occasional use as a film set). The line extends as far asStratford , with ten intermediate stations. With the extension in place, the Jubilee line became the only line on the London Underground network that has interchanges with all other lines; it was joined in this distinction by theCentral line when theEast London line closed for transfer toLondon Overground .Various maps of the proposed extensions to serve the Docklands area and beyond can be seen on the LDDC website at http://www.lddc-history.org.uk/transport/tranmon3.html#6.
The 2005 upgrade
The Jubilee line closed for a scheduled five-day period starting on 26 December 2005 in order to add an extra carriage to each of the six-car trains. The line had to be closed while this work was done as six and seven car trains could not run in service at the same time because the platform edge doors at Jubilee Line Extension stations could not cater for both train lengths simultaneously. Additionally, an extra four complete trains were added to the fleet, bringing the total to 63. The result is a 17% increase in capacity at peak times, allowing 6,000 more passengers per day to use Jubilee Line services. The signalling system was also upgraded. Work was completed and the line reopened two days ahead of schedule, on 29 December 2005.
Rolling stock
When the Jubilee line was opened, it was operated by 1972 stock. In 1984 this was partially replaced by the new 1983 Stock, the displaced 1972 Stock being transferred to the
Bakerloo line . The 1983 Stock proved to be unreliable and troublesome in service,Fact|date=May 2007 with single-leaf doors making passenger loading and unloading a slower process than on other stock with wider door openings. With the construction of the Jubilee line Extension, the opportunity was taken to introduce new trains, and today the line is worked by 1996 stock, which is similar to the 1995 Stock in use on the Northern line. The new stock has internal displays and automated announcements to provide passengers with information on the train's route - at first they simply listed the destination of the train, and subsequently also listing the name of the next station and interchanges there. Subsequent modifications also made the text scroll across the internal display instead of just appear in it.Future
The line is scheduled to switch to
automatic train operation in 2009, using theSelTrac system currently in use on theDocklands Light Railway . [cite news|title=Network tests for new signalling systems|url=http://www.tubelines.com/news/releases/200602/20050824.aspx|publisher=Tube Lines|date=2005-08-24|accessdate=2008-07-11] Equipment installation and testing for this began in late 2006.The line was constructed to enable a branch extension to be built eastwards from
North Greenwich toThamesmead . At present there are no plans to construct this branch route.Plans were put forward in 2004 for a West Hampstead Interchange, to connect the three
West Hampstead stations in one complex, but this proposal has not been approved.Map
The [http://www.tfl.gov.uk/assets/downloads/jubilee.pdf TfL line diagram] is available online.Stations
"Surface section"
* "Terminus:" Stanmore Access icon openedDecember 10 ,1932 .
* Canons Park, openedDecember 10 ,1932 (as Canons Park (Edgware)); renamed 1933.
* Queensbury, openedDecember 16 ,1934 .
* Kingsbury, openedDecember 10 ,1932 .
* Wembley Park access icon, openedOctober 14 ,1893 .
* Neasden, openedAugust 2 ,1880 .
* Dollis Hill, openedOctober 1 ,1909 .
* Willesden Green, openedNovember 24 ,1879 .
* Kilburn Access icon openedNovember 24 ,1879 (as Kilburn & Brondesbury); renamedSeptember 25 ,1950 .
* West Hampstead rail-interchange|london|overground rail-interchange|gb|rail, openedJune 30 ,1879 .
* Finchley Road, openedJune 30 ,1879 ."Tunnel section"
* Swiss Cottage, openedNovember 20 ,1939 .
* St. John's Wood, openedNovember 20 ,1939 .
* Baker Street, openedMay 1 ,1979 .
* Bond Street, openedMay 1 ,1979 .
* Green Park, openedMay 1 ,1979 .
* "Charing Cross" (former terminus), openedMay 1 ,1979 ; closedNovember 19 ,1999
* Westminster Access icon openedDecember 22 ,1999 .
* Waterloo rail-interchange|gb|rail Access icon openedSeptember 24 ,1999 .
* Southwark (rail-interchange|gb|rail Waterloo East) Access icon openedNovember 20 ,1999 .
* London Bridge rail-interchange|gb|rail (rail-interchange|air Trains to Gatwick) Access icon openedOctober 7 ,1999 .
* Bermondsey Access icon openedSeptember 17 ,1999 .
* Canada Water Access icon openedSeptember 17 ,1999 .
* Canary Wharf Access icon openedSeptember 17 ,1999 .
* North Greenwich Access icon openedMay 14 ,1999 ."Surface section"
* Canning Town Access icon openedMay 14 ,1999 .
* West Ham rail-interchange|gb|rail Access icon openedMay 14 ,1999 .
* "Terminus:" Stratford rail-interchange|london|overground rail-interchange|gb|rail Access icon openedMay 14 ,1999 .Gallery
Additional images are available from the Commission for Architecture and the Built Environment (CABE) case studies for the stations at Canary Wharf [cite web |url= http://www.cabe.org.uk/default.aspx?contentitemid=1096&field=btstr&term=Transport&type=1 |title= Canary Wharf Underground Station |publisher= Commission for Architecture and the Built Environment (CABE) |accessdate=2008-03-01] , North Greenwich [cite web |url= http://www.cabe.org.uk/default.aspx?contentitemid=1094&field=btstr&term=Transport&type=1 |title= North Greenwich Underground Station |publisher= Commission for Architecture and the Built Environment (CABE) |accessdate=2008-03-01] , Southwark [cite web |url= http://www.cabe.org.uk/default.aspx?contentitemid=316&field=btstr&term=Transport&type=1 |title= Southwark Underground Station |publisher= Commission for Architecture and the Built Environment (CABE) |accessdate=2008-03-01] , and Stratford [cite web |url= http://www.cabe.org.uk/default.aspx?contentitemid=288&field=btstr&term=Transport&type=1 |title= Stratford Station |publisher= Commission for Architecture and the Built Environment (CABE) |accessdate=2008-03-01] .
References
External links
*
**ltmcollection|ls/i00004ls.jpg|Official opening of Jubilee Line
*
*
*
* (photo gallery)
Wikimedia Foundation. 2010.