- Romford to Upminster Line
The Upminster Branch Line is a 3.4 mile (5.5 km)
branch line between Romford and Upminster in theLondon Borough of Havering . It formsNetwork Rail route EA 1040. [Network Rail, " [http://www.networkrail.co.uk/browse%20documents/Rules%20Of%20The%20Route/Outrotp7/Ea07p.pdf Rules of the Plan 2007] - South (East Anglia)", (2006). ]History and specification
The line was originally built as a branch of the
London, Tilbury and Southend Railway and opened on7 June 1893 providing the LT&S with an inroad intoGreat Eastern Railway territory at Romford and a small goods yard where the branch joins theGreat Eastern Main Line . At Romford the branch had a separate station to the Great Eastern meaning that passengers would have to exit from either company's station and cross South Street to continue their journey. This was eliminated in later years with the provision of a cast iron footbridge (still in situ) at platform level that provides a direct interchange.The branch is known colloquially as the "Romford Push and Pull" as it is single-track throughout. It is electrified at
25 kV AC . Electrification of the line saw an end to years of speculation about its future. There is only one intermediate station, atEmerson Park . At Upminster there is no longer a connection to the LT&S line as theDistrict Line tracks form a physical barrier.The branch is not signalled. There were plans to link the line to the tracks from platform five (District Line) at Upminster, to the depot. This would have allowed the transfer D Stock units onto the main line to be hauled away for refurbishment. These plans were scrapped due to fears of signalling requirements on the branch. The plans are evident from the point-work which was half installed (visible from the eastern end of platform 5.)
Operation
The line is entirely within
Travelcard Zone 6 . Passenger services are currently operated byNational Express East Anglia , who replaced the previous operator,First Great Eastern , on1 April 2004 . Trains are normally formed by a Class 315electric multiple unit (which are currently being refurbished with new interiors) or occasionally by a Class 321electric multiple unit .The current service pattern on the route (as of 2006) is one train every 30 minutes on Mondays to Saturdays between approximately 6.00 and 20.00. There is a slightly increased service during peak hours where the line runs at full capacity. The journey time from one end of the line to the other is 8 minutes.
References