Interstate 90 in New York

Interstate 90 in New York

Interstate 90 marker

Interstate 90

Map of New York with I-90 highlighted in red
Route information
Maintained by NYSTA and NYSDOT
Length: 385.88 mi[2] (621.01 km)
Existed: August 14, 1957[1] – present
Major junctions
West end: I-90 in Erie, PA
  US 219 in West Seneca
I-190 near Buffalo
I-390 near Rochester
I-81 near Syracuse
NY 12 in Utica
I-88 in Schenectady
I-87 in Albany
East end: I-90 in West Stockbridge, MA
Highway system

Main route of the Interstate Highway System
Main • Auxiliary • Business

Numbered highways in New York
Interstate • U.S. • N.Y. (former) • Reference • County

NY 89 NY 90

Interstate 90 (I-90) is a part of the Interstate Highway System that runs from Seattle, Washington, to Boston, Massachusetts. In the U.S. state of New York, I-90 extends 385.88 miles (621.01 km) from the Pennsylvania state line at Ripley to the Massachusetts state line at Canaan. Although most of the route is part of the New York State Thruway, a non-tolled section (situated in the Capital District and not part of the Thruway system) links Albany and its eastern suburbs. Within New York, I-90 has a complete set of auxiliary Interstates. For most of its length in New York, I-90 runs parallel to the former Erie Canal route, New York State Route 5 (NY 5), U.S. Route 20 (US 20) and the CSX railroad mainline that traverses the state.

I-90 was assigned in 1957 as part of the establishment of the Interstate Highway System. In New York, it was overlaid on the pre-existing New York State Thruway from Pennsylvania to Albany, from where it would have continued to Massachusetts on a new freeway that bypassed the Berkshire Connector to the north. Ultimately, the freeway was built from the Thruway mainline in Albany to the Berkshire Connector in Schodack, and I-90 was assigned to the segment of the Connector east of the proposed freeway. The Albany–Schodack freeway was completed in stages during the 1960s and 1970s and fully open by 1977.

Contents

Route description

New York State Thruway

West of Albany, I-90 in New York is designated along the mainline of the New York State Thruway. The Thruway begins at the Pennsylvania state line in Chautauqua County, following the shore of Lake Erie northeast and passes through the town of Cheektowaga, a large suburb of Buffalo directly east of the city. Two auxiliary routes, I-190 (leading to Niagara Falls) and I-290 (a northerly bypass of Buffalo) connect with I-90 here. East of Erie County, the Thruway turns east and passes through the suburbs of several major cities in Upstate New York, generally following the path of the Erie Canal. It passes south of Rochester and north of Syracuse, which are served by three auxiliary Interstate Highways: I-490 and I-390 connect to Rochester, while I-690 leads to Syracuse.[3]

Approaching exit 54 on I-90 westbound in West Seneca

East of Syracuse, the Thruway follows the Erie Canal and, later, the Mohawk River into the Mohawk Valley toward Utica, where I-90 skirts the northern edge of downtown and meets I-790, a short route leading into the city's center. Farther east, the freeway indirectly serves the canal and riverside cities of Little Falls (via NY 169) and Amsterdam (NY 30) on its way to Schenectady, where I-890 splits from the Thruway and serves as the connection to the city center. It rejoins I-90 in Albany County, where I-90 leaves the mainline of the Thruway at exit 24 in Albany, which is signed for I-87 north and I-90 east. Here, the route designation of the Thruway changes from I-90 east to I-87 south. Traffic intending to continue on I-90 or reach I-87 north must exit the Thruway here. Exit numbers and mile markers for I-90 reset after exiting.[3]

Albany and Rensselaer counties

The Albany–Schodack section of I-90—the only portion of I-90 in New York that is not part of the Thruway system—begins concurrent with I-87 and heads southeast from Thruway exit 24 to a toll barrier that, for now, marks the end of tolls along the freeway. Now a toll-free highway, I-90 and I-87 continue to exits 1N and 1S, which are for the Adirondack Northway (I-87) and Fuller Road Alternate (unsigned NY 910F), respectively. Located off exit 1S and Fuller Road Alternate, a spur of the Northway leading to Western Avenue (US 20), is the Crossgates Mall in Guilderland. I-90 proceeds eastward, meeting Washington Avenue at an interchange connecting to UAlbany, a state college, eastbound and Fuller Road (County Route 156 or CR 156) westbound.[4]

Exits 3 and 4, located 0.6 miles (1.0 km) apart in an area bounded by Washington and Central (NY 5) Avenues, lead to the W. Averell Harriman State Office Building Campus and the New York State Police Academy (exit 3) and to the Crosstown Arterial (NY 85 at exit 4). I-90 subsequently crosses over NY 5 and passes north of Westgate Plaza as it connects to Everett Road (CR 155). The freeway continues along the northern edge of Albany to exit 5A,[4] a large trumpet interchange originally built to serve I-687.[5] After that project was cancelled, it was repurposed as an exit for Corporate Woods Boulevard. East of exit 5A, I-90 passes by slightly more residential areas ahead of a stack interchange with US 9 1 mile (1.6 km) north of downtown Albany. Albany Memorial Hospital is located just north of the exit on US 9.[4]

The stack interchange between I-90 and US 9 in Albany as seen from I-90 eastbound

Not far to the east of US 9 is a second stack interchange, connecting I-90 to I-787 in the industrial northeasternmost section of the city of Albany. At this point, I-90 turns to the southeast and follows the Patroon Island Bridge over the Hudson River and into Rensselaer County. Across the river, I-90 becomes the Rensselaer County Veterans Memorial Highway and passes through much less developed areas. In its first 1.5 miles (2.4 km) in the county, the freeway meets Washington Avenue at the northern edge of the city of Rensselaer and the west end of NY 43 in the town of North Greenbush, southwest of US 4 and Defreestville. South of NY 43, I-90 and US 4 follow parallel routings into East Greenbush, where I-90 directly connects to US 4 at exit 11.[4]

I-90 heads southeastward across an undeveloped, forested section of the county, crossing over NY 151 and entering the town of Schodack, where it meets Miller Road, a connector between I-90 and the concurrent routes of US 9 and US 20. The freeway and the overlapping U.S. Routes follow similar routings to Schodack Center, at which point I-90 finally connects to US 9 and US 20 at exits 11E and 11W. I-90 heads due south from this point, passing over NY 150 and paralleling US 9, which splits from US 20 at Schodack Center. The routes cross paths again at exit 12 just north of where I-90 rejoins the Thruway system at a toll barrier preceding exit B1 of the Berkshire Connector.[4]

Berkshire Connector

I-90 heads southeast on the Connector, meeting the north end of the Taconic State Parkway in the Columbia County town of Chatham at exit B2 and NY 22 at exit B3 in the town of Canaan 1 mile (1.6 km) from the Massachusetts state line. The Berkshire Connector ends at the state line; however, I-90 continues southeast into Massachusetts as the Massachusetts Turnpike.[3]

History

The Berkshire Connector (I-90) near exit B2 in Chatham

The east–west corridor I-90 follows across New York has always been major, followed by the Genesee Trail (1790s), Erie Canal (1825), New York Central Railroad (1853), and later the Yellowstone Trail (1912), which became US 20 and NY 5. It was planned as part of a nationwide toll road system as early as 1938.[6] Exactly which cities would be served changed over the years, but it was the state of New York that made the decision in 1942, when they passed a law for the construction of a New York City – Albany – Buffalo – Pennsylvania "thruway". This highway, passing Utica, Syracuse, and Rochester on its path between Albany and Buffalo, would provide construction jobs in the post-World War II period.[7] The Berkshire Thruway, a branch east from near Albany to Massachusetts, was authorized in 1944, completing the east–west route across the state.[8] However, construction, which began in 1946, proceeded very slowly, with only one four-mile (6 km) portion open by 1950, when a law created the New York State Thruway Authority (NYSTA) to operate the route as a toll road. Construction then progressed much more rapidly, especially after 1954, when the authority was allowed to issue bonds not backed by the state (thus having higher interest rates).[9] The roadway was completed between Buffalo and Albany in 1954,[10] to New York City in 1956,[11] to Pennsylvania in 1957,[12] and to Massachusetts in 1959.[13]

In the meantime, the National Interstate and Defense Highways Act was enacted in 1956, promising a toll-free network of Interstate Highways throughout the nation. The Bureau of Public Roads (BPR) commissioner soon announced that the toll road met all federal Interstate Highway standards,[14] and on August 14, 1957, most of the mainline of the Thruway was incorporated into the system as part of Interstates 87 and 90. Most of the connecting Massachusetts Turnpike was also included, but a more northerly alignment, avoiding the Berkshire Thruway, was proposed by the states of New York and Massachusetts for I-90 through Albany past Pittsfield to East Lee, Massachusetts.[1][15] This alignment would be about 30% shorter than the all-toll alignment, and would provide relief to the four-lane Castleton Bridge on the Berkshire Thruway, which had been built narrower than the rest of the system because of the planned parallel alternate.[16] The BPR objected to the duplication, which would cost over $90 million, and refused to approve this alignment.[17] The eventual route ran southeast from Albany to the Berkshire Thruway at the Nassau interchange, providing Albany with an alternate route and additional bridge, but not offering any savings in distance, and creating a "toll trap" for drivers accessing the Taconic State Parkway from Albany.[18]

Overhead signage for exit 24 in Albany, where I-90 leaves the Thruway mainline to serve downtown Albany.

Construction on the route of I-90 through Albany began ca. 1963, with both ends at existing Thruway interchanges: exit 24, which crossed the Adirondack Northway (I-87) at a cloverleaf interchange and connected to Washington Avenue in western Albany, and exit B1, which connected to US 9 near Nassau.[19][20] Work on the freeway began at the Northway and progressed southeasterly to the Berkshire Connector in Rensselaer County. The portion between the Northway and Everett Road was opened to traffic in the mid-1960s[21][22] while the piece extending from Everett Road to US 4 east of Rensselaer was completed in the early 1970s.[23][24] The last section of the highway was completed to US 9 and US 20 in Schodack Center ca. 1974[25][26] and finished by 1977.[27] The Northway cloverleaf was rebuilt in the late 1980s.[28][29]

In 1999, the New York State Department of Transportation, the Federal Highway Administration and NYSTA discussed redesignating the Berkshire Connector as I-90 and redesignating the non-toll part of I-90 from Thruway exit 24 to exit B1 on the Connector as I-88. The section of the Thruway between exits 25 and 24 would then be co-designated as both I-90 and I-88. This was never implemented.[30]

Exit list (non-Thruway part of I-90 in New York)

County Location Mile[2] Exit Destinations Notes
Albany Albany 0.00 25-61-23-1 I-87 south / Thruway south – New York, Boston East end of Thruway (mainline) overlap; west end of I-87 overlap
0.25 1S To US 20 (Western Avenue)
0.40 1N I-87 north – Albany International Airport, Montreal East end of I-87 overlap
1.10 2 Washington Avenue / Fuller Road – UAlbany
2.04 3 State Offices
2.36 4 NY 85 – Slingerlands, Voorheesville Eastern terminus of NY 85
3.38 5 Everett Road
4.00 5A Corporate Woods Boulevard Formerly planned for I-687
5.51 6 US 9 – Arbor Hill, Loudonville
6.36 6A I-787 – Albany, Troy
Rensselaer Rensselaer 7.15 7 Washington Avenue – Rensselaer Eastbound exit and westbound entrance
North Greenbush 7.95 8 NY 43 – Defreestville Western terminus of NY 43
East Greenbush 9.68 9 US 4 – East Greenbush, Rensselaer, Troy
Schodack 13.32 10 Miller Road – Schodack Center, East Greenbush
14.74 11 US 9 / US 20 – East Greenbush, Nassau Signed as exits 11W (north/west) and 11E (south/east) eastbound
19.80 12 US 9 – Hudson
20.18 Thruway west to I-87 – New York City, Buffalo West end of Thruway (Berkshire Connector) overlap
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

Portal icon New York Roads portal
Portal icon Finger Lakes portal

References

  1. ^ a b American Association of State Highway Officials (August 14, 1957). Official route numbering for the National System of Interstate and Defense Highways (Map). 
  2. ^ a b "2008 Traffic Volume Report for New York State" (PDF). New York State Department of Transportation. June 16, 2009. pp. 146–149. https://www.nysdot.gov/divisions/engineering/technical-services/hds-respository/NYSDOT%20TVR%202008%20by%20Route.pdf. Retrieved January 31, 2010. 
  3. ^ a b c I Love New York (2009). New York State Map (Map). Cartography by Map Works. 
  4. ^ a b c d e Yahoo! Inc. Yahoo! Maps – overview map of Interstate 90 from Albany to Berkshire Thruway (Map). Cartography by NAVTEQ. http://maps.yahoo.com/#mvt=h&lat=42.59352&lon=-73.764625&zoom=12&q1=42.707209%2C-73.858937&q2=42.481194%2C-73.672427. Retrieved November 18, 2010. 
  5. ^ "History". Adirondack Northway Exit 3 Project. New York State Department of Transportation. https://www.nysdot.gov/regional-offices/region1/projects/i87exit3/history. Retrieved June 11, 2010. 
  6. ^ Bureau of Public Roads (1938). Location of Routes Selected for Study (Map). 
  7. ^ Statement by Assemblyman Moffat and Senator Hampton Relative to the Establishment of a State Thruway System, March 13, 1942, New York Legislative Document, 1942, v. 15 no. 80–82, p. 153
  8. ^ "The New York State Thruway: The Beginning". Thruway Chronology. New York State Thruway Authority. 2002. http://www.upstatenyroads.com/thruway-history1.shtml. Retrieved November 18, 2010. 
  9. ^ Kaszynski, William (2000). The American Highway: The History and Culture of Roads in the United States. McFarland & Company. pp. 141–142. ISBN 0-7864-0822-7. 
  10. ^ Weaver, Warren Jr. (October 27, 1954). "More of Thruway Opened by Dewey". The New York Times: p. 31. 
  11. ^ Ingraham, Joseph C. (August 27, 1956). "Thruway Opening Final Link Friday". The New York Times: p. 21. 
  12. ^ "The Thruway Becomes the Longest Toll Road". The New York Times: p. 159. December 15, 1957. 
  13. ^ Ingraham, Joseph C. (May 24, 1959). "Boston to Chicago". The New York Times: p. XX1. 
  14. ^ Pierce, Bret (September 19, 1956). "Thruway Called a Model Project". The New York Times: p. 39. 
  15. ^ Traffic Engineering (Institute of Traffic Engineers) 28. 1957. 
  16. ^ Highway Cost Estimates: Hearings before a Subcommittee of the Committee on Public Works, 1958, p. 173
  17. ^ U.S. Congress, Miscellaneous Highway Legislation, 1961, p. 112
  18. ^ "Rockefeller Urged to Veto Road Link". The New York Times: p. 25. March 30, 1964. 
  19. ^ Esso (1962). New York with Sight-Seeing Guide (Map). Cartography by General Drafting (1962 ed.). 
  20. ^ Esso (1963). New York Happy Motoring Guide (Map). Cartography by General Drafting (1963 ed.). 
  21. ^ Mobil (1965). New York (Map). Cartography by Rand McNally and Company. 
  22. ^ Esso (1968). New York (Map). Cartography by General Drafting (1969–70 ed.). 
  23. ^ State of New York Department of Commerce (1969). New York State Highways (Map). Cartography by Rand McNally and Company. 
  24. ^ Gulf Oil Company (1972). New York and New Jersey Tourgide Map (Map). Cartography by Rand McNally and Company (1972 ed.). 
  25. ^ Shell Oil Company (1973). New York (Map). Cartography by H.M. Gousha Company (1973 ed.). 
  26. ^ Gulf Oil Company (1974). New York and New Jersey Tourgide Map (Map). Cartography by Rand McNally and Company. 
  27. ^ Exxon (1977). New York (Map). Cartography by General Drafting (1977–78 ed.). 
  28. ^ Federal Highway Administration (2009). "Structure 1073530". National Bridge Inventory. United States Department of Transportation. http://nationalbridges.com/nbi_record.php?StateCode=36&struct=000000001073530. Retrieved November 18, 2010. 
  29. ^ Federal Highway Administration (2009). "Structure 1073540". National Bridge Inventory. United States Department of Transportation. http://nationalbridges.com/nbi_record.php?StateCode=36&struct=000000001073540. Retrieved November 18, 2010. 
  30. ^ Bergman Assocatiates (February 13, 2008). "Hudson River Crossing Study" (PDF). Capital District Transportation Committee and New York State Department of Transportation. p. 22. http://www.cdtcmpo.org/linkage/hudson/final.pdf. Retrieved December 25, 2009. 

External links

Interstate 90
Previous state:
Pennsylvania
New York Next state:
Massachusetts

Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Interstate 81 in New York — Infobox road state=NY route=81 type=I maint=NYSDOT length mi=183.52 length round=2 length ref= year established=1957 direction a=South terminus a=Jct|state=PA|I|81 near Binghamton junction=Jct|state=NY|NY|17 in Binghamton Jct|state=NY|I|88 near… …   Wikipedia

  • Interstate 95 in New York — Infobox road state=NY type=I route=95 length mi=23.50 length round=2 length ref= [ [http://www.fhwa.dot.gov/reports/routefinder/table1.htm Route Log Main Routes of the Eisenhower National System Of Interstate and Defense Highways Table 1] ]… …   Wikipedia

  • Interstate 78 in New York — infobox road state=NY type=I route=78 maint=Port Authority of New York and New Jersey length mi=1 length ref= [Google Maps [http://maps.google.com/maps?f=d hl=en geocode=3419391683421154724,40.727540, 74.021240%3B17516932161413290976,40.725740,… …   Wikipedia

  • List of Interstate Highways in New York — The list of Interstate Highways in New York encompasses 29 currently in use Interstate Highways mdash;eight primary Interstates and 21 auxiliary Interstates mdash;which exist entirely or partially in the U.S. State of New York. In New York,… …   Wikipedia

  • Liste der State-, U.S.- und Interstate-Highways in New York — Dies ist eine Aufstellung von State Routes, U.S. Highways und Interstates im US Bundesstaat New York, nach Nummern. Inhaltsverzeichnis 1 State Routes 1.1 Gegenwärtige Strecken 1.2 Außer Dienst gestellte Strecken …   Deutsch Wikipedia

  • Interstate 190 (New York) — Interstate 190 Map of the Buffalo area with I 190 highlighted in red …   Wikipedia

  • Interstate 495 (New York) — Interstate 495 Map of New York with I 495 highlighted in red Route informat …   Wikipedia

  • Interstate 295 (New York) — Interstate 295 Route information Maintained by NYSDOT and Triborough Bridge and Tunnel Authority Length: 9.79 mi …   Wikipedia

  • New Windsor, New York —   Town   …   Wikipedia

  • New York State Thruway — NYST redirects here. For the theatre at Lincoln Center, see New York State Theater. New York State Thruway Route information Maintained by New York State Thruway Authority …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”