NI Railways

NI Railways
NI Railways
Ni railways logo.svg
Helen's Bay station (6) - geograph.org.uk - 1503708.jpg
Franchise(s): Government-owned subsidiary
Not subject to franchising
Main Region(s): Northern Ireland
Fleet size: 35
Stations called at: 54
National Rail abbreviation: N/A: Not part of National Rail
Parent company: NITHCo (Translink)
Web site: http://www.translink.co.uk/NI-Railways/

NI Railways, also known as Northern Ireland Railways (Irish: Iarnród Tuaisceart Éireann)[1] and for a brief period of time, Ulster Transport Railways (UTR), is the railway operator in Northern Ireland. NIR is a subsidiary of Translink, whose parent company is the Northern Ireland Transport Holding Company (NITHCo), and is thus one of only two state-owned train operators in the United Kingdom, the other being East Coast. It has a common Board of Management with the other two companies in the group, Ulsterbus and Metro (formerly Citybus). The rail network in Northern Ireland is not part of the National Rail network of Great Britain and because of this separation, NIR is the only commercial, non-heritage, passenger operator in the United Kingdom to operate a vertical integration model, with responsibility of all aspects of the network including running trains, maintaining rolling stock and infrastructure, pricing etc.

Contents

History

NIR was formed in 1968 when it took over from the Ulster Transport Authority (UTA), which had operated the province's railways since 1948. Much of the railway network closed during the 1950s and 1960s, declining from 900 miles (1,500 km) to 206.61  miles (330.58 km) at present.

Suffering frequent disruption and damage to infrastructure caused by the Troubles, and starved of investment by successive political administrations, the NIR network had become badly run down by the 1960s, with old rolling stock and poorly maintained track. NIR's last steam locomotives were withdrawn in 1970.

In 1970, NIR started using new rolling stock to re-launch the once popular Enterprise service between Dublin and Belfast. These trains comprised new three diesel locomotives (the NIR Class 101 built by Hunslet in England) and Mark 2B carriages built by BREL. Despite frequent interruptions due to bomb scares, the service has remained a more or less constant feature of the NIR network.

As older trains became obsolete in the 1970s, a new type of diesel-electric multiple unit was introduced to the network, called the Class 80. BREL built these units between 1974 and 1977 to British Rail's MK 2B design with some trailer cars rebuilt from hauled stock. The power cars are powered by an English Electric 4SRKT engine, nicknamed 'Thumpers' due to their characteristic sound, and are equipped with two English Electric 538 traction motors. These entered service on the suburban lines around Belfast, becoming a stalwart on the whole network. Now a rare sight, a few of these slam-door trains remain in service primarily on the Larne-Belfast line, as well as the Coleraine-Portrush Line. In the early 1980s, NIR also purchased one of the prototype single car LEV Railbuses built to test the railbus concept on the British network. This was intended for use on the Coleraine-Portrush branch, but was withdrawn due to the capacity constraints of operating a single car on the route. A plan was also mooted to utilise the vehicle on the Lisburn-Antrim line to prevent it from being closed. This proposal failed again because of the limited capacity provided by the vehicle.[2]

A former logo of the company

NIR have three EMD class 111 (111–113) for freight and passenger use and were built in 1980 (111–112) and 1984 (113).

During the eighties it was apparent that additional trains would be needed. BREL built nine 450 Class sets on former MK 1 underframes between 1985 and 1987. The power cars are powered by an English Electric 4SRKT engine recovered from former 70 Class units (except 457 which uses the engine recovered from 80 Class power car 88) and are equipped with two English Electric 538 traction motors and is a three car diesel-electric multiple unit, based on a more modern British design, with air operated sliding doors. Now in the process of a mid-life refurbishment, these trains continue in service.

In 1994, NIR bought two EMD 208 Class locomotives, identical to Iarnród Éireann's 201 Class. These haul the cross-border Enterprise, dedicated sets of modern carriages.

In 2004/2005, NIR received delivery of twenty-three 3000 class diesel multiple units from CAF of Spain, in an order which totalled £80m.[3] The final unit, 3023, arrived in Belfast Harbour on 18 July 2005.[4] All units had entered service by 24 September 2005. They operate principally between Bangor, Portadown and Derry and Belfast.

Performance

The latest performance figures for NI Railways according to Translink are 99% of trains arriving at the final destination within 5 minutes and 100% within 10 minutes of the scheduled time. Among other accolades, NI Railways won the prestigious UK Rail Business of the year for 2008[5]

Rolling stock

Current fleet

Since the 1950s, services in Northern Ireland have been mainly operated by diesel-electric multiple units rather than locomotive hauled stock. Today, NIR operates three distinct types of DEMU. These are supplemented by a single rake of locomotive hauled stock, which is pulled by one of NIR's three diesel locomotives.

Class Image Type Top speed Number Routes operated Built
 mph   km/h 
Class 111 Dunmurry station (1996) - geograph.org.uk - 636208.jpg Diesel locomotive 90 145 3 Belfast - Portadown
Infrastructure duties
1980 - 1981
Class 80 Derriaghy railway station in 2004.jpg diesel multiple unit 70 112 1 Sandite duties 1974 - 1978
Class 450 Hilden railway station in 2004.jpg diesel multiple unit 70 112 8 Belfast - Larne

Coleraine - Portrush

1985 - 1987
Class 3000 Lisburn railway station in 2007.jpg diesel multiple unit 90 145 23 Belfast - Derry
Belfast - Newry
Belfast - Bangor
2002 - 2004
Class 4000 Diesel Multiple Unit 90 145 3 (17 to follow) Belfast - Larne 2010 onwards
"Gatwick" Stock 8313 at London Victoria.jpg coaching stock 70[6] 112 8 Carriages Belfast-Portadown 1983 - 1984
DBSO NIRailwaysDBSO.jpg Control Car (rail) 100 160 1 Belfast-Portadown 1979
2008 (refurbished)

NIR is in the process of withdrawing the 80 Class DMUs, which have been replaced by the C3K units. A limited number of these units have been refurbished to operate peak time Larne Town services, with one 450 Class utilised to operate the Coleraine-Portrush shuttle, freeing the C3K trains from this task for longer routes, as well as filling other gaps in the timetable.[7] A further two car 80 Class unit is utilsed as NIR's sandite train. The nine 450 Class units primarily operate the service between Belfast and Larne Harbour. The Class 111 locomotives used to operate one passenger service each weekday, with a rake of eight modified Class 488 coaches that were formerly used by Gatwick Express, combined with a former Mark 2B coach converted for use as a generator van. In NIR service these are known as "Gatwick Set".

In 2006 a DBSO was purchased from Rivera Trains to add to the Gatwick Set, with the three locomotives in the process of being converted to push-pull operation.[7] This was intended to allow the rake of "Gatwick" stock, which does not have its own driving car, to be utilised to a greater extent because it will negate the need to run the locomotive around. This arrived on 26th June 2009 and was expected to enter service later that year, but has since been placed into warm store along with the Gatwick Set at both Fort William Depot and Lisburn station sidings, with the DBSO Stored in NIR's York Road Depot. The purchase of the new C4K units is intended to totally replace NIR's old fleet, with both the Class 80s and Class 450s to be deleted. The intention with the "Gatwick" set is to maintain it as a "strategic reserve" for both Enterprise and mainline NIR services.[8]

NIR also owns two 201 Class locomotives and 14 De Dietrich Stock coaches which are shared with a similar number owned by Iarnród Éireann and used by Enterprise.

In 2005, NIR investigated the possibility of obtaining seven Class 222 DEMUs built for the British network. In the event, these entered service with their intended operator Midland Mainline. The trains would have required significant modification to enable NIR to use them, not least of which would have been their conversion from standard gauge to Irish gauge.[9]

In 2007, NIR announced plans to purchase up to 20 new trains under its "New Trains 2010" proposal following the confirmation of its expected budget. It is planned that this fleet will replace the remaining Class 80 and Class 450 trains from 2011. Renamed as "New Trains Two", this project went out to tender in late 2007, with the company due to be appointed in early 2009. Work on the new trains would begin shortly thereafter with the units entering service from 2011 onwards.[10] In March 2009 it was announced that CAF had been selected to build the new fleet, renamed as Class 4000.[11] The first units were delivered in March 2011, with entry into service in October[12] At the same time, the last Class 80 units were withdrawn from passenger service, although a set will continue to be used as NI Railways' sandite train.[13]

Past fleet

 Class   Image   Type   Built   Withdrawn   Notes 
MED Delayed train, Lisburn - geograph.org.uk - 1087236.jpg Diesel Multiple Unit 1952-1954 1973-1978 Intended for local services
around Belfast
MPD Railcar at Crumlin - geograph.org.uk - 1087272.jpg Diesel Multiple Unit 1957-1962 1981-1984 Intended for longer distance
former NCC routes and
Enterprise
70 Class Permanent way train, Larne - geograph.org.uk - 1088463.jpg Diesel Multiple Unit 1966-1968 1985-1986
101 Class 101 NIR enterprise service - dublin - 15-09-1980.jpg Diesel locomotive 1970 1989 Intended for loco hauled
Enterprise services
104 Class Ballast train, Whitehead - geograph.org.uk - 1630002.jpg Diesel locomotive 1956-1957 1993 Originally built for CIÉ;
six transferred to NIR
in 1986
RB3 Geograph-2333183-by-Albert-Bridge.jpg Diesel Multiple Unit 1981 1989 Prototype built for British
network
; transferred to NIR
in 1983
Class 1 Broken-down train at Ballyrobert - geograph.org.uk - 1021197.jpg Diesel locomotive 1969 1989 Shunter

Routes

A Class 3000 approaching Seahill on the Bangor line

NIR currently maintains the following railway lines

NIR operates regular passenger services along the following major routes (only major stations are listed):

  • Portadown, Lisburn, Belfast Great Victoria Street, Belfast Central, Holywood and Bangor
  • Belfast Great Victoria Street, Belfast Central and Larne
  • Belfast Great Victoria Street, Belfast Central, Antrim, Ballymena, Coleraine and Derry
  • Coleraine and Portrush

On the cross-border route between Belfast and Dublin, NIR operates a joint service of fast trains under the name Enterprise in conjunction with the national railway company of the Republic of Ireland, Iarnród Éireann.

Suspended routes

Following the re-opening of the 15-mile (24 km) Antrim - Bleach Green line in June 2001,[14] which had been closed since 1978, NIR ceased passenger operations between Lisburn and Antrim on 29 June 2003. Combined with the newly built Dargan Bridge across the River Lagan in Belfast, the Bleach Green route offered faster journey times between Derry, Coleraine, Ballymena, Antrim and Belfast.

The infrastructure of the Lisburn-Antrim railway line is still maintained, and occasional crew training operations are performed on the line. While it is also available as a diversionary route, Ballinderry, Glenavy and Crumlin stations have closed.

Future

The development of the railways in Northern Ireland has been linked to the future economic growth of the region, and as a way of reducing the levels of congestion on Northern Ireland's roads.[15] One of the major challenges which NI Railways has faced is the limited number of trains available for service at peak times. The limited fleet size has led to services being cancelled due to failures or delays. This can lead to widespread disruption across the network and potentially a huge loss in revenue to Translink. Upon its establishment in 1998, the Northern Ireland Assembly put in place an investment programme costing £100 million to bring about major improvements to the railways. This programme saw various projects including the purchase of the new 3000 Class trains, the complete relaying of track on the Belfast-Larne line and the construction of a new maintenance depot.[16] Following the completion of this, Translink, as part of its long-term investment programme for NIR, conducted what it termed the "Strategic Rail Review" in 2004, an independent review of rail services to determine its funding request under the Comprehensive Spending Review. This report determined that so-called "lesser used lines" were an important and economically viable part of the total network, and that investment should be consistent rather than in the "stop-go" manner of previous years.[17]

A debate in the Northern Ireland Assembly on 14 May 2007[18] raised several proposals as to how the railway network could be improved:

  • Reopening of existing but closed infrastructure, most notably the Lisburn-Antrim line
  • Improvement of the infrastructure on the Belfast-Derry line through, at the very least, the installation of passing loops to allow service frequency to be increased, while upgrading the track to allow trains at higher speed.
  • Purchase of new rolling stock to allow the complete replacement of the remaining 450 Class and 80 Class units
Northern Ireland Network Enhancement (NINE)

Further proposals from external pressure groups have advocated the protection of former routes, where the track has been lifted but the trackbed remains intact, to enable these routes to be reinstated in the future in the event of the growth of commuter traffic as an alternative to increased road building.[19]

In October 2007, following the CSR which provided funding allocation to the Northern Ireland Executive, the Department for Regional Development was able to announce its draft budget. Conor Murphy, the Regional Development Minister, stated that approximately £137 million could be allocated from this draft budget for investment in the railways for the period 2008-2011.[20]

In June 2008, Brian Guckian, an independent transport researcher from Dublin, presented a wide ranging proposal to Translink for a £460 million expansion of the network in Northern Ireland called Northern Ireland Network Enhancement (NINE). This proposes the return of the network to several towns that have not had access to rail services for many years; the main part of the proposal would see the Derry-Portadown line re-opened, which would link Omagh, Strabane and Dungannon, with branches to Enniskillen and Armagh. In addition, this plan would see the re-introduction of services into the centre of Newry through a short spur from Goraghwood, and the introduction of the long-proposed rail link to Belfast International Airport via the Lisburn-Antrim line.[21] This proposal has been tied together with the cross-border link to Donegal, as it would potentially allow travel from Letterkenny to Dublin via Omagh in approximately three and a half hours.[22]

Infrastructure

Class 3000 units at Great Victoria Street. Proposals have been made to increase capacity by building an additional platform, and make this Enterprise's northern terminus

At present, the rail network in Northern Ireland is concentrated around the Greater Belfast area. Both the Bangor and Larne lines have been re-laid in recent years, enabling timetable improvements to be delivered.[23] The only significant "inter-city" routes are the main line between Belfast and Dublin, which covers services to Newry, and the Belfast-Derry line. This line is single track with passing points north of Mossley West, and single track only west of Coleraine, which causes the service to the second city to be limited, both in terms of service frequency and service speed; according to the current timetable, the train takes 2hr 20 m[24] while the bus takes an hour less.[25] The pressure group Into the West, which campaigns for improved rail links to the North-West region, have stated that the need for a quality rail service, as part of a larger integrated transport policy, is vital to the economic development not just for the city of Derry, but for the wider cross-border region as a whole.[26]

On 21 November 2007, the Regional Development Minister announced that the investment strategy being considered by the NI Executive included the relaying of the Belfast-Derry line north of Coleraine. This project is planned to include new signalling and a new passing loop, thereby allowing more trains on the route. The cost has been estimated at £64 million, and has been projected to begin in 2011, lasting two years. Prior to the major relaying of the Coleraine-Derry section, £12 million will be spent on improving the section between Ballymena and Coleraine,[27] on which work has already begun. This will see the stretch of line between Ballymena and Coleraine close completely for four months, with a replacement bus service substituting. Trains will continue to run between Derry, Coleraine and Portrush, with a small fleet of trains stabled at Coleraine for this purpose,[28] however 4 trains have been stabled instead of the 3 previously reported. Once the project has been completed, there is a further proposal to add two additional trains per day to the route, enabling journey times between Belfast and Derry to be reduced by up to 30 minutes.[29] As part of this plan, Translink envisage an hourly service to Derry, with a half-hourly service to Ballymena. In addition, there have been proposals to improve the Belfast-Dublin line between Knockmore and Lurgan, enabling journey times to be reduced and frequency to be increased on this route.[20] This will improve not only NIR's services, but also allow an hourly Enterprise service to Dublin.[23]

In May 2008, the Regional Development Minister announced that his department would commission a study, in conjunction with Donegal County Council, to investigate the effects a resurrection of railway services in the north-west of Ireland. This is with a long-term projection of building a railway line connecting Derry with Sligo through County Donegal.[30]

As part of NI Railways' plans for its new rolling stock, it is constructing a new traincare depot next to Adelaide station on the site of the old freight yard. As a means of improving timings of its services, Belfast Great Victoria Street is planned to undergo a major refurbishment that will see the platforms lengthened and the curves reduced, together with the addition of a new fifth platform, all of which is planned to bring about the transfer of Enterprise's services from Belfast Central. This would see Enterprise terminating trains at the city's central terminus.[31]

Further plans are afoot to double the track from Monkstown to Templepatrick, to further increase capacity on the Londonderry line. This is due to be completed by January 2015.

Airport links

Speculation remains that the Lisburn-Antrim route could one day re-open, potentially to offer an alternative Antrim - Lisburn - Belfast service. The line is maintained both for crew training and as a diversion, and passes very close to Belfast International Airport at Aldergrove. For a number of years there have been suggestions that a new station be built on the line for trains to serve the airport.[32] The Airport has marked the building of a new station in its list of future plans,[33] while EasyJet, which is the largest operator into Belfast International, have been strong in advocating an airport rail link.[34] The reopening of the Lisburn-Antrim line is seen not simply in terms of provision of a link to the airport however - it would also allow for the further economic development of the area, which has seen increases in population as people use the towns in South Antrim as dormitary settlements for Belfast.[35] In May 2009, the Minister for Regional Development stated that a proposal had been received from a private developer, the Kilbride Group, to restore the Knockmore line, indicating that he would be prepared to part fund a study into this if the local authorities provided the rest of the funding. The route is also included in a wider study of the development of the Northern Rail Corridor due at the end of 2009[36]

The Belfast Metropolitan Area Plan 2015 identifies the need to improve transport links to Belfast City Airport from the city centre. The BMAP proposed a light rail system from the city centre that would have interchanged with a new railway station at Tillysburn, which could serve both the airport and the Holywood Exchange retail development.[37] However, in April 2008, the decision was taken not to proceed with the light rail project, with the DRD instead choosing to implement a new bus based network.[38][39] The pressure group Rail 21 have also stated that the Tillysburn proposal is insufficient for what the new station is expected to provide - a link to the airport, transport provision for Holywood Exchange and a park and ride facility. Instead they propose that, instead of the Tillysburn station, which will still be some distance from the airport terminal, providing rail links to the airport, a dedicated airport station, similar to Glasgow Prestwick Airport, should be connected directly to the terminal, with Tillysburn located half a mile away serving Holywood Exchange.[40]

There have also been calls, as part of the wider upgrade of the rail route to Derry, for a railway station connecting to City of Derry Airport, which is close to the railway line. However, the Government have determined that the number of passengers using the airport is not sufficient to justify a new railway station.[41]

Rolling stock

Although the introduction of the Class 3000 trains has been considered a success, this is tempered by fact that they were a like for like replacement for the Class 80 units, rather than an expansion of the fleet. Due to the limited number of new units in service, some of NIR's older rolling stock has had to be retained, most notably the entire Class 450 on the Belfast-Larne route. To enable NIR to maintain its levels of service, it has set about upgrading some of its older rolling stock. In 2005, the entire Class 450 fleet was refurbished to a standard close to that of the Class 3000 units, which, it is intended, will see them through to their intended withdrawal date of around 2012. There will be refurbishment of up to three 4-car Class 80 units, and the conversion of the locomotives and coaches to push-pull operation with the addition of the DBSO obtained from 'one', to ensure that passenger rolling stock levels can be maintained up to the introduction of new rolling stock.[7]

One of the major projects instigated by Translink is what it initially termed "New Trains Two" (formerly "New Trains 2010"), which will see the purchase of a new batch of rolling stock. At minimum, this was to be a like for like replacement of the Class 450 trains, which are due to be withdrawn by 2012. However, it has been determined that in order to deliver improved frequency of service on the network the size of NIR's fleet must be increased, and with that must come associated infrastructure improvements.[17] The announcement of the investment programme confirmed "New Trains 2010", which will procure at least 20 new trains to both replace the remaining Class 80 and Class 450 units and provide additional capacity.[20] The specification given by the DRD also states that the new trains are to be used to provide both inner and outer suburban commuter services and express services between Belfast and Dublin.[42] The Class 4000 fleet is estimated to enter service by 2011.[10] A total of twenty 3-car units have been specified to be purchased, with an option to purchase an additional twenty vehicles allowing the fleet to be lengthened to 4-cars.[43]

References

  1. ^ Ag Taisteal le Translink. Translink (Irish)
  2. ^ Railbus to Drive out of Retirement in Downpatrick
  3. ^ BBC News: New trains make first journey
  4. ^ Translink Press Release: Last New Train lands at Belfast Harbour
  5. ^ Monitoring Results
  6. ^ Designed to run at 100mph (160km/h), but restricted to 70mph (112km/h) in NIR service per Working Timetable
  7. ^ a b c NIR News 164
  8. ^ Reply to FOI request from Translink; text verbatim at this address. Obtained 17/12/10
  9. ^ NIR News 157
  10. ^ a b BBC News: Railway line to get new trains
  11. ^ BBC News: Contract signed on trains for NI
  12. ^ C4Ks start running to Larne - Railway Gazette, 04/10/11
  13. ^ Getting students on board - NI Railways, 23/09/11
  14. ^ Antrim - Bleach Green: Rebirth of a Railway Line
  15. ^ Ulster rail expansion needed - Railwatch, 08/2000
  16. ^ An 'enterprising' future for Northern Ireland
  17. ^ a b Core Programme: Better Rail Services
  18. ^ Northern Ireland Assembly: Development of the Rail Network
  19. ^ Rail21: Protection of the Former Railway Trackbed from Kingsbog to Ballyclare
  20. ^ a b c Regional Development Minister welcomes draft Budget allocations
  21. ^ £460 Million NI Rail Network Expansion Proposed
  22. ^ Proposals for a rail link to Enniskillen
  23. ^ a b Northern Corridor Railways Group: Northern Corridor Railway Renaissance
  24. ^ NIR Belfast-Londonderry
  25. ^ Goldlink Belfast-Londonderry
  26. ^ Ships and boats and trains
  27. ^ New Intercity train fleet starts on fastest-growing route
  28. ^ Downsized rail network 'speedier'
  29. ^ Open letter to media from Conor Murphy on Londonderry railway line
  30. ^ North West railway study announced
  31. ^ Ferris, Cyril (2009). "Enterprise moving to Great Victoria Street?". Today's Railways (97): 37. 
  32. ^ BBC News: Fresh call for airport rail link
  33. ^ Belfast International Airport Master Plan
  34. ^ BBC News: Disused track 1-mile (1.6 km) from airport
  35. ^ Northern Ireland Assembly: Antrim to Knockmore Railway Line
  36. ^ NIR News 170
  37. ^ BMAP Transport Proposals
  38. ^ BBC News: City to get rapid transit network
  39. ^ BBC News: 'No light rail system for city'
  40. ^ Rail 21: New Railway Station at Tillysburn
  41. ^ Northern Ireland Assembly: Derry/Londonderry to Belfast Rail Service
  42. ^ NIR News 165
  43. ^ Tender Details for NIR Class 4000

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Railways Building — Das Railways Building (links) …   Deutsch Wikipedia

  • Railways of Montenegro — EMU train at the Podgorica Rail Station Operation National railway Жељезница Црне Горе / Željeznica Crne Gore (ŽCG) …   Wikipedia

  • Railways of Liberia — consist of two lines from the port of Monrovia and one line from the port of Buchanan. Accidents * MAKE AWAY ACCIDENT DETAIL 1 February, 2006More detail has emerged on the 13 January accident in Liberia, on the recently revived Bong Mines railway …   Wikipedia

  • Railways Stadium — is a multi use stadium in Kabwe, Zambia. It is currently used mostly for football matches and serves as the home for Kabwe Warriors Football Club. The stadium holds 10,000 people …   Wikipedia

  • Railways in Nepal — hardly exist before 2008. In 2008, serious proposals surfaced to build a link from Lhasa in Tibet, China to Nepal. Maps * [http://www.un.org/Depts/Cartographic/map/profile/nepal.pdf UN Map] ] Railway stations*Railway stations in Nepalee… …   Wikipedia

  • Railways in Melbourne — Melbourne rail network  City Loop  Caulfield group  Frankston line  Pakenham line  Sandringham line  Cranbourne line …   Wikipedia

  • Railways of Jamaica — The Railways of Jamaica, constructed from 1845, were the first railway lines opened to traffic outside Europe and North America, and the second British Colony after Canada s Champlain and St. Lawrence Railroad of 1836 to receive a railway system …   Wikipedia

  • Railways Act 1921 — The Railways Act of 1921, also known as the Grouping Act, was an enactment by the British government of David Lloyd George intended to stem the losses being made by many of the country s 120 railway companies, move the railways away from internal …   Wikipedia

  • Railways of Greece — The Railways of Greece have a compex history which starts in 1869, with Athens Piraeus Railway .HistoryGreece became independent in 1832, the birth of the newly formed sovereign state coinciding with the start of the railway era. By 1835 plans… …   Wikipedia

  • Railways of Shropshire — The English county of Shropshire has a fairly large railway network, with 19 National Rail stations on various national lines, as well as a small number of heritage and freight lines, including the famous heritage Severn Valley Railway running… …   Wikipedia

  • Railways on the West Coast of Tasmania — The history of the Railways on the West Coast of Tasmania has fascinated enthusiasts from around the world, because of the combination of the harsh terrain in which the railways were created, and the unique nature of most of the lines. The Mount… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”