SR Merchant Navy class

SR Merchant Navy class
SR Merchant Navy class[1]
A posed side-and-front view of a large 4-6-2 steam locomotive with a tender. The locomotive boiler is hidden by a casing of flat metal side sheets.
Official Southern Railway photograph of 21C1 Channel Packet as built, 1941
Power type Steam
Designer Oliver Bulleid
Builder SR Eastleigh Works
Build date 1941–1949
Total produced 30
Configuration 4-6-2 (Pacific)
Gauge 4 ft 8 12 in (1,435 mm)
Leading wheel
diameter
3 ft 1 in (0.940 m)
Driver diameter 6 ft 2 in (1.880 m)
Trailing wheel
diameter
3 ft 7 in (1.092 m)
Length 69 ft 8 in (21.23 m)
Locomotive weight 94.75 long tons (96.3 t)
Fuel type Coal
Fuel capacity 5.00 long tons (5.1 t)
Water capacity 5,000 imp gal (22,730 L; 6,000 US gal)
Boiler pressure 280 psi (1.93 MPa) (reduced to 250 psi (1.72 MPa))
Firegrate area 48.5 sq ft (4.51 m2)
Cylinders 3
Cylinder size 18 × 24 in (457 × 610 mm)
Tractive effort 37,515 lbf (166.9 kN)
Career Southern Railway,
British Railways (Southern Region)
Class SR / BR: Merchant Navy
Power class SR: A
BR: 8P
Locale Great Britain

The SR Merchant Navy class (originally known as the 21C1 class, and later informally known as Bulleid Pacifics, Spam Cans or Packets), was a class of air-smoothed 4-6-2 Pacific steam locomotives designed for the Southern Railway of the United Kingdom by Oliver Bulleid. The Pacific design was chosen in preference to several others proposed by Bulleid. The first members of the class were constructed during the Second World War, and the last of the 30 locomotives in 1949.

Incorporating a number of new developments in British steam locomotive technology, the design of the Merchant Navy class was among the first to use welding in the construction process; this enabled easier fabrication of components during the austerity of the war and post-war economies.[2] The locomotives featured thermic syphons and Bulleid's innovative, but controversial, chain-driven valve gear.[3] The class members were named after the Merchant Navy shipping lines involved in the Battle of the Atlantic, and latterly those which used Southampton Docks, a publicity masterstroke by the Southern Railway, which operated Southampton Docks during the period.[4]

Due to problems with some of the more novel features of Bulleid's design, all members of the class were rebuilt by British Railways during the late 1950s, losing their air-smoothed casings in the process. The Merchant Navy class operated until the end of Southern steam in July 1967. A third of the class has survived and can be seen on heritage railways throughout Great Britain.

Contents

Background

The Southern Railway was the most financially successful of the "Big Four", but this was largely based on investment in suburban and main line electrification .[5] After the successful introduction of the SR Schools class in 1930 the railway had lagged behind the others in terms of modernising its aging fleet of steam locomotives. Following the retirement of the General Manager of the Southern Railway Sir Herbert Walker and Richard Maunsell the Chief Mechanical Engineer (CME) in 1937, their successors considered that the time had come to change this situation.[6] In March 1938 the new General Manager Gilbert Szlumper authorised Oliver Bulleid, Maunsell's replacement, to prepare designs for twenty express passenger locomotives.[7] The deteriorating international situation prior to the Second World War was an additional factor in this decision.[6]

Bulleid's first suggestion was for an eight-coupled locomotive with a 4-8-2 wheel arrangement for the heavily loaded Golden Arrow and Night Ferry Continental express trains,[7] although this was quickly modified to a 2-8-2 equipped with a Helmholtz "Bissel bogie" – a system already successfully applied on the Continent.[8] However, both proposals for eight-coupled locomotives were resisted by the Southern Railway's Chief Civil Engineer, so a new 4-6-2 Pacific design was settled upon instead.[9] The new design was intended for express passenger and semi-fast work in Southern England, though it had to be equally adept at freight workings due to the nominal "mixed traffic" classification Bulleid applied to the class for them to be built during wartime.[10] Administrative measures had been put in place by the wartime government preventing the construction of express passenger locomotives due to shortages of materials and a need for locomotives with freight-hauling capabilities.[10] Classifying a design as "mixed traffic" neatly circumvented this restriction.

Design

Most of the detailed design for the Merchant Navy class was undertaken by the drawing office at Brighton works, but some work was also undertaken by Ashford and Eastleigh. This division of responsibility was possibly due to Bulleid's wish to restrict knowledge of the new class to a limited number of personnel.[11] The design incorporated a number of novel features, compared to current steam locomotive practice in Great Britain.

Valve gear, wheels and brakes

An almost solid disc (not spoked) locomotive wheel with a series of cast-in radial indentations and prominent round holes intended to reduce its weight.
A driving wheel of the distinctive Bulleid-Firth-Brown design, seen here on 35010 Blue Star. Note the balance weight on the lower right, a feature not present on the Merchant Navy locomotives as-built.

It was originally intended to use a gear-driven valve gear, but space restrictions within the frames and wartime material shortages led Bulleid to design his novel chain-driven valve gear.[3] This component was unique amongst British locomotive design practices.[12] It later gained a bad reputation because it could cause highly irregular valve events, a problem compounded by the fast-moving Bulleid steam reverser. The entire system was located in a sealed oil bath, another unique design, providing constant lubrication to the moving parts.[13]

The locomotives were equipped with the unusual 6 ft 2 in (1.88 m) Bulleid-Firth-Brown (BFB) driving wheels which were lighter, yet stronger than the spoked equivalent.[14] These proved to be successful and were later used on other Bulleid classes. The leading bogie was based upon that of the SR Lord Nelson class, although it had a 6 ft 3 in (1.90 m) wheelbase as opposed to Maunsell's 7 ft 6 in (2.28 m) design, and featured 3 ft 1 in (0.94 m) BFB wheels.[15] A long coupled driving wheelbase was incorporated into the design to keep the locomotives within the lineal loading of the Southern Railway's narrower bridges.[15] The supporting rear trailing truck was a one-piece steel casting that gave the smoothest of rides; the design was utilised in the future BR Standard Class 7.[3]

The spaces between driving wheels housed steam-powered clasp brakes that gripped the wheels by way of a "scissor" action.[13] The two middle brake hangers held two brake blocks each, whilst the two outside hanger on the leading and rear driving wheels held one block each.[15] These were connected together by outside rodding for ease of access, and the whole system was operated from the footplate.

Boiler and welded firebox

The maximum boiler pressure was higher than any other British regular service locomotive at 280 psi.[3] Bulleid originally intended to use welding in the construction of the boilers, however he soon discovered that the Southern Railway was incapable of manufacturing welded boilers of this size.[14] The boilers had to be ordered on outside contract from the North British Locomotive Company, and were of riveted construction.[14] The tube plates that held the fire tubes and superheater elements inside the boiler were also made of steel to reduce maintenance.[14]

The inner and outer firebox of the Merchant Navy class was constructed by North British using welding, as opposed to the riveting that was more common practice. This made for cheaper construction and a firebox 1.5 long tons (1.5 t) lighter than a copper example of equal size.[14] Steel plate also lacked the elasticity of copper when exposed to water at high temperatures, reducing maintenance.[14] Two welded steel Thermic syphons were implemented to improve water circulation between the boiler and the top of the firebox (the "crown").[3] These were subcontracted to Beyer Peacock.[7]

Air-smoothed casing, smokebox and blastpipe

The boiler was enveloped by Bulleid's air-smoothed sheet steel casing, which was not for the purposes of streamlining, as demonstrated by the extremely flat front end, but as a way of lifting exhaust gases.[16] The flat sides were also an aid to cleaning the locomotive with a carriage washer, representing an attempt to reduce labour costs.[17] It followed the profile of the Belpaire firebox and extended to a curved profile forward of the smokebox front.[15] The smokebox was a sheet metal fabrication to the same profile as the firebox, acting as a former to maintain the shape of the air-smoothed casing.[15] In between, the casing was supported by channel-section steel crinolines (strengtheners used to maintain the shape) attached to the frames. The smokebox housed the five-nozzle Lemaître blastpipe arranged in a circle within a large-diameter chimney.[15]

Tender

Bulleid designed a new 5,000 imperial gallons (22,730 L; 6,000 US gal) tender which could carry 5 tons (5.1 t) of coal on a six-wheel chassis.[15] It featured BFB wheels and streamlined panels, or "raves", that gave the top of the tender a similar cross-sectional outline to the carriages hauled by the locomotive.[13] The water tank was of welded sheet construction to save weight, and the tender was fitted with vacuum braking equipment of a clasp-type similar to that used on the locomotive.[15] Three train-brake vacuum reservoirs of cylindrical construction were grouped on the tank top, behind the coal space.[15] Unusually for a British locomotive, two extra water filler caps were incorporated into the tender front, for access from the footplate. The original tender design proved to be inadequately braced and subject to serious leakage if even slightly damaged, or when water surges caused the welded joints to split. The problem was not solved until 1944 when additional baffling was fitted.[18]

Other innovations

Electric lighting was also provided on both the locomotive and the footplate, supplied by a steam-powered generator fitted below the footplate.[3] The gauges were lit by ultra-violet light. This enabled clearer night-time vision of the boiler steam pressure gauge and the brake pipe vacuum pressure gauge whilst eliminating dazzle, making it easier for the crew to see signals along the track.[3] Close attention was also paid to the ergonomics of the driving cab which was designed with the controls required for operation grouped according to the needs of both fireman and driver, thus promoting safe operation.[19] As an aid to the fireman, a steam-operated treadle was provided that used steam pressure to open the firehole doors (where the coal is shovelled into the firebox).[3] The footplate was entirely enclosed, improving crew working conditions in winter.

Construction

For construction history of the class, see: List of SR Merchant Navy class locomotives

The Southern Railway placed an order for ten of the new locomotives to be built at Eastleigh Works, although the boilers had to be supplied from private industry and the tenders were built at Ashford.[7] The prototype was completed in February 1941, numbered 21C1, and named Channel Packet at a ceremony at Eastleigh works on 10 March 1941.[7] It underwent extensive trials and minor modifications before joining Southern Railway stock 4 June 1941.[7] A second prototype, 21C2 Union Castle was completed in June and named at Victoria railway station 4 July. Both prototypes were found to be seven tons over the specified weight, and, at the insistence of the Southern Railway Civil Engineer, production of the remainder was halted until steps were taken to remedy this.[7] This was achieved by using thinner steel plates for the frame stretchers and covering the boiler cladding, and enlarging the existing lightening holes in the main frames.[7] The remaining eight locomotives in the batch were delivered between September 1941 and July 1942.

A second batch of ten followed, beginning in December 1944 and culminating in June 1945. These were entirely constructed at Eastleigh [7] and equipped with 5,100-imperial-gallon (23,190 L; 6,120 US gal) tenders.[20] The Merchant Navy class spawned the design and construction of a lighter version of the same locomotive with consequently increased route availability. These were the West Country and Battle of Britain class Light Pacifics, the first of which entered service in 1945.

Just prior to nationalisation of the railways in 1948, the Southern Railway placed an order for ten more Merchant Navy locomotives, with larger 6,000-imperial-gallon (27,280 L; 7,210 US gal) tenders. A shortage of materials meant that delivery was delayed until September 1948, and completed in 1949; the batch never carried Southern Railway numbers.[13] Eastleigh was responsible for the assembly of the final batch, which were in the series 35021–35030.[21] Construction was undertaken in-house by Eastleigh works, with the boilers and tenders constructed at Brighton, the frames at Ashford and the rest at Eastleigh.[21] These were equipped with wedge-shaped cab fronts from the outset, and greater use of welding ensured lighter locomotives. The batch was also fitted with the TIA ("Traitement Integral Armand") chemical feed-water equipment used on the Light Pacifics.[22] This precipitated scale-forming constituents in the "hard-water" of southern England into a non-adhesive mud that could be cleared from the locomotive using a manual "blow-down" valve.[22] A delay in the construction of the new larger tenders for the new locomotives meant that some were fitted with the smaller examples intended for use with Light Pacifics that were under construction at the time.[22] Two spare boilers for the class were also constructed at Brighton and Eastleigh during 1950/1.

Numbering and naming the locomotives

For details of Merchant Navy class locomotive names, see: List of SR Merchant Navy class locomotives
A Merchant Navy class enamelled metal nameplate mounted on the side of the locomotive boiler. The nameplate comprises a circle, containing a picture of the company flag of the shipping line, and two rectangles on either side containing the class name. In a larger circle bordering the central flag is the name of the shipping line.
Nameplate configuration of the Merchant Navy class (here 35005 Canadian Pacific)

Bulleid adopted a new numbering scheme for all his locomotives based on Continental practice, following his experiences at the French branch of Westinghouse Electric before the First World War, and those of his tenure in the rail operating department during that conflict. The Southern Railway numbers followed an adaptation of the UIC classification system of using letters and numbers to designate the powered and unpowered axles, together with a running number. Thus the first 4-6-2 locomotive became 21C1 – where "2" and "1" refer to the number of unpowered leading and trailing axles respectively, and "C" refers to the number of driving axles, in this case three.[3] The remainder were numbered 21C2-21C19. The scheme was abandoned by British Railways in 1949 and the existing locomotives were renumbered under the British Railways standard system in the series 35001-35019; the final batch appeared in traffic as 35020-35029.[23]

The Southern Railway considered naming the locomotives after victories of the Second World War, to the extent that a mocked-up nameplate River Plate was produced.[24] In the event, when early successes for the British proved few and far between, the chairman of the Union Castle Line suggested naming them after shipping companies which had called at Southampton Docks in peacetime.[25] This idea resonated in 1941 because the shipping lines were heavily involved in the Atlantic convoys to and from Britain during the Second World War.[24]

A new design of nameplate was created, featuring a circular plate with a smaller circle in the centre. The inner circle carried the colours of the shipping company on a stylised flag, on an air force blue background. Around the outer circle was the name of the locomotive, picked out in gilt lettering. A horizontal rectangular plate was attached to either side of the circular nameplate, with "Merchant Navy Class" in gilt lettering.[24] This acted as a class plate, as indicated on the nameplate photograph, right.

During their operational career, the class gained several nicknames; the most obvious, Bulleid Pacific, simply denoted the designer and wheel arrangement. The colloquial name Spam Can arose from their utilitarian appearance, enhanced by the flat, boxy air-smoothed casing, and the resemblance of this to the distinctive tin cans in which SPAM was sold.[13] The nickname Packets was also adopted by locomotive drivers, as the first member of the class was named Channel Packet.[13]

Operational details

As the class appeared during the War, there were no heavily laden Continental Boat Trains from Dover and Folkestone, for which they had been designed. They were however used on express trains on the South Western Main Line to Southampton, and Exeter .[6] In August 1945 a series of test runs were made between London Victoria and Dover and from October the class were used on the resumed Continental expresses.[18] The prestigious Bournemouth Belle Pullman train was reinstated in October 1946 and entrusted to the class for the next two decades. However, their heavy axle loading and length meant that they were banned from many areas of the Southern Railway, and later, the British Railways Southern Region network.[6]

Subsequent Modifications

As mentioned, the main production batch of Southern-built locomotives differed from the two prototypes, Channel Packet and Union Castle. The steam-operated firehole door treadle was removed, and a new type of boiler cladding was utilised in response to the worsening supply situation during the Second World War.[26] Modification was also made to the air-smoothed casing surrounding the smokebox after reports were made of drifting smoke obscuring the locomotive crew's vision ahead. Initially, the only form of smoke deflection was a narrow slot in front of the chimney, intended to enable air to lift the smoke when the locomotive was travelling. This proved inadequate because of the relatively soft exhaust blast that came from the multiple-jet blastpipe, which failed to be caught by the air flow.[27] After several trials, the air flow was increased by extending the casing roof over the front of the smokebox to form a cowling whilst side smoke deflector plates were also incorporated into the front of the air-smoothed casing. The latter added to the poor visibility from the footplate and the expedients combined never fully solved the smoke drift problem.[28]

During the brief time they operated under the Southern Railway, further modifications were applied to the class, such as the reduction in boiler pressure to 250 psi (1.72 MPa) and the redesign of the footplate spectacle plates.[29] These are the small windows on the front face of the cab, which were redesigned to a wedge-shaped profile, a feature to be seen on all Bulleid-designed locomotives post-nationalisation.[3] They had been introduced in Britain in 1934 with the Gresley-designed Cock o' the North.[3] Originally, the spectacle plates of the Bulleid Pacifics were at the conventional right-angle to the direction of the locomotive, and offered limited vision ahead along the air-smoothed casing.[30] The Southern-built batches also had variations in the material used for the air-smoothed casing with a change from sheet steel to an asbestos compound, forced upon the manufacturer by wartime expediency.[26] This resulted in several class members having a horizontal strengthening rib running down the length of the casing.[26] The final Southern Railway-initiated experiment involved equipping 21C105 Canadian Pacific with a Berkeley mechanical stoker imported from Canada.[3] Little improvement in performance was seen when trialled under British Railways auspices in 1948 and the locomotive was re-converted to hand-firing.[31]

As mentioned, the British Railways batch had detail differences to previous versions. The most significant modification was the reduction of weight using lighter materials unavailable during wartime. From 1952 the air-smoothed casing ahead of the cylinders was removed to ease maintenance and lubrication.[32] This coincided with the removal of the tender "raves" on all locomotives, as they obstructed the packing of coal into the bunker and restricted the driver's view when reversing the locomotive.[33] The resultant "cut-down" tender included new, enclosed storage for fire-irons, revised step ladders and glass spectacle plates to protect the crew from flying coal dust when running tender-first.[34]

Performance of the unrebuilt locomotives

The new locomotives demonstrated that they could generate enormous power using mediocre quality fuel, due largely to Bulleid's excellent boiler. They also ran very smoothly at high speed.[35] Partly as a result of having so many novel features, the first few years of service by the Merchant Navy class were beset by a variety of technical problems. Some of these were merely teething troubles, but others remained with the class throughout their working lives. These may be summarised as follows:

  • Adhesion problems. The locomotives were often prone to wheelslip, and required very careful driving when starting a heavy train from rest, but once into their stride they were noted for their free running, excellent steam production and being remarkably stable when hauling heavy expresses.[3]
  • Maintenance problems. The chain driven valve gear proved to be expensive to maintain and subject to rapid wear. Leaks from the oil bath onto the wheels caused oil to splash onto the boiler lagging in service.[3] Once saturated with oil, the lagging attracted coal dust and ash which provided a combustible material, and as a result of the heavy braking of the locomotives, sparks would set the lagging on fire underneath the air-smoothed casing.[36] The fires were also attributed to oil overflowing from axlebox lubricators onto the wheels when stationary to be flung upwards into the boiler lagging in service.[37] In either case, the local fire brigade would invariably be called to put the fire out, with cold water coming into contact with the hot boiler, causing stress to the casings. Many photographs show an un-rebuilt with "buckled" (warped) casings, the result of a lagging fire.[13]
  • High fuel consumption this became very apparent in the 1948 Locomotive Exchange Trials and at trials at the Rugby locomotive testing plant in 1952.[38]
  • Restricted driver visibility due to the air-smoothed casing. The exhaust problem was never adequately resolved, and continued to beat down onto the air-smoothed casing when the engine was on the move, obscuring the driver's vision from the cab.[39]

As a result of these problems serious consideration was given to scrapping the class in 1954, and replacing them with Britannia class locomotives.[40] However, the locomotives had excellent boilers and several other good features and so the decision was taken to rebuild them removing several of Bulleid's less successful ideas.

Incident at Crewkerne

On 24 April 1953 the crank axle on the central driving wheel of No. 35020 "Bibby Line" fractured whilst approaching Crewkerne Station at speed.[41] No-one was injured, but the incident resulted in the withdrawal of all Merchant Navy class locomotives from service whilst the cause was ascertained.[42] An examination of other class members showed that the fracture, caused by metal fatigue, was a common fault.[43] To cover the motive power shortage caused by the mass withdrawal of thirty locomotives, classes from other British Railways regions were drafted in to deputise.[44] The incident resulted in a redesign and replacement of the crank axle.[42]

Rebuilding

BR Rebuilt Merchant Navy class[1]
A posed side-and-front view of the rebuilt form of the locomotive, standing in the sidings of a locomotive depot. The locomotive is of conventional appearance, with a visible boiler and no flat covering plates. Smoke deflectors are fitted at the front of the locomotive.
35028 "Clan Line" as rebuilt without the air-smoothed casing and with Walschaert's valve gear
Power type Steam
Designer R. G. Jarvis after Oliver Bulleid
Rebuilder Eastleigh Works
Rebuild date 1956–1960
Number rebuilt 30
Configuration 4-6-2 (Pacific)
Gauge 4 ft 8 12 in (1,435 mm)
Leading wheel
diameter
3 ft 1 in (0.940 m)
Driver diameter 6 ft 2 in (1.880 m)
Trailing wheel
diameter
3 ft 7 in (1.092 m)
Length 71 ft 7 in (21.82 m)
Locomotive weight 97.90 long tons (99.5 t)
Fuel type Coal
Fuel capacity 5 long tons (5.1 t)
Water capacity 6,000 imp gal (27,280 L; 7,210 US gal)
Boiler pressure 250 psi (1.72 MPa)
Firegrate area 48.5 sq ft (4.51 m2)
Cylinders 3
Cylinder size 18 × 24 in (457 × 610 mm)
Tractive effort 33,495 lbf (149.0 kN)
Career Southern Region of British Railways
Class Merchant Navy
Power class 8P
Locale Great Britain

Partially because of the Crewkerne incident, and due to the incessant modification of Bulleid’s original design, British Railways took the decision to rebuild the entire class to a more conventional design by R. G. Jarvis, adopting many features from the BR 'Standard' locomotive classes that had been introduced since 1950.[45] The air-smoothed casing was removed and replaced with conventional boiler cladding, and the chain-driven valve gear was replaced with three separate sets of Walschaerts valve gear.[46] The rebuilts were provided with a completely revised cylindrical smokebox, a new Lord Nelson-type chimney and LMS-style smoke deflectors.[47] Together with the lack of air-smoothed casing, these helped reduce the problem of smoke and steam obscuring the driver's vision of the line.[47]

The fast-moving and unpredictable Bulleid steam reverser was replaced with a screw-link version, whilst the mechanical lubricators were moved to the footplates along the boiler sides.[48] Sanding was also added to the leading driving axle, whilst rearward application was incorporated to the middle driving axle.[49] The first rebuild to be released from Eastleigh was 35018 British India Line in 1956. The final example, 35028 Clan Line, was completed in 1960. The success of the rebuilding programme for the Merchant Navy class was also to influence the design of the future rebuild of 60 Light Pacifics.[50]

Performance of the rebuilt locomotives

There is no doubt that rebuilding the class solved most of the maintenance problems whilst retaining the good features: thereby creating excellent locomotives. However, as a result of the implementation of Walschaerts valve gear, the rebuilts were prone to hammerblow on the track caused by the additional weights incorporated to balance the outside valve gear, an issue that had not arisen with the self-balanced arrangement of the original locomotives.[13] On 26 June 1967, 35003 Royal Mail recorded the highest speed ever for the class. Hauling a train comprising three carriages and two parcels vans (164 tons tare, 180 tons gross) between Weymouth and Waterloo, the mile between milepost 38 and milepost 37 (located between Winchfield and Fleet) was covered in 34 seconds, a speed of 105.88 mph. This was also the last authenticated speed in excess of 100mph achieved by a steam locomotive in the United Kingdom.[51]

Withdrawal

The electrification of the Chatham Main Line to Dover in 1959 deprived the class of much of their work, although they continued to be used on the South Western Main Line to Southampton and Bournemouth until 1967. However, the main reason why the class began to be withdrawn in 1964 was due to the transfer of the main line between Salisbury and Exeter to the Western Region and the introduction of "Warship" class diesel-hydraulic locomotives on these services. The rebuilt locomotives were therefore withdrawn relatively soon after their rebuilding, whilst still in excellent condition. The first two to be withdrawn were the second prototype 35002 Union Castle and 35014 Rotterdam Lloyd in February 1964.[3] Nearly half of the class had been withdrawn by the end of 1965, but seven survived until the end of steam on the Southern Region in the summer of 1967.[52]

Preservation

Many of the class have survived into preservation thanks to the high workload of Woodham Brothers scrapyard in Barry, Vale of Glamorgan, South Wales, which found it easier and more commercially lucrative to scrap railway wagons, keeping the more technical steam locomotives for a down turn in workload.

One engine, 35028 Clan Line, was bought by the Merchant Navy Locomotive Preservation Society direct from British Railways in 1967, and has since been regarded as the 'flagship' of the class.[13] Although eleven members of the class have survived into the preservation era, it is very likely that many will never steam again, with only three having been restored to working order thus far.[53] This is because the class is too large and heavy for use on most of today's heritage railways. As the entire class was rebuilt from 1956 onwards, no Merchant Navy class locomotives exist in as-built condition, although there are frequent debates within the heritage sector regarding reverse-engineering one of the not-yet-restored examples to original condition.[53] Other relics of the class have survived in the guise of locomotive nameplates and smokebox number plates, which were taken from their locomotives towards the end of steam on the British Railways Southern Region in the 1960s. As a result many exist in private collections, and several have been seen at auction, selling for several thousands of pounds.[54]

Preserved Merchant Navy class locomotives

For location details and current status of the preserved locomotives, see: List of SR Merchant Navy class locomotives

Livery

A front-and-side view of a Merchant Navy locomotive in near-scrapyard condition before restoration starts. Many important components are missing, such as the valve gear, the smoke deflectors and the tender.
Number 35010 Blue Star on static display awaiting restoration at the Colne Valley Railway

Southern Railway

Livery was Southern Railway malachite green with "sunshine yellow" horizontal lining and lettering.[3] The first five locomotives were given a matt finish so as to obscure small irregularities in the casing.[55] All class members that operated during the Second World War were eventually repainted in Southern Railway wartime black livery, with green-shaded "Sunshine" lettering.[3] However, this was reverted back to Malachite Green livery upon the ending of hostilities.

21C1 Channel Packet originally had an inverted horseshoe on the smokebox door, indicating its Southern origin, however, crews believed this to be unlucky.[3] A resultant re-design meant that this became a roundel, the gap being filled by the year of construction, therefore acting as a builder's plate.[3] The background was painted red. Early members of the class had cast iron numberplates and gilt 'Southern' plates on the tender, however these were subsequently replaced by transfers.[3]

British Railways

After nationalisation in 1948, the locomotives' initial livery was a slightly modified Southern malachite green livery, where "British Railways" replaced "Southern" in Sunshine Yellow lettering on the tender sides. The Bulleid numbering system was temporarily retained, with an additional "S" prefix, such as S21C1.[3] A short-lived second livery was an experimental blue with red lining as applied to 35024 East Asiatic Company. This was replaced by British Railways express passenger blue with black and white lining. From 1952 the locomotives carried the standard British Railways Brunswick green livery with orange and black lining and the British Railways crest on the tender tank sides. This livery was perpetuated after rebuilding.[21]

Operational assessment

The class in both as-built and rebuilt forms have been subject to a range of divergent opinions. The utilisation of welded steel construction and the various innovations that had not previously been seen in British locomotive design meant that the class earned Bulleid the title "Last Giant of Steam".[19] The constant concern for ease of maintenance and utility had not previously been seen on locomotives of older design, whilst their highly efficient boilers represented the ultimate in British steam technology, the hallmark of a successful locomotive design.[31] Despite this, the number of innovations introduced at the same time made the class unreliable and difficult to maintain during the first few years of service. Many of these difficulties were overcome during the rebuilding, leading to D.L. Bradley's statement that the rebuilt locomotives were "the finest express locomotives to work in the country".[56] Overall the class was largely successful, with half of the locomotives completing more than 1 million miles in revenue earning service.[57]

Models

The Merchant Navy class has been the subject of several models by different manufacturers, including Hornby Railways, Graham Farish and Minitrix.[58] The first OO gauge model of an as-built locomotive was produced by Hornby/Wrenn in 1962, followed by the rebuilt version.[59]

Hornby and Graham Farish currently produce the rebuilt version of the class in OO gauge and N gauge respectively. The Hornby model was introduced in the 2000 edition of the Hornby catalogue.[60] As of December 2010, fifteen members of the class have been produced.[61]

See also

P train.svg Trains portal

References

Notes

  1. ^ a b Harvey (2004)
  2. ^ Arlett (1989), pp. 29–30
  3. ^ a b c d e f g h i j k l m n o p q r s t u Bulleids in Retrospect
  4. ^ Burridge (1975), p. 60
  5. ^ Whitehouse & Thomas, p. 49
  6. ^ a b c d Whitehouse & Thomas, p. 59
  7. ^ a b c d e f g h i Bradley (1976), p. 3-52.
  8. ^ Bulleid (1977), pp. 52–53
  9. ^ Harvey (2004), pp. 6–9
  10. ^ a b Creer & Morrison (2001), p. 7
  11. ^ Bradley (1976) p.4
  12. ^ Chain-driven valve gear diagram, retrieved April 13, 2007 Archived December 30, 2006 at the Wayback Machine
  13. ^ a b c d e f g h i Herring (2000), pp. 156–157
  14. ^ a b c d e f Bradley (1976), p. 8
  15. ^ a b c d e f g h i Bradley (1976), p. 9
  16. ^ Bradley (1976), p. 10
  17. ^ Creer & Morrison (2001), p. 21
  18. ^ a b Bradley (1976), p.19
  19. ^ a b Day-Lewis (1964), pp. 149-150
  20. ^ Harvey (2004), p. 33
  21. ^ a b c Harvey (2004), pp. 46–50
  22. ^ a b c Bradley (1976), p. 22
  23. ^ Ian Allan Abc 1958–59 "MN"
  24. ^ a b c Burridge (1975), p. 61
  25. ^ Southern E-Group (2004) Bulleid MN "Merchant Navy" Class 4-6-2, Retrieved April. 16, 2007. For details of the naming process.
  26. ^ a b c Harvey (2004), p. 21
  27. ^ Harvey (2004), p. 25
  28. ^ Harvey (2004), p. 40
  29. ^ Whitehouse & Thomas, p. 61
  30. ^ Creer & Morrison (2001), pp. 40–41
  31. ^ a b Whitehouse & Thomas, p. 47
  32. ^ Harvey (2004), p. 50
  33. ^ Southern E-Group (2008) Removal of raves, retrieved September 14, 2009
  34. ^ Southern E-Group (2008) Tender modifications, retrieved September 14, 2009
  35. ^ Bradley (1976), pp. 11-14
  36. ^ Southern E-Group (2004) Bulleid MN "Merchant Navy" Class 4-6-2: Notes from a Bulleid Fundamentalist, Retrieved April 16, 2007. For details on the lagging fires which were common on both Merchant Navys and Light Pacifics.
  37. ^ Southern E-Group (2004) Bulleid MN "Merchant Navy" Class 4-6-2: Notes from a Bulleid Fundamentalist, Retrieved August 25, 2010. For the cause of the lagging fires which were common on both Merchant Navys and Light Pacifics.
  38. ^ Bradley (1976), pp. 31-35
  39. ^ Creer & Morrison (2001), p. 13
  40. ^ Bradley (1976), p. 38
  41. ^ Leigh (1993), p. 6
  42. ^ a b Leigh (1993), p. 9
  43. ^ Leigh (1993), p. 8
  44. ^ Leigh and Strange (1993), p. 13
  45. ^ Southern E-Group (2004) Rebuilt Bulleid MN "Merchant Navy" Class 4-6-2, Retrieved April 16, 2007. For more pictures of the rebuilt locomotives.
  46. ^ Creer & Morrison (2001), p. 94
  47. ^ a b Creer & Morrison (2001), pp. 74–75
  48. ^ Bradley (1976), p.41
  49. ^ Bradley (1976), p.42
  50. ^ Creer & Morrison (2001), p. 96
  51. ^ Streeter, Tony. "The last 'proper' 100... by a doomed locomotive". Steam Railway (Bauer Media) (No.388, 29 April - 26 May 2011). ISSN 0143-7232. OCLC 63292071. 
  52. ^ Hicks (2007), pp. 57–61
  53. ^ a b Langston (2008), p. 112
  54. ^ "The Railway Magazine" (2007), p.25
  55. ^ Mannion (1998), p. 72
  56. ^ Bradley (1976), p. 44
  57. ^ Bradley (1976), p.53
  58. ^ John Russell (2003) N Gauge RTR Steam Locos, Retrieved December 15, 2010. For manufacturer details.
  59. ^ John Russell (2003) 00 Gauge RTR Steam Locos, Retrieved December 15, 2010. For details of the earlier releases.
  60. ^ Southern E-Group (2009) Hornby's Modified Merchant Navy Class loco, Retrieved December 15, 2010. For details of the Hornby model.
  61. ^ Southern E-Group (2009) Hornby's Modified Merchant Navy Class loco, Retrieved December 15, 2010. For details of the Hornby model.

Bibliography

  • Arlett, Mike: The Train Now Departing: Personal memories of the last days of steam (London: BBC Books, 1989) ISBN 0563206969
  • Bradley, D.L. : Locomotives of the Southern Railway. Part 2 (London: Railway correspondence and Travel Society, 1976) ISBN 0901115312
  • Bulleid, H. A. V.: Bulleid of the Southern (Hinckley: Ian Allan Publishing, 1977) ISBN 0-7110-0689-X
  • Bulleids in Retrospect, Transport Video Publishing, Wheathampstead, Hertfordshire
  • Burridge, Frank: Nameplates of the Big Four (Oxford Publishing Company: Oxford, 1975) ISBN 0-90288-843-9
  • Creer, S & Morrison, B: The Power of the Bulleid Pacifics (Oxford Publishing Company: Oxford, 2001) ISBN 0860930823
  • Day-Lewis, S: Bulleid, Last Giant of Steam (London: George Allen & Unwin, 1964)
  • Harvey, R. J.: Bulleid 4-6-2 Merchant Navy Class (Locomotives in Detail series volume 1) (Hinckley: Ian Allan Publishing, 2004), ISBN 0711030138
  • Herring, Peter: Classic British Steam Locomotives (Abbeydale Press: London, 2000) Section "Merchant Navy Class" ISBN 1-86147-057-6
  • Hicks, Bryan: 'A Southern Calling' Part Two (Steam World: 244, October 2007)
  • Langston, Keith: British Steam Preserved: Illustrated Comprehensive Listing of Ex-British Railways Steam Locomotives (Horncastle: Morton's Media Group Ltd., 2008)
  • Leigh, Chris: 'Crisis on the Southern: behind the scenes' (Steam World: 71, May 1993)
  • Leigh, Chris and Strange, Richard: 'Crisis on the Southern; from the lineside' (Steam World: 71, May 1993)
  • Ian Allan ABC of British Railways Locomotives, winter 1958–59 edition
  • Mannion, Roger J. The Southern Pacifics (Sutton Publishing: Stroud, 1998) ISBN 0750917342
  • Leigh, Chris: Crisis on the Southern: behind the scenes (Steam World, 1993 (71)), pp. 6–9.
  • Leigh, Chris and Strange, Richard: Crisis on the Southern: from the lineside (Steam World, 1993 (71)), pp. 10–13.
  • The Railway Magazine (January, 2007)
  • Whitehouse, Patrick & Thomas, David St.John: SR 150: A Century and a Half of the Southern Railway (Newton Abbot: David and Charles, 2002)

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужно сделать НИР?

Look at other dictionaries:

  • SR Merchant Navy Class — Infobox Locomotive powertype=Steam name = SR Merchant Navy ClassHarvey] caption = Official Southern Railway photograph of 21C1 Channel Packet as built, 1941. designer = Oliver Bulleid builder = SR Eastleigh Works builddate = 1941 ndash;1949… …   Wikipedia

  • List of SR Merchant Navy Class locomotives — The SR Merchant Navy Class is a type of steam locomotive, designed by Oliver Bulleid, that ran on the British Southern Railway network. The following table sets out the names, numbers and other vital statistics of the locomotives that comprised… …   Wikipedia

  • SR Merchant Navy Class 35009 Shaw Savill — Shaw Savill (left) with Battle of Britain class 249 Squadron (right) at Woodham s Scrapyard, Barry in 1984 …   Wikipedia

  • SR Merchant Navy Class 35006 Peninsular & Oriental S. N. Co. — 35006 Peninsular Oriental S. N. Co. is a Southern Railway rebuilt Merchant Navy Class 4 6 2 steam locomotive. 35006 was built at Eastleigh locomotive works in December 1941 and given the Southern Railway number 21C6. Built as part of the war… …   Wikipedia

  • SR Merchant Navy Class 35027 Port Line — 35027 Port Line was one of a batch of ten SR Merchant Navy Class steam locomotives built by the Southern Region of British Railways between 1948 and 1949. Completed at Eastleigh Works in December 1948, she was named on 24 April 1950 in… …   Wikipedia

  • SR Merchant Navy Class 35028 Clan Line — Clan Line 35028 is a Southern Railway rebuilt Merchant Navy 4 6 2 class locomotive. 35028 was built at Eastleigh locomotive works in 1948. After a few weeks running in she was allocated to first to Dover then to Stewarts Lane shed in London where …   Wikipedia

  • Merchant Navy (United Kingdom) — For the steam locomotives, see SR Merchant Navy Class. Badge of the British Merchant Navy …   Wikipedia

  • Equivalent Royal Navy ranks in the Merchant Navy — Merchant Navy of the United Kingdom …   Wikipedia

  • Nigerian Merchant Navy — The Nigerian Merchant Navy (NMN) consists of ships, their crew and supporting organizations owned by Nigerians and engaged in cabotage and international trade with Nigeria. The name has also been used by private organizations seeking roles in… …   Wikipedia

  • Navy League of Canada — Active Country Canada Type Youth Organization Part of Navy League Cadet programme Headquarters …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”