- National Interest Electric Transmission Corridor
-
"National corridor" redirects here. For National Heritage Corridors, see U.S. National Heritage Area.
Contents
A National Interest Electric Transmission Corridor (NIETC) corridor is a geographic region designated by the United States Department of Energy where electricity transmission limitations are adversely affecting American citizens. In 2005 the United States Congress granted the Department of Energy the authority to create these regions in an effort to speed the creation of more transmission capacity. Should state and local governments fail to issue permits allowing construction of new transmission, the Energy Policy Act of 2005 gives the Federal Energy Regulatory Commission (FERC) the authority to issue a federal permit empowering a project director to exercise the right of eminent domain to purchase property needed to complete the project[1].
Background
In the United States, electricity generation is growing 4 times faster than transmission, and energy sources that would make the U.S. more energy independent cannot be built because there is no transmission capacity to carry the power to consumers. Because United States energy independence is a national priority, this problem has attracted considerable federal attention.
Historically, local governments have exercised authority over the electricity grid and have little incentive to take action that would benefit other states, but not their own. States with cheap electricity have a disincentive to make interstate commerce in electricity easier, since other states will be able to compete for local energy and drive up rates. Further, vocal local constituencies can block or slow permitting by pointing to visual impact, environmental, and perceived health concerns.
Large transmission upgrades require coordination of multiple states, a multitude of interlocking permits, and a significant portion of the 500 companies that own the grid. From a policy perspective, the control of the grid is balkanized, and the former Energy secretary Bill Richardson refers to it as a "third world grid". To address to the U.S. national security interest in significantly growing transmission capacity, the 2005 energy act gave the Department of Energy the authority to approve transmission if states refuse to act. However, soon after using its power to designate two national corridors, 14 senators signed a letter stating the DOE was being too aggressive[2]
Corridor designations of 2007
In 2007, the DOE designated two corridors, the Mid-Atlantic Area national corridor, and the Southwest Area corridor. Using a source-and-sink approach, the DOE determined areas of significant transmission network congestion and electricity demand (sink), then examined likely areas of nearby generation (source). The possible paths between these sources and sinks defined the highest priority regions where transmission lines need to be built. In designating an NIETC corridor, the DOE does not specify preferred routes for projects, just the general region where such projects are eligible for federal permits. Further, DOE did not exclude federal or state lands from the regions since right of eminent domain by a FERC permit would not apply to them. Although Congress did not specify that national corridors expire, the Secretary of Energy set a limit of 12 years for the Southwest and Mid-Atlantic corridors, subject to revision at any time after giving notice and opportunity for public comment.[1]
FERC permit for a project
Specific routes for specific projects will rely on state siting authorities or possibly FERC should a federal permit be issued. FERC may issue a permit only if the project organizer can show that their proposal will significantly reduce a transmission constraint in the national corridor. According to the DOE, NIETC permit process should not disrupt siting activities of state authorities, and will investigate allegations that an applicant has acted in bad faith in state proceedings.
When a specific route is chosen for a project, FERC will conduct an environmental impact statement (EIS) prior to groundbreaking. DOE did not conduct an EIS for either NIETC region arguing that the designation does not authorize any specific projects or routes.[1]
See also
- Electricity transmission corridor
- Electric power transmission
- Super grid
- Unified Smart Grid
References
- ^ a b c (pdf) National Electric Transmission Congestion Report and Final National Corridor Designations: Frequently Asked Questions. United States Department of Energy. 2007-10-02. http://www.bsecenergy.ro/prezentari/Energy%20Policies%20and%20Strategies/Sergey%20Kouzmin/IPSUPS-UCTE.pdf. Retrieved 2008-12-14. Lay summary.
- ^ [|Wald, Matthew] (2008-08-27). Wind Energy Bumps Into Power Grid’s Limits. New York Times. p. A1. http://www.nytimes.com/2008/08/27/business/27grid.html?_r=2&ref=business&oref=slogin. Retrieved 2008-12-12.
Modernizing the Electrical grid Proposals EU: SuperSmart Grid · Smartgrids Technology Platform · USA: Unified Smart Grid · Pickens plan super grid · ElectranetEfficient energy use Challenge: Intermittency Sources: Ocean · Solar · Wind · Micro hydro · Solutions: Super grid · Grid storage · Vehicle-to-grid · Distributed generationOther technologies/
concepts:HVDC bulk transmission · FACTS · Power line communication · Phasor measurement unit · Load following · Load control · Peak demandPolicies Related Issues Energy security · Climate change · United States energy independence · Peak oil · Energy crisis · Renewable energy commercialization · Rural electrificationElectricity generation Concepts Availability factor · Baseload · Black start · Capacity factor · Demand factor · Demand management · EROEI · Grid storage · Intermittency · Load following · Nameplate capacity · Peak demand · Repowering · Spark spreadSources Technology Distribution Policies Carbon offset · Coal phase out · Ecotax · Energy subsidies · Feed-in tariff · Net metering · Pigovian tax · Renewable Energy Certificates · Renewable energy payments · Renewable energy policyCategories: Electric power distribution · Electricity economics · Power station technology · Portals: Energy · Sustainable developmentCategories:- Electric power transmission systems in the United States
- United States Department of Energy
Wikimedia Foundation. 2010.