Agile software development

Agile software development
Agile software development poster

Agile software development is a group of software development methodologies based on iterative and incremental development, where requirements and solutions evolve through collaboration between self-organizing, cross-functional teams. It promotes adaptive planning, evolutionary development and delivery, a time-boxed iterative approach, and encourages rapid and flexible response to change. It is a conceptual framework that promotes foreseen interactions throughout the development cycle. The Agile Manifesto[1] introduced the term in 2001.

Contents

History

Predecessors

Martin Fowler, widely recognized as one of the key founders of Agile methods

Incremental software development methods have been traced back to 1957.[2] In 1974, a paper by E. A. Edmonds introduced an adaptive software development process.[3]

So-called lightweight software development methods evolved in the mid-1990s as a reaction against heavyweight methods, which were characterized by their critics as a heavily regulated, regimented, micromanaged, waterfall model of development. Proponents of lightweight methods (and now agile methods) contend that they are a return to development practices from early in the history of software development.[2]

Early implementations of lightweight methods include Scrum (1995), Crystal Clear, Extreme Programming (1996), Adaptive Software Development, Feature Driven Development, and Dynamic Systems Development Method (DSDM) (1995). These are now typically referred to as agile methodologies, after the Agile Manifesto published in 2001.[4]

Agile Manifesto

In February 2001, 17 software developers[5] met at the Snowbird, Utah resort, to discuss lightweight development methods. They published the Manifesto for Agile Software Development[1] to define the approach now known as agile software development. Some of the manifesto's authors formed the Agile Alliance, a nonprofit organization that promotes software development according to the manifesto's principles.

The Agile Manifesto reads, in its entirety, as follows:[1]

We are uncovering better ways of developing software by doing it and helping others do it. Through this work we have come to value:

Individuals and interactions over processes and tools
Working software over comprehensive documentation
Customer collaboration over contract negotiation
Responding to change over following a plan
That is, while there is value in the items on the right, we value the items on the left more.

The meanings of the manifesto items on the left within the agile software development context are described below.

Individuals and Interactions – in agile development, self-organization and motivation are important, as are interactions like co-location and pair programming.
Working software – working software will be more useful and welcome than just presenting documents to clients in meetings.
Customer collaboration – requirements cannot be fully collected at the beginning of the software development cycle, therefore continuous customer or stakeholder involvement is very important.
Responding to change – agile development is focused on quick responses to change and continuous development.[6]

Twelve principles underlie the Agile Manifesto, including:[7]

  • Customer satisfaction by rapid delivery of useful software
  • Welcome changing requirements, even late in development
  • Working software is delivered frequently (weeks rather than months)
  • Working software is the principal measure of progress
  • Sustainable development, able to maintain a constant pace
  • Close, daily co-operation between business people and developers
  • Face-to-face conversation is the best form of communication (co-location)
  • Projects are built around motivated individuals, who should be trusted
  • Continuous attention to technical excellence and good design
  • Simplicity
  • Self-organizing teams
  • Regular adaptation to changing circumstances

In 2005, a group headed by Alistair Cockburn and Jim Highsmith wrote an addendum of project management principles, the Declaration of Interdependence,[8] to guide software project management according to agile development methods.

Characteristics

Pair programming, an XP development technique used by agile

There are many specific agile development methods. Most promote development, teamwork, collaboration, and process adaptability throughout the life-cycle of the project.

Agile methods break tasks into small increments with minimal planning and do not directly involve long-term planning. Iterations are short time frames (timeboxes) that typically last from one to four weeks. Each iteration involves a team working through a full software development cycle, including planning, requirements analysis, design, coding, unit testing, and acceptance testing when a working product is demonstrated to stakeholders. This minimizes overall risk and allows the project to adapt to changes quickly. Stakeholders produce documentation as required. An iteration might not add enough functionality to warrant a market release, but the goal is to have an available release (with minimal bugs) at the end of each iteration.[9] Multiple iterations might be required to release a product or new features.

Team composition in an agile project is usually cross-functional and self-organizing, without consideration for any existing corporate hierarchy or the corporate roles of team members. Team members normally take responsibility for tasks that deliver the functionality an iteration requires. They decide individually how to meet an iteration's requirements.

Agile methods emphasize face-to-face communication over written documents when the team is all in the same location. Most agile teams work in a single open office (called a bullpen), which facilitates such communication. Team size is typically small (5-9 people) to simplify team communication and team collaboration. Larger development efforts can be delivered by multiple teams working toward a common goal or on different parts of an effort. This might require a coordination of priorities across teams. When a team works in different locations, they maintain daily contact through videoconferencing, voice, e-mail, etc.

No matter what development disciplines are required, each agile team will contain a customer representative. This person is appointed by stakeholders to act on their behalf[10] and makes a personal commitment to being available for developers to answer mid-iteration problem-domain questions. At the end of each iteration, stakeholders and the customer representative review progress and re-evaluate priorities with a view to optimizing the return on investment (ROI) and ensuring alignment with customer needs and company goals.

Most agile implementations use a routine and formal daily face-to-face communication among team members. This specifically includes the customer representative and any interested stakeholders as observers. In a brief session, team members report to each other what they did the previous day, what they intend to do today, and what their roadblocks are. This face-to-face communication exposes problems as they arise.

Agile development emphasizes working software as the primary measure of progress. This, combined with the preference for face-to-face communication, produces less written documentation than other methods. The agile method encourages stakeholders to prioritize "wants" with other iteration outcomes, based exclusively on business value perceived at the beginning of the iteration (also known as value-driven).[11]

Specific tools and techniques, such as continuous integration, automated or xUnit test, pair programming, test-driven development, design patterns, domain-driven design, code refactoring and other techniques are often used to improve quality and enhance project agility.

The Four Phases of Traditional Software Development

Unlike the agile software development model, the traditional waterfall model of software design contains four distinct phases.

  1. Business requirements. The first step in the traditional software development process is to identify business requirements as well as the scope of the release. It encompasses those tasks that go into determining the needs or conditions to meet for a new or altered product, taking account of the possibly conflicting requirements of the various stakeholders, such as beneficiaries or users.
  2. Architecture and design. The goal of the architecture and design phase is to try to identify an architecture that has a good chance of working. The architecture is often defined using free-form diagrams which explore the technical infrastructure, and the major business entities and their relationships. The design is derived in a modeling session, in which issues are explored, until the team is satisfied that they understand what needs to be delivered.
  3. Development. The development phase produces code in an environment that is specific to the culture of the development team and the skills of the individuals. In large projects the tasks are structured and distributed to teams. In small projects, or within smaller teams, the tasks are distributed according to team culture and skills. Development continues until goals or milestones are reached.
  4. Testing, delivery, and feedback. Testing is ongoing at the local level and becomes more structured on larger scales and as the project approaches delivery. In large projects, the testing is formalized. The customer is engaged in testing and feedback cycles when the development teams are relatively convinced that the software meets the requirements.

One of the similarities of the agile and traditional methods is to conduct the testing of the software as it is being developed. The unit testing is performed from the developer’s perspective. and the acceptance testing is conducted from the customer’s perspective. The key difference is that in the agile method, the customer and developers are in close communication, whereas in the traditional method, the customer is initially represented by the requirement and design documents.

Comparison with other methods

Agile methods are sometimes characterized as being at the opposite end of the spectrum from plan-driven or disciplined methods. Agile teams may, however, employ highly disciplined formal methods.[12] A more accurate distinction is that methods exist on a continuum from adaptive to predictive.[13] Agile methods lie on the adaptive side of this continuum. Adaptive methods focus on adapting quickly to changing realities. When the needs of a project change, an adaptive team changes as well. An adaptive team will have difficulty describing exactly what will happen in the future. The further away a date is, the more vague an adaptive method will be about what will happen on that date. An adaptive team cannot report exactly what tasks are being done next week, but only which features are planned for next month. When asked about a release six months from now, an adaptive team might be able to report only the mission statement for the release or a statement of expected value vs. cost.

Predictive methods, in contrast, focus on planning the future in detail. A predictive team can report exactly what features and tasks are planned for the entire length of the development process. Predictive teams have difficulty changing direction. The plan is typically optimized for the original destination and changing direction can require completed work to be started over. Predictive teams will often institute a change control board to ensure that only the most valuable changes are considered.

Formal methods, in contrast to adaptive and predictive methods, focus on computer science theory with a wide array of types of provers. A formal method attempts to prove the absence of errors with some level of determinism. Some formal methods are based on model checking and provide counter examples for code that cannot be proven. Generally, mathematical models (often supported through special languages - see SPIN model checker) map to assertions about requirements. Formal methods are dependent on a tool-driven approach and can be combined with other development approaches. Some provers do not easily scale. Like agile methods, manifestos relevant to high-integrity software have been proposed in Crosstalk.

Agile methods have much in common with the Rapid Application Development techniques from the 1980/90s as espoused by James Martin and others.[citation needed] In addition to technology-focused methods, customer- and design-centered methods, such as Visualization-Driven Rapid Prototyping developed by Brian Willison, work to engage customers and end users to facilitate agile software development.[citation needed]

Agile methods

Well-known agile software development methods include:

Method tailoring

In the literature, different terms refer to the notion of method adaptation, including ‘method tailoring’, ‘method fragment adaptation’ and ‘situational method engineering’. Method tailoring is defined as:

A process or capability in which human agents through responsive changes in, and dynamic interplays between contexts, intentions, and method fragments determine a system development approach for a specific project situation.[14]

Potentially, almost all agile methods are suitable for method tailoring. Even the DSDM method is being used for this purpose and has been successfully tailored in a CMM context.[15] Situation-appropriateness can be considered as a distinguishing characteristic between agile methods and traditional software development methods, with the latter being relatively much more rigid and prescriptive. The practical implication is that agile methods allow project teams to adapt working practices according to the needs of individual projects. Practices are concrete activities and products that are part of a method framework. At a more extreme level, the philosophy behind the method, consisting of a number of principles, could be adapted (Aydin, 2004).[14]

Extreme Programming (XP) makes the need for method adaptation explicit. One of the fundamental ideas of XP is that no one process fits every project, but rather that practices should be tailored to the needs of individual projects. Partial adoption of XP practices, as suggested by Beck, has been reported on several occasions.[16] A tailoring practice is proposed by Mehdi Mirakhorli which provides sufficient roadmap and guideline for adapting all the practices. RDP Practice is designed for customizing XP. This practice, first proposed as a long research paper in the APSO workshop at the ICSE 2008 conference, is currently the only proposed and applicable method for customizing XP. Although it is specifically a solution for XP, this practice has the capability of extending to other methodologies. At first glance, this practice seems to be in the category of static method adaptation but experiences with RDP Practice says that it can be treated like dynamic method adaptation. The distinction between static method adaptation and dynamic method adaptation is subtle.[17] The key assumption behind static method adaptation is that the project context is given at the start of a project and remains fixed during project execution. The result is a static definition of the project context. Given such a definition, route maps can be used in order to determine which structured method fragments should be used for that particular project, based on predefined sets of criteria. Dynamic method adaptation, in contrast, assumes that projects are situated in an emergent context. An emergent context implies that a project has to deal with emergent factors that affect relevant conditions but are not predictable. This also means that a project context is not fixed, but changing during project execution. In such a case prescriptive route maps are not appropriate. The practical implication of dynamic method adaptation is that project managers often have to modify structured fragments or even innovate new fragments, during the execution of a project (Aydin et al., 2005).[17]

Software development life cycle

Software development life-cycle support[16]

The agile methods are focused on different aspects of the software development life cycle. Some focus on the practices (extreme programming, pragmatic programming, agile modeling), while others focus on managing the software projects (the scrum approach). Yet, there are approaches providing full coverage over the development life cycle (dynamic systems development method, or DSDM, and the IBM Rational Unified Process, or RUP), while most of them are suitable from the requirements specification phase on (feature-driven development, or FDD, for example). Thus, there is a clear difference between the various agile software development methods in this regard. Whereas DSDM and RUP do not need complementing approaches to support software development, the others do to a varying degree. DSDM can be used by anyone (although only DSDM members can offer DSDM products or services). RUP, then, is a commercially sold development environment (Abrahamsson, Salo, Rankainen, & Warsta, 2002). [16]

Measuring agility

While agility can be seen as a means to an end, a number of approaches have been proposed to quantify agility. Agility Index Measurements (AIM)[18] score projects against a number of agility factors to achieve a total. The similarly named Agility Measurement Index,[19] scores developments against five dimensions of a software project (duration, risk, novelty, effort, and interaction). Other techniques are based on measurable goals.[20] Another study using fuzzy mathematics[21] has suggested that project velocity can be used as a metric of agility. There are agile self-assessments to determine whether a team is using agile practices (Nokia test,[22] Karlskrona test,[23] 42 points test[24]).

While such approaches have been proposed to measure agility, the practical application of such metrics has yet to be seen.

Historically, there is a lack of data on agile projects that failed to produce good results. Studies can be found that report poor projects due to a deficient implementation of an agile method, or methods, but none where it was felt that they were executed properly and failed to deliver on its promise. "This may be a result of a reluctance to publish papers on unsuccessful projects, or it may in fact be an indication that, when implemented correctly, Agile Methods work." [25] However, there is agile software development ROI data available from the DACS ROI Dashboard. [26]

Experience and reception

One of the early studies reporting gains in quality, productivity, and business satisfaction by using Agile methods was a survey conducted by Shine Technologies from November 2002 to January 2003.[27] A similar survey conducted in 2006 by Scott Ambler, the Practice Leader for Agile Development with IBM Rational's Methods Group reported similar benefits.[28] In a survey conducted by VersionOne (a provider of software for planning and tracking agile software development projects) in 2008, 55% of respondents answered that agile methods had been successful in 90-100% of cases.[29] Others claim that agile development methods are still too young to require extensive academic proof of their success.[30]

Suitability

Large-scale agile software development remains an active research area.[31][32]

Agile development has been widely seen as being more suitable for certain types of environment, including small teams of experts.[33][34]:157

Some things that may negatively impact the success of an agile project are:

  • Large-scale development efforts (>20 developers), through scaling strategies[32] and evidence of some large projects[35] have been described.
  • Distributed development efforts (non-colocated teams). Strategies have been described in Bridging the Distance[36] and Using an Agile Software Process with Offshore Development[37]
  • Forcing an agile process on a development team[38]
  • Mission-critical systems where failure is not an option at any cost (e.g. software for surgical procedures).

The early successes, challenges and limitations encountered in the adoption of agile methods in a large organization have been documented.[39]

In terms of outsourcing agile development, Michael Hackett, Sr. Vice President of LogiGear Corporation has stated that "the offshore team ... should have expertise, experience, good communication skills, inter-cultural understanding, trust and understanding between members and groups and with each other."[40]

Risk analysis can also be used to choose between adaptive (agile or value-driven) and predictive (plan-driven) methods.[11]. Barry Boehm and Richard Turner suggest that each side of the continuum has its own home ground, as follows:[33]

Suitability of different development methods
Agile home ground Plan-driven home ground Formal methods
Low criticality High criticality Extreme criticality
Senior developers Junior developers Senior developers
Requirements change often Requirements do not change often Limited requirements, limited features see Wirth's law
Small number of developers Large number of developers Requirements that can be modeled
Culture that thrives on chaos Culture that demands order Extreme quality

See also

References

  1. ^ a b c Beck, Kent; et al. (2001). "Manifesto for Agile Software Development". Agile Alliance. http://agilemanifesto.org/. Retrieved 2010-06-14. 
  2. ^ a b Gerald M. Weinberg, as quoted in Larman, Craig; Basili, Victor R. (June 2003). "Iterative and Incremental Development: A Brief History". Computer 36 (6): 47–56. doi:10.1109/MC.2003.1204375. ISSN 0018-9162. "We were doing incremental development as early as 1957, in Los Angeles, under the direction of Bernie Dimsdale [at IBM's ServiceBureau Corporation]. He was a colleague of John von Neumann, so perhaps he learned it there, or assumed it as totally natural. I do remember Herb Jacobs (primarily, though we all participated) developing a large simulation for Motorola, where the technique used was, as far as I can tell .... All of us, as far as I can remember, thought waterfalling of a huge project was rather stupid, or at least ignorant of the realities. I think what the waterfall description did for us was make us realize that we were doing something else, something unnamed except for 'software development.'" 
  3. ^ Edmonds, E. A. (1974). "A Process for the Development of Software for Nontechnical Users as an Adaptive System". General Systems 19: 215–18. 
  4. ^ Larman, Craig (2004). Agile and Iterative Development: A Manager's Guide. Addison-Wesley. p. 27. ISBN 978-0-13-111155-4 
  5. ^ Kent Beck, Mike Beedle, Arie van Bennekum, Alistair Cockburn, Ward Cunningham, Martin Fowler, James Grenning, Jim Highsmith, Andrew Hunt, Ron Jeffries, Jon Kern, Brian Marick, Robert C. Martin, Stephen J. Mellor, Ken Schwaber, Jeff Sutherland, and Dave Thomas
  6. ^ Ambler, S.W. "Examining the Agile Manifesto". Retrieved 6 April 2011.
  7. ^ Beck, Kent; et al. (2001). "Principles behind the Agile Manifesto". Agile Alliance. http://www.agilemanifesto.org/principles.html. Retrieved 2010-06-06. 
  8. ^ Anderson, David (2005). "Declaration of Interdependence". http://pmdoi.org. 
  9. ^ Beck, Kent (1999). "Embracing Change with Extreme Programming". Computer 32 (10): 70–77. doi:10.1109/2.796139. 
  10. ^ Gauthier, Alexandre (August 17th, 2011). "What is scrum". Planbox. http://www.planbox.com/resources/agile-artifacts#roles. 
  11. ^ a b Sliger, Michele; Broderick, Stacia (2008). The Software Project Manager's Bridge to Agility. Addison-Wesley. p. 46. ISBN 0321502752. 
  12. ^ Black, S. E.; Boca., P. P.; Bowen, J. P.; Gorman, J.; Hinchey, M. G. (September 2009). "Formal versus agile: Survival of the fittest". IEEE Computer 49 (9): 39–45. 
  13. ^ Boehm, B.; R. Turner (2004). Balancing Agility and Discipline: A Guide for the Perplexed. Boston, MA: Addison-Wesley. ISBN 0-321-18612-5.  Appendix A, pages 165-194
  14. ^ a b Aydin, M.N., Harmsen, F., Slooten, K. v., & Stagwee, R. A. (2004). An Agile Information Systems Development Method in use. Turk J Elec Engin, 12(2), 127-138
  15. ^ Abrahamsson, P., Warsta, J., Siponen, M.T., & Ronkainen, J. (2003). New Directions on Agile Methods: A Comparative Analysis. Proceedings of ICSE'03, 244-254
  16. ^ a b c Abrahamsson, P., Salo, O., Ronkainen, J., & Warsta, J. (2002). Agile Software Development Methods: Review and Analysis. VTT Publications 478
  17. ^ a b Aydin, M.N., Harmsen, F., Slooten van K., & Stegwee, R.A. (2005). On the Adaptation of An Agile Information(Suren) Systems Development Method. Journal of Database Management Special issue on Agile Analysis, Design, and Implementation, 16(4), 20-24
  18. ^ "David Bock's Weblog : Weblog". Jroller.com. http://jroller.com/page/bokmann?entry=improving_your_processes_aim_high. Retrieved 2010-04-02. 
  19. ^ "Agility measurement index". Doi.acm.org. http://doi.acm.org/10.1145/1185448.1185509. Retrieved 2010-04-02. 
  20. ^ Peter Lappo; Henry C.T. Andrew. "Assessing Agility". http://www.smr.co.uk/presentations/measure.pdf. Retrieved 2010-06-06. 
  21. ^ Kurian, Tisni (2006). Agility Metrics: A Quantitative Fuzzy Based Approach for Measuring Agility of a Software Process, ISAM-Proceedings of International Conference on Agile Manufacturing'06(ICAM-2006), Norfolk, U.S.
  22. ^ Joe Little (2007-12-02). "Nokia test, A scrum-specific test". Agileconsortium.blogspot.com. http://agileconsortium.blogspot.com/2007/12/nokia-test.html. Retrieved 2010-06-06. 
  23. ^ Mark Seuffert, Piratson Technologies, Sweden. "Karlskrona test, A generic agile adoption test". Piratson.se. http://www.piratson.se/archive/Agile_Karlskrona_Test.html. Retrieved 2010-06-06. 
  24. ^ "How agile are you, a scrum-specific test". Agile-software-development.com. http://www.agile-software-development.com/2008/01/how-agile-are-you-take-this-42-point.html. Retrieved 2010-06-06. 
  25. ^ David Cohen, Mikael Lindvall, Patricia Costa "Agile Software Development", Data & Analysis Center for Software, January 2003
  26. ^ DACS ROI Dashboard Retrieved 11 November 2011.
  27. ^ "Agile Methodologies Survey Results" (PDF). Shine Technologies. January 2003. http://www.shinetech.com/attachments/104_ShineTechAgileSurvey2003-01-17.pdf. Retrieved 2010-06-03. "95% [stated] that there was either no effect or a cost reduction . . . 93% stated that productivity was better or significantly better . . . 88% stated that quality was better or significantly better . . . 83% stated that business satisfaction was better or significantly better" 
  28. ^ Ambler, Scott (August 3, 2006). "Survey Says: Agile Works in Practice". Dr. Dobb's. http://www.drdobbs.com/architecture-and-design/191800169;jsessionid=2QJ23QRYM3H4PQE1GHPCKH4ATMY32JVN?queryText=agile+survey. Retrieved 2010-06-03. "Only 6 percent indicated that their productivity was lowered . . . No change in productivity was reported by 34 percent of respondents and 60 percent reported increased productivity. . . . 66 percent [responded] that the quality is higher. . . . 58 percent of organizations report improved satisfaction, whereas only 3 percent report reduced satisfaction." 
  29. ^ "The State of Agile Development" (PDF). VersionOne, Inc.. 2008. http://www.versionone.com/pdf/3rdAnnualStateOfAgile_FullDataReport.pdf. Retrieved 2010-07-03. "Agile delivers" 
  30. ^ "Answering the "Where is the Proof That Agile Methods Work" Question". Agilemodeling.com. 2007-01-19. http://www.agilemodeling.com/essays/proof.htm. Retrieved 2010-04-02. 
  31. ^ Agile Processes Workshop II Managing Multiple Concurrent Agile Projects. Washington: OOPSLA 2002
  32. ^ a b W. Scott Ambler (2006) Supersize Me in Dr. Dobb's Journal, February 15, 2006.
  33. ^ a b Boehm, B.; R. Turner (2004). Balancing Agility and Discipline: A Guide for the Perplexed. Boston, MA: Addison-Wesley. pp. 55–57. ISBN 0-321-18612-5. 
  34. ^ Beck, K. (1999). Extreme Programming Explained: Embrace Change. Boston, MA: Addison-Wesley. ISBN 0-321-27865-8. 
  35. ^ Schaaf, R.J. (2007). Agility XL Systems and Software Technology Conference 2007, Tampa, FL
  36. ^ "Bridging the Distance". Sdmagazine.com. http://www.drdobbs.com/architecture-and-design/184414899. Retrieved 2011-02-01. 
  37. ^ Martin Fowler. "Using an Agile Software Process with Offshore Development". Martinfowler.com. http://www.martinfowler.com/articles/agileOffshore.html. Retrieved 2010-06-06. 
  38. ^ [The Art of Agile Development James Shore & Shane Warden pg 47]
  39. ^ Evans, Ian. "Agile Delivery at British Telecom". http://www.methodsandtools.com/archive/archive.php?id=43. Retrieved 21 February 2011. 
  40. ^ [1] LogiGear, PC World Viet Nam, Jan 2011

Further reading

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Applied Agile Software Development — Agile Software Development (ASD) is a set of principles; Applied Agile Software Development (AASD) is one of the choices for making ASD work. AASD is a very tangible set of procedures to develop software in a mature and efficient way, based on… …   Wikipedia

  • Agile web development — is a model for development of web applications. Its concept is similar to Agile software development, but is limited to web applications. It is more efficient and powerful within a short timeline than other models,Fact|date=August 2008… …   Wikipedia

  • Software development process — Activities and steps Requirements Specification …   Wikipedia

  • Agile Software-Entwicklung — Agile Softwareentwicklung ist der Oberbegriff für den Einsatz von Agilität (lat.agilis flink, beweglich ) in der Softwareentwicklung. Je nach Kontext bezieht sich der Begriff auf Teilbereiche der Softwareentwicklung – wie im Fall von Agile… …   Deutsch Wikipedia

  • Software development methodology — A software development methodology or system development methodology in software engineering is a framework that is used to structure, plan, and control the process of developing an information system. Contents 1 History 1.1 As a noun 1.2 As a… …   Wikipedia

  • Software Development Rhythms — The approach of software development rhythms seeks to answer the key question of whether programmer productivity is impacted by the various agile practices, rather than by any single software development method. Beck says, Programming sometimes… …   Wikipedia

  • Agile Web Development with Rails — is a series of tutorial editions introducing the Ruby on Rails web application framework.It is edited by Dave Thomas and David Heinemeier Hansson; it also features Leon Beedt, Mike Clark, Thomas Fuchs, and Andreas Schwarz. Due to its tremendous… …   Wikipedia

  • Lean software development — is a translation of lean manufacturing principles and practices to the software development domain. Adapted from the Toyota Production System, a pro lean subculture is emerging from within the Agile community. Origin The term Lean Software… …   Wikipedia

  • Lean software development — En este artículo sobre tecnología e informática se detectaron los siguientes problemas: Necesita ser wikificado conforme a las convenciones de estilo de Wikipedia. Parece ser una traducción defectuosa. Por favor …   Wikipedia Español

  • Open source software development — is the process by which open source software (or similar software whose source code is publicly available) is developed. These are software products “available with its source code and under an open source license to study, change, and improve… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”