City and South London Railway

City and South London Railway
A picture of a City & South London Railway train from the Illustrated London News, 1890

The City and South London Railway (C&SLR) was the first deep-level underground "tube" railway in the world,[1][note 1] and the first major railway to use electric traction. The railway was originally intended for cable-hauled trains, but owing to the bankruptcy of the cable contractor during construction, a system of electric traction – an experimental technology at the time – was chosen instead.

When opened in 1890, the line had six stations and ran for 3.2 miles (5.1 km)[2] in a pair of tunnels between the City of London and Stockwell, passing under the River Thames. The diameter of the tunnels restricted the size of the trains, and the small carriages with their high-backed seating were nicknamed padded cells. The railway was extended several times north and south, eventually serving 22 stations over a distance of 13.5 miles (21.7 km) from Camden Town in north London to Morden in Surrey.[2]

Although the C&SLR was well used, low ticket prices and the construction cost of the extensions placed a strain on the company's finances. In 1913, the C&SLR became part of the Underground Group of railways and, in the 1920s, it underwent major reconstruction works before its merger with another of the Group's railways, the Charing Cross, Euston & Hampstead Railway, forming a single London Underground line called the Northern Line. In 1933, the C&SLR and the rest of the Underground Group was taken into public ownership. Today, its tunnels and stations form the Bank branch from Camden Town to Kennington and the southern leg of the line from Kennington to Morden.

Contents

Establishment

Arms of the City & South London Railway

In November 1883, notice was given that a private bill was to be presented to Parliament for the construction of the City of London & Southwark Subway (CL&SS).[3] The promoter of the bill, and engineer of the proposed railway, was James Henry Greathead, who had, in 1869–70, constructed the Tower Subway using the same tunnelling shield/segmented cast iron tube method proposed for the CL&SS. The railway was to run from Elephant and Castle, in Southwark, south London, under the River Thames to King William Street in the City of London. The tracks were to be in twin tunnels 3.1 metres (10 ft 2 in) in diameter.[4]

The bill received Royal Assent as the City of London and Southwark Subway Act, 1884 on 28 July 1884.[5] Section 5 of the Act stated:

"The works authorised by this Act are as follows:
"A subway commencing ... near ... Short Street at the ... junction ... with Newington Butts and terminating at King William Street ...
"The subway shall consist of two tubes for separate up and down traffic and shall be approached by means of staircases and by hydraulic lifts."

In 1886, a further bill was submitted to Parliament to extend the tunnels south from Elephant and Castle to Kennington and Stockwell.[6] This received assent on 12 July 1887 as the City of London and Southwark Subway (Kennington Extensions, &c.) Act, 1887,[7] allowing the construction of the extension to be added to the work on the original route, which had begun in 1886.[8] The tunnels on this section were of a slightly larger diameter – 3.2 m (10 ft 6 in).[4] Before the railway opened, a further bill received assent, granting permission to continue the line south to Clapham Common.[9] The act was published on 25 July 1890 as the City and South London Railway Act, 1890, also effecting a change of the company's name.[10]

Haulage and infrastructure

Given the small dimension of the tunnels, steam power, as used on London's other underground railways, was not feasible for a deep tube railway. Like Greathead's earlier Tower Subway, the CL&SS was intended to be operated by cable haulage with a static engine pulling the cable through the tunnels at a steady speed.[11] Section 5 of the 1884 Act specified that:

"The traffic of the subway shall be worked by ... the system of the Patent Cable Tramway Corporation Limited or by such means other than steam locomotives as the Board of Trade may from time to time approve".
C&SLR locomotive number 13 at the London Transport Museum Depot in 2005

The Patent Cable Tramway Corporation owned the rights to the Hallidie cable-car system first invented and used in San Francisco in 1873; trains were attached to the cable with clamps, which would be opened and closed at stations, allowing the carriages to disconnect and reconnect without needing to stop the cable or to interfere with other trains sharing the cable.[12] There were to be two independent endless cables, one between City station and Elephant and Castle moving at 10 mph, and the other between Elephant and Castle and Stockwell, where the gradient was less, at 12 mph. However, the additional length of tunnel permitted by the supplementary acts challenged the practicality of the cable system.

It is reported that this problem with the CL&SS contributed to the bankruptcy of the cable company in 1888.[4] However, electric motor traction had been considered all along, and much engineering progress had been made since the tunnel's construction had begun in 1886. So, CL&SS chairman Charles Grey Mott decided to switch to electric traction.[13] Other cable-operated systems using the Hallidie patents continued to be designed, such as the Glasgow Subway which opened in 1896.

The solution adopted was electrical power, provided via a third rail beneath the train, but offset to the west of centre for clearance reasons. Although the use of electricity to power trains had been experimented with during the previous decade, and small-scale operations had been implemented, the C&SLR was the first major railway in the world to adopt it as a means of motive power.[12][note 2] The system operated using electric locomotives built by Mather & Platt collecting a current at 500 volts (actually +500 volts in the northbound tunnel and -500 volts in the southbound) from the third rail and pulling several carriages.[14] A depot and generating station were constructed at Stockwell.[note 3] Owing to the limited capacity of the generators, the stations were originally illuminated by gas.[15] The depot was on the surface, and trains requiring maintenance were initially hauled up via a ramp although, following a runaway accident, a lift was soon installed.[16] In practice, most rolling stock and locomotives went to the surface only for major maintenance.

To avoid the need to purchase agreements for running under surface buildings, the tunnels were bored below roadways, where construction could be carried out without charge.[4] At the northern end of the railway, the need to pass deep beneath the bed of the River Thames and the mediaeval street pattern of the City of London constrained the arrangement of the tunnels on the approach to King William Street station. Because of the proximity of the station to the river, steeply inclined tunnels were required to the west of the station. Because of the narrow street under which they ran, they were bored one above the other rather than side by side as elsewhere.[4] The outbound tunnel was the lower and steeper of the two. The tunnels converged immediately before the station, which was in one large tunnel and comprised a single track with platforms either side.[note 4] The other terminus at Stockwell was also constructed in a single tunnel but with tracks on either side of a central platform.[note 5]

Opening

Kennington station, the only one of the original station buildings not replaced or substantially altered

The railway was opened officially by Edward, Prince of Wales (later Edward VII) on 4 November 1890.[19] It was opened to the public on 18 December 1890.[14] Initially, it had stations at:

The original service was operated by trains composed of an engine and three carriages. Thirty-two passengers could be accommodated in each carriage,[15] which had longitudinal bench seating and sliding doors at the ends, leading onto a platform for boarding and alighting. It was reasoned that there was nothing to look at in the tunnels, so the only windows were in a narrow band high up in the carriage sides. Gate-men rode on the carriage platforms to operate the lattice gates and announce the station names to the passengers. Because of their claustrophobic interiors, the carriages soon became known as padded cells.[21] Unlike other railways, the C&SLR had no ticket classes or paper tickets; when the railway began operations, a flat fare of two pence, collected at a turnstile, was charged.[15] Despite the cramped carriages and competition from bus and tram services, the railway attracted 5.1 million passengers in 1891, its first year of operation.[22] To alleviate overcrowding, the fleet of rolling stock was enlarged.[23]

James Henry Greathead's engineering diagram for the original route from King William Street (left) to Stockwell (right)

Extensions to Clapham and Islington, 1890–1901

Shortly before it opened to the public, the C&SLR gave notice of its intention to submit another private bill to Parliament, to construct a new line from its northern terminus at King William Street towards Islington.[24] Because of the awkward arrangement of King William Street station, the extension was not to be connected directly to the existing running tunnels but was to be linked via a pedestrian subway through which passengers could make interchanges between the separate lines. The bill was rejected on the grounds that the extension failed to make a connection to the existing line.[25] In November 1891, the C&SLR published details of a revised bill for the extension to Islington.[26] The company had recognised the deficiencies of its King William Street station and, just a year after the line had opened, planned to construct a new pair of tunnels to bypass the problematic northern section.

Near Borough station the new tunnels would branch off via a new station to form an interchange with London Bridge main-line station. The tunnels would then pass to the east of London Bridge, north through the City of London to The Angel, Islington. Following a delay, during which a Joint Select Committee reviewed the proposals of several new underground railways,[27] the City and South London Railway Act, 1893 received Royal Assent on 24 August 1893.[28] The Act also incorporated another bill of 1893[29] to grant an extension of time to build the southern extension to Clapham.[27]

Construction of the two authorised extensions was delayed while funds were raised and plans were finalised. Between 1895 and 1898, three further bills were put before Parliament to keep the permissions alive and obtain additional approvals:

  • 1895: an extension of time for the 1890 Act and to allow for a new approach tunnel to be built into King William Street station.[30] Approved as the City and South London Railway Act, 1895 on 14 April 1895.[31]
  • 1896: an extension of time for the 1893 Act and changes to the construction of Bank station.[32] Approved as the City and South London Railway Act, 1896 on 14 August 1896.[33]
  • 1898: an extension of time for the 1896 Act, plans to add sidings to the southern extension at Clapham Common and plans to sell King William Street station and its approach tunnels to the newly proposed City and Brixton Railway (C&BR).[34] Approved as the City and South London Railway Act, 1898 on 23 May 1898.[35]
The narrow central platform at Clapham Common with tracks on both sides dates from the 1900 extension.

The new tunnels permitted by the 1895 Act enabled the track layout at King William Street station to be modified to a single central platform with a track each side. This was opened as a temporary measure while funds for the extensions were raised. Finance was eventually obtained and construction proceeded so that the King William Street section closed and the first section of the northern extension opened on 25 February 1900,[36] with stations at:

The southern extension opened on 3 June 1900,[37] with stations at:

Like the original Stockwell station and the rearranged King William Street, Clapham Road and Clapham Common were constructed with a single station tunnel, with a central platform served by tracks on each side.[note 6]

Work continued on the rest of the northern extension. The City and South London Railway Act, 1900, approved on 25 May 1900,[38] gave permission to enlarge the station tunnel at Angel to a diameter of 9.2 m (30 ft)[39] [40] and the rest of the extension opened on 17 November 1901,[37] with stations at:

Extension to Euston, 1901–1907

Geographic route map of City & South London Railway

Despite the technical innovations of the railway and the large passenger demand,[23] the C&SLR was not particularly profitable and the rapid series of extensions aimed at improving profits had placed a strain on the finances. The dividends were low and declining (2⅛% in 1898, 1⅞% in 1899 and 1¼% in 1900) and the company had been accused of extravagance for the abandonment of King William Street station.[41] In an attempt to work around this poor reputation and make it easier to raise funds, the next bill for an extension of the line was submitted in November 1900 by a notionally separate company, the Islington and Euston Railway (I&ER),[42] albeit one that shared its chairman with the C&SLR.[note 7] The proposed railway was to run from the as yet unfinished C&SLR station at Angel to the main-line stations at King's Cross, St Pancras and Euston. The I&ER bill coincided with a rash of other railway bills encouraged by the successful opening of the Central London Railway (CLR) in 1900 and was considered alongside these by another Parliamentary Joint Committee in 1901. The bill was approved,[44] but the time taken for the committee's review meant that it had to be resubmitted for the 1902 Parliamentary session.[45]

In the 1902 session, the bill was considered again but was subject to opposition from one of London's other underground railways, the Metropolitan Railway (MR), which considered the proposed extension to be a threat to its service between King's Cross and Moorgate. The I&ER also submitted a petition to allow the C&SLR to take over the powers of the railway if approved.[46] The committee reversed its earlier decision and rejected the bill.[47] In November 1902, the C&SLR submitted a bill in its own name for the Euston extension as well as the authority to take over the dormant powers of the C&BR.[48] At Euston, the railway would have an interchange with the planned but not yet built Charing Cross, Euston & Hampstead Railway (CCE&HR). The intention for C&BR powers was to adapt them to provide a new station at King William Street, which would have pedestrian subway connections to the C&SLR's Bank station and the Metropolitan District Railway's (MDR's) Monument station. A third pair of tunnels would be constructed under the Thames to connect with the original abandoned tunnels north of Borough station and then the C&BR route would be constructed as previously approved with connections to the existing C&SLR route at London Bridge and Oval.[49] This time, the bill was approved and received Royal assent as the City and South London Railway Act, 1903 on 11 August 1903.[50] Although the C&BR proposals were never implemented, the Euston extension was quickly built and opened on 12 May 1907,[37] with stations at:

Cooperation and consolidation, 1907–1919

By 1907, Londoners had seen the network of deep tube underground railways expand from the original C&SLR line of 1890 with its six stations to a network of seven lines serving more than 70 stations.[note 8] These companies, along with the sub-surface Metropolitan Railway and Metropolitan District Railway, criss-crossed beneath the city streets, competing with one another for passengers as well as with the new electric trams and motor buses. In several cases pre-opening predictions of passenger numbers had proven to be over optimistic. The reduced revenues generated from the lower numbers of passengers using the lines made it difficult for the operators to pay back the capital borrowed and pay dividends to shareholders.[51][52]

In an effort to improve their collective situations, most of the underground railways in London: the C&SLR, the CLR, the Great Northern & City Railway and the Underground Electric Railways Company of London (UERL, which operated the Baker Street & Waterloo Railway (BS&WR), the Great Northern, Piccadilly & Brompton Railway (GNP&BR), the CCE&HR and the MDR) began, from 1907, to introduce fare agreements. From 1908, they began to present themselves through common branding as the Underground.[52] The Waterloo & City Railway, operated by the main-line London and South Western Railway, was the only tube railway that did not participate in the arrangement.

In 1912, the C&SLR submitted another bill for Parliamentary consideration seeking to increase its capacity by enlarging its tunnels to the larger diameter used for the tunnels of the more recently built railways to allow larger, more modern rolling stock to be used.[53] A separate bill was published at the same time by the London Electric Railway (LER, a company formed by the UERL in 1910 through a merger of the BS&WR, GNP&BR and CCE&HR), which included plans to construct tunnels to connect the C&SLR at Euston to the CCE&HR's station at Camden Town.[54] Together, the works proposed in these bills would enable the CCE&HR's trains to run over the C&SLR's route and vice versa, effectively combining the two separate railways.

On 1 January 1913 the LER purchased the C&SLR, paying two shares of its own stock for three of the C&SLR's,[55] a discount reflecting the struggling financial position of the older company.[note 9] Both bills were enacted on 15 August 1913, as the City and South London Railway Act, 1913 and the London Electric Railway Act, 1913.[56]

The proposed extension and tunnel enlargement works were delayed by World War I and it was not until after the war that works could begin.

Reconstruction, connections and extension, 1919–1926

[v · d · e]City & South London Railway
Legend
Extent of Railway in 1926
Unknown BSicon "utCONTg" Unknown BSicon "utCONTg"
To Chalk Farm/Kentish Town Opened 1907
Unknown BSicon "utCPICl" Left side of urban tunnel cross-platform interchange
Camden Town Opened 1907
Unknown BSicon "utKRWgl+l" Unknown BSicon "utKRWgr+r"
Camden Town Junction Rebuilt 1924
Urban tunnel straight track Urban tunnel stop on track
Mornington Crescent (CCE&HR) Opened 1907
Unknown BSicon "utSTRrg" Unknown BSicon "utUKRZu" Unknown BSicon "utSTRrf"
Link to CCE&HR at Camden Town Opened 1924
Urban tunnel station on track + Hub
Urban tunnel station on track + Hub
Euston Opened 1907
Unknown BSicon "utCONTf" Urban tunnel straight track
CCE&HR from Warren Street
Urban tunnel station on track
King's Cross St. Pancras Opened 1907
Urban tunnel stop on track
Angel Opened 1901
Urban tunnel unused stop on in-use track
City Road 1901–1922
Urban tunnel stop on track
Old Street Opened 1901
Urban tunnel stop on track
Moorgate Opened 1900
Urban tunnel stop on track
Bank Opened 1900
Unknown BSicon "uextSTRrg" Unknown BSicon "uteUKRZo" Unknown BSicon "uextKBHFr"
King William Street 1890–1900
Unknown BSicon "uextWSTR" Urban tunnel below water
River Thames
Unused urban tunnel straight track Urban tunnel station on track
London Bridge Opened 1900
Unknown BSicon "uextSTRlf" Unknown BSicon "uextABZlg"
Urban tunnel stop on track
Borough Opened 1890
Urban tunnel stop on track
Elephant & Castle Opened 1890
Unknown BSicon "utCONTg" Urban tunnel straight track
Link from Waterloo Opened 1926
Unknown BSicon "utCPICl" Left side of urban tunnel cross-platform interchange
Kennington Opened 1890
Unknown BSicon "utSTRlf" Unknown BSicon "utABZlg"
Urban tunnel stop on track
Oval Opened 1890
Unknown BSicon "uextABZrg"
Unknown BSicon "uexKDSl" + Unknown BSicon "PORTALr"
Stockwell Depot 1890–1923
Urban tunnel unused stop on in-use track
Original Stockwell platforms 1890–1923
Urban tunnel stop on track
Stockwell Opened 1924
Urban tunnel stop on track
Clapham North Opened 1900
Urban tunnel stop on track
Clapham Common Opened 1900
Urban tunnel stop on track
Clapham South Opened 1926
Urban tunnel stop on track
Balham Opened 1926
Urban tunnel stop on track
Tooting Bec Opened 1926
Urban tunnel stop on track
Tooting Broadway Opened 1926
Urban tunnel stop on track
Colliers Wood Opened 1926
Urban tunnel stop on track
South Wimbledon Opened 1926
Exit urban tunnel
Tunnel portal
Urban station on track
Morden Opened 1926
Unknown BSicon "uexBS2c2" Unknown BSicon "uxBS2lxr" Unknown BSicon "uBS2c3"
Unbuilt continuation to W&SR
Unused straight waterway Unknown BSicon "uKDSe"
Morden Depot
Unknown BSicon "dCONTr"
Unused waterway turning left + Transverse track
Transverse track + Unknown BSicon "vBHFr legende"
Unknown BSicon "dCONTl"
Morden South Opened 1930

In February 1919, with the war over, the C&SLR submitted a new bill that included provisions for an extension of time for the tunnel enlargement works approved in the act of 1913.[57] The resulting act was passed on 19 August 1919 as the City and South London Railway Act, 1919.[58] In 1920, under special wartime provisions, the LER was granted an extension of time to carry out the works for its own 1913 act.[59] Although the permissions to carry out the works had been renewed, the Underground companies were not in a position to raise the funds needed to pay for the works. Construction costs had increased considerably during the war years and the returns produced by the companies could not cover the cost of repaying borrowed capital.[60]

The projects were made possible when the government introduced the Trade Facilities Act, 1921 by which the Treasury underwrote loans for public works as a means of alleviating unemployment. With this support, the Underground companies were able to obtain the funds and work began on enlarging the tunnels of the C&SLR.

The tunnels were enlarged by removing several of the cast iron segments from each tunnel ring, excavating a void behind to the required new diameter and reinstalling the segments with additional packing spacers. The northern section of the C&SLR between Euston and Moorgate was closed from 8 August 1922, but the rest of the line remained open with enlargement works taking place at night.[61] A collapse on 27 November 1923 caused when a train hit temporary shoring on the incomplete excavations filled the tunnel with soil.[61] The line was briefly operated in two parts, but was completely closed on 28 November 1923.[61]

The Euston to Moorgate section reopened on 20 April 1924, along with the new tunnels linking Euston to Camden Town.[62] The rest of the line to Clapham Common reopened on 1 December 1924.[62] At the same time as the tunnels were being enlarged, the stations were modernised, with longer platforms, a new tiling scheme on platform and passageway walls and new frontages to the surface buildings. Some stations also received escalators to replace the original lifts.

While the reconstruction works were underway, the C&SLR submitted a bill in 1922 that contained proposals to extend the line south from Clapham Common through Balham and Tooting to Morden in tunnel.[63] From Morden, the line was to continue on the surface to Sutton sharing part of the route of an unbuilt railway planned from Wimbledon to Sutton.

See Wimbledon and Sutton Railway for full details

The bill was enacted as the City and South London Railway Act, 1923 on 2 August 1923.[64] Parallel negotiations with the Southern Railway over the proposals curtailed the extension at Morden, where a large new depot was constructed. The Morden extension opened on 13 September 1926,[65] with stations designed by Charles Holden at:

Also on 13 September 1926 a further connection between the CCE&HR and the C&SLR was opened when tunnels were brought into service from the CCE&HR's Charing Cross station (now Embankment) to Kennington station rebuilt with four platforms.[66] An intermediate station was constructed at Waterloo. Thus fully integrated, combined services operated over the C&SLR and CCE&HR routes using new Standard Stock trains. On tube maps the combined lines were shown in a single colour, although the separate names continued in use into the 1930s, when they began to be commonly called the "Northern line".[note 10]

Move to public ownership, 1924–1933

Despite the modernisation of the C&SLR and other improvements made to other parts of the network,[note 11] the Underground railways were still struggling to make a profit. The Underground Group's ownership of the highly profitable London General Omnibus Company (LGOC) since 1912 had enabled the Group, through the pooling of revenues, to use profits from the bus company to subsidise the less profitable railways.[note 12] However, competition from numerous small bus companies during the early years of the 1920s eroded the profitability of the LGOC and had a negative impact on the profitability of the whole Group.

In an effort to protect the Group's income, its Managing Director/Chairman, Lord Ashfield, lobbied the government for regulation of transport services in the London area. During the 1920s, a series of legislative initiatives was made in this direction, with Ashfield and Labour London County Councillor (later MP) Herbert Morrison, at the forefront of debates as to the level of regulation and public control under which transport services should be brought. Ashfield aimed for regulation that would give the existing Group protection from competition and allow it to take substantive control of the LCC's tram system; Morrison preferred full public ownership.[69] Eventually, after several years of false starts, a bill was announced at the end of 1930 for the formation of the London Passenger Transport Board, a public corporation that would take control of the Underground Group, the Metropolitan Railway as well as all buses and trams within an area designated as the London Passenger Transport Area.[70] The Board was a compromise – public ownership but not full nationalisation – and came into existence on 1 July 1933. On this date, the C&SLR and the other Underground companies were liquidated.[71]

For a history of the line after 1933 see Northern line

Legacy

The technologies of deep tube tunnelling and electric traction pioneered and proved by the C&SLR shaped the direction of subsequent underground railways built in London.[72] The C&SLR demonstrated that an underground railway could be constructed without the need to purchase large and expensive tracts of land for the shallow cuttings of sub-surface steam operated railways. Instead, it became possible to construct a tunnel at deep level without adversely affecting conditions on the surface. The C&SLR thus encouraged the construction of a network of underground railways in London, far larger than might have been the case otherwise.[73] The size and depth of the tunnels used on the deep tube lines, including the Northern line, does have drawbacks: the tunnels have a limited loading gauge and the lines suffer from overheating in the summer.

During World War II, the disused tunnels between Borough and King William Street stations were converted for use as an air-raid shelter, with entrances to the shelter at King William Street and at six sites south of the Thames (of nine planned).[74][75] In the 1960s the disused tunnels were used to assist the ventilation of London Bridge station and all the entrances bar that at 9 London Bridge Street were infilled with concrete. It is now only possible to access the tunnels from Three Castles House. Most of the C&SLR's six original station buildings were rebuilt or modified during the improvements to the line in the 1920s or during more recent modernisations. Only the building at Kennington retains its original exterior and the dome over the lift shaft, a feature of all the original stations.

Rolling stock

Locomotives

See City & South London Railway locomotives for more information
The interior of C&SLR locomotive 13
Numbers Builder Built
1–14 Mather & Platt 1889–90
15–16 Siemens Brothers 1891
17 C&SL Stockwell Works 1897-98
18 Crompton & Co. 1897–98
19 Electric Construction Co. 1897–98
20 Thames Ironworks 1897–98
21 C&SL Stockwell Works 1899
22 C&SL Stockwell Works 1900
23–32 Crompton & Co. 1899
33–42 Crompton & Co. 1900
43–52 Crompton & Co. 1901

Carriages

The interior of a C&SLR "padded cell" carriage
Numbers Builder Built
1–30 Ashbury Carriage & Iron Co. 1889–90
31–36 G.F. Milnes and Co. 1891
37–39 Bristol Carriage & Wagon Co. 1894
40–46 Oldbury Carriage & Wagon Co. 1896
47–54 G.F. Milnes and Co. 1897
55–84 Hurst Nelson & Co. 1899
85–108 G.F. Milnes and Co. 1901
109–124 Bristol Carriage & Wagon Co. 1901
125–132 G.F. Milnes and Co. 1902
133–165 Brush Electrical Engineering Co. 1907

Preserved Stock

A number of the C&SLR's vehicles have been preserved.

Number Type Location Notes
13 locomotive London Transport Museum
(Covent Garden)
On loan from the National Railway Museum
30 carriage London Transport Museum
(Covent Garden)
63 muck wagon London Transport Museum
(Acton Depot)
Used during 1922–23 reconstruction
135 carriage Electric Railway Museum, Baginton Awaiting restoration
163 carriage Electric Railway Museum, Baginton Conservation work ongoing

Locomotive 35 had been placed on display on a pedestal at the Metropolitan line's Moorgate station following the C&SLR's reconstruction. It was badly damaged during an air raid, and was eventually removed. Carriage number 39 survived for over two decades after withdrawal as a summer house at Watlington, Oxfordshire.[76]

Notes and references

Notes

  1. ^ A "tube" railway is an underground railway constructed in a cylindrical tunnel by the use of a tunnelling shield, usually deep below ground level.
  2. ^ Electric traction had been used for a number of tramway systems during the 1880s, starting with the Berlin tram system, which opened its first electric line in 1881.
  3. ^ Greathead's plan presented to the Institution of Civil Engineers, shows the depot and generating station were on the east side of Clapham Road/Kennington Park Road, approximately where Stockwell Gardens is today.
  4. ^ The original arrangement was a legacy of the intention to use cable haulage, and would have simplified operations if that method had been used. Instead, it proved a cause of congestion for electric locomotives, and King William Street station was reconfigured in 1895 to have a central platform with tracks on either side.[17]
  5. ^ The station was rebuilt in the 1920s in the conventional way, with separate tunnels for each platform. The new platforms were south of the original, and were constructed by enlarging the running tunnels.[18]
  6. ^ The C&SLR stations at Angel and Euston were also originally constructed with a single central platform. Reconstruction means that the original station tunnel now serves trains in one direction only – trains in the other direction have been diverted into a new tunnel.
  7. ^ Charles Mott acted as Chairman for the C&SLR and the I&ER. [43]
  8. ^ In order of opening, the seven lines were: 1. C&SLR (1890), 2. Waterloo & City Railway (1898), 3. Central London Railway (1900), 4. Great Northern & City Railway (1904), 5. Baker Street & Waterloo Railway (1906), 6. Great Northern, Piccadilly & Brompton Railway (1906) and 7. Charing Cross, Euston & Hampstead Railway (1907).[20]
  9. ^ At the same time, the LER also bought the Central London Railway, swapping one of its shares for one of the Central's
  10. ^ The combined route was shown in black as it is today with the line names Hampstead and Highgate Line and City & South London Railway (for example, see 1926 tube map) [67]
  11. ^ During World War I, the BS&WR was extended from Paddington to Watford Junction. Post war; extensions of the CLR from Wood Lane to Ealing Broadway (1920) and the CCE&HR from Golders Green to Edgware (1923/1924) were opened.[20]
  12. ^ By having a virtual monopoly of bus services, the LGOC was able to make large profits and pay dividends far higher than the underground railways ever had. In 1911, the year before its take-over by the Underground Group, the dividend had been 18 per cent [68]

References

  1. ^ Wolmar 2005, p. 4.
  2. ^ a b Length of line calculated from distances given at "Clive's Underground Line Guides, Northern Line, Layout". http://www.davros.org/rail/culg/northern.html#layout. Retrieved 20 September 2007. 
  3. ^ London Gazette: no. 25291. pp. 6066–6067. 27 November 1883. Retrieved 20 September 2007.
  4. ^ a b c d e Badsey-Ellis 2005, p. 35.
  5. ^ London Gazette: no. 25382. p. 3426. 29 July 1884. Retrieved 20 September 2007.
  6. ^ London Gazette: no. 25649. pp. 5866–5867. 26 November 1886. Retrieved 20 September 2007.
  7. ^ London Gazette: no. 25721. p. 3851. 15 July 1887. Retrieved 20 September 2007.
  8. ^ Badsey-Ellis 2005, p. 42.
  9. ^ London Gazette: no. 25995. pp. 6361–6362. 22 November 1889. Retrieved 20 September 2007.
  10. ^ London Gazette: no. 26074. p. 4170. 29 July 1890. Retrieved 20 September 2007.
  11. ^ Badsey-Ellis 2005, p. 36.
  12. ^ a b Wolmar 2005, p. 135.
  13. ^ Greathead 1896, p. 7.
  14. ^ a b Day & Reed 2008, p. 44.
  15. ^ a b c Wolmar 2005, p. 137.
  16. ^ Wolmar 2005, p. 134.
  17. ^ Connor 1999, p. 9.
  18. ^ Connor 1999, p. 118.
  19. ^ Day & Reed 2008, p. 42.
  20. ^ a b c d e f Rose 1999.
  21. ^ "Exploring 20th Century London, Padded Cell carriage". http://www.20thcenturylondon.org.uk/server.php?show=conObject.3432. Retrieved 20 September 2007. 
  22. ^ Wolmar 2005, p. 321.
  23. ^ a b Wolmar 2005, p. 140.
  24. ^ London Gazette: no. 26109. pp. 6519–6520. 25 November 1890. Retrieved 20 September 2007.
  25. ^ Badsey-Ellis 2005, p. 48.
  26. ^ London Gazette: no. 26226. pp. 6349–6351. 24 November 1891. Retrieved 20 September 2007.
  27. ^ a b Badsey-Ellis 2005, p. 61.
  28. ^ London Gazette: no. 26435. p. 4825. 25 August 1893. Retrieved 20 September 2007.
  29. ^ London Gazette: no. 26348. p. 6840. 25 November 1892. Retrieved 20 September 2007.
  30. ^ London Gazette: no. 26573. pp. 6659–6660. 23 November 1894. Retrieved 20 September 2007.
  31. ^ London Gazette: no. 26625. p. 2869. 17 May 1895. Retrieved 20 September 2007.
  32. ^ London Gazette: no. 26682. pp. 6587–6588. 22 November 1895. Retrieved 20 September 2007.
  33. ^ London Gazette: no. 26769. p. 4694. 18 August 1896. Retrieved 20 September 2007.
  34. ^ London Gazette: no. 26914. pp. 6924–6925. 26 November 1897. Retrieved 20 September 2007.
  35. ^ London Gazette: no. 26970. p. 3236. 24 May 1898. Retrieved 20 September 2007.
  36. ^ Day & Reed 2008, p. 46.
  37. ^ a b c Day & Reed 2008, p. 47.
  38. ^ London Gazette: no. 27197. p. 3404. 29 May 1900. Retrieved 20 September 2007.
  39. ^ Badsey-Ellis 2005, p. 86.
  40. ^ London Gazette: no. 27138. p. 7818. 24 November 1899. Retrieved 20 September 2007.
  41. ^ Badsey-Ellis 2005, p. 95.
  42. ^ London Gazette: no. 27249. pp. 7482–7483. 23 November 1900. Retrieved 20 September 2007.
  43. ^ Badsey-Ellis 2005, p. 96.
  44. ^ Badsey-Ellis 2005, p. 110.
  45. ^ Badsey-Ellis 2005, p. 111.
  46. ^ London Gazette: no. 27422. p. 2289. 4 April 1902. Retrieved 20 September 2007.
  47. ^ Badsey-Ellis 2005, p. 139.
  48. ^ London Gazette: no. 27497. pp. 7764–7767. 21 November 1902. Retrieved 20 September 2007.
  49. ^ Badsey-Ellis 2005, pp. 212–13.
  50. ^ London Gazette: no. 27588. p. 5144. 14 August 1903. Retrieved 20 September 2007.
  51. ^ Wolmar 2005, p. 171.
  52. ^ a b Badsey-Ellis 2005, pp. 282–83.
  53. ^ London Gazette: no. 28665. pp. 8802–8805. 22 November 1912. Retrieved 20 September 2007.
  54. ^ London Gazette: no. 28665. pp. 8798–8801. 22 November 1912. Retrieved 20 September 2007.
  55. ^ Wolmar 2005, p. 205.
  56. ^ London Gazette: no. 28747. p. 5931. 19 August 1913. Retrieved 20 September 2007.
  57. ^ London Gazette: no. 31180. pp. 2293–2296. 14 February 1919. Retrieved 20 September 2007.
  58. ^ London Gazette: no. 31510. p. 10472. 19 August 1919. Retrieved 20 September 2007.
  59. ^ London Gazette: no. 32032. p. 8800. 27 August 1920. Retrieved 20 September 2007.
  60. ^ Wolmar 2005, pp. 220–21.
  61. ^ a b c Wolmar 2005, pp. 223–24.
  62. ^ a b Day & Reed 2008, p. 94.
  63. ^ London Gazette: no. 32770. pp. 8314–8315. 24 November 1922. Retrieved 20 September 2007.
  64. ^ London Gazette: no. 32850. p. 5322. 3 August 1923. Retrieved 20 September 2007.
  65. ^ Day & Reed 2008, p. 96.
  66. ^ Day & Reed 2008, p. 97.
  67. ^ "A History of the London Tube Maps". http://homepage.ntlworld.com/clivebillson/tube/tube.html. Retrieved 20 September 2007. 
  68. ^ Wolmar 2005, p. 204.
  69. ^ Wolmar 2005, pp. 259–62.
  70. ^ London Gazette: no. 33668. pp. 7905–7907. 9 December 1930. Retrieved 20 September 2007.
  71. ^ Wolmar 2005, p. 266.
  72. ^ Badsey-Ellis 2005, p. 47.
  73. ^ Wolmar 2005, pp. 140–41.
  74. ^ Connor 1999, pp. 10–13.
  75. ^ "Abandoned Tube Stations – King William Street". http://www.abandonedstations.org.uk/King_William_Street_2.html. Retrieved 20 September 2007. 
  76. ^ Lascelles, T.S. (1955). The City & South London Railway. Lingfield, Surrey: The Oakwood Press. 

Bibliography

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • City and South London Railway — Die City and South London Railway (C SLR) war eine Vorgängergesellschaft der heutigen London Underground, der U Bahn der britischen Hauptstadt London. Deren erster Streckenabschnitt ist die älteste in tief liegenden, gebohrten Röhren errichtete U …   Deutsch Wikipedia

  • City \x26 South London Railway — City South London Railway Saltar a navegación, búsqueda Una fotografía de un tren de la City South London Railway, de la Illustrated London News, 1890 La City South London Railway (C SLR) fue la primera línea de ferrocarril subterráneo profundo… …   Wikipedia Español

  • City & South London Railway — City South London Railway Image de la City South London Railway publiée dans the Illustrated London News La City South London Railway (C SLR) est considérée comme le premier train au monde situé en profondeur[1] et aussi à utiliser la …   Wikipédia en Français

  • City & South London Railway — Die City and South London Railway (C SLR) war eine Vorgängergesellschaft der heutigen London Underground, der U Bahn der britischen Hauptstadt London. Deren erster Streckenabschnitt ist die älteste in tief liegenden, gebohrten Röhren errichtete U …   Deutsch Wikipedia

  • City & South London Railway — Image de la City South London Railway publiée dans the Illustrated London News La City South London Railway (C SLR) est considérée comme la première ligne de chemin de fer souterraine[1] utilisant la technologie de la traction électrique. À …   Wikipédia en Français

  • City & South London Railway — Una fotografía de un tren de la City South London Railway, de la Illustrated London News, 1890. La City South London Railway (C SLR) fue la primera línea de ferrocarril subterráneo profundo del mundo,[1] y el prim …   Wikipedia Español

  • London and South Western Railway — The London and South Western Railway (L SWR) was a railway company in England from 1838 to 1922. Its network extended from London to Plymouth via Salisbury and Exeter, with branches to Ilfracombe and Padstow and via Southampton to Bournemouth and …   Wikipedia

  • London and South Western Railway — L SWR Netz bei seiner größten Ausdehnung 1922 London and South Western Railway (L SWR) war eine Eisenbahn Gesellschaft in England, die von 1838 bis 1922 bestand. Ihr Netzwerk erstrecke sich von London südwest und westwärts bis Plymouth über… …   Deutsch Wikipedia

  • Glasgow and South Western Railway — Infobox SG rail railroad name = Glasgow and South Western Railway logo filename = GSWR logo.png logo size = system map caption = map size = marks = image size = image caption = locale = Scotland start year = 1850 end year = 1923 predecessor line …   Wikipedia

  • Dublin and South Eastern Railway — The Dublin and South Eastern Railway (DSE) was an Irish gauge (1,600 mm (5 ft 3 in)) railway in Ireland from 1846 to 1925. It was incorporated by Act of Parliament in 1846 as the Waterford, Wexford, Wicklow and Dublin… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”