South Pars / North Dome Gas-Condensate field

South Pars / North Dome Gas-Condensate field
South Pars / North Dome Field
South Pars / North Dome Gas-Condensate field is located in Iran
{{{alt}}}
Location of South Pars / North Dome Field
Country Iran
Qatar
Location Persian Gulf
Offshore/onshore Offshore
Coordinates 26°37′08.85″N 52°04′04.67″E / 26.619125°N 52.0679639°E / 26.619125; 52.0679639Coordinates: 26°37′08.85″N 52°04′04.67″E / 26.619125°N 52.0679639°E / 26.619125; 52.0679639
Operator(s) Qatar Petroleum
NIOC
Field history
Discovery 1971
Start of production 1989
Production
Peak of production (gas) 60,000 million cubic feet per day (1,700×10^6 m3/d)
Estimated gas in place 1,800,000 billion cubic feet (51,000×10^9 m3)
Recoverable gas 1,260,000 billion cubic feet (36,000×10^9 m3)
Producing formations Kangan (Triassic)
Upper Dalan (Permian)

The South Pars / North Dome field is a natural gas condensate field located in the Persian Gulf. It is the world's largest gas field, shared between Iran and Qatar.[1] According to the International Energy Agency (IEA), the field holds an estimated 1,800 trillion cubic feet (51 trillion cubic metres) of in-situ natural gas and some 50 billion barrels (7.9 billion cubic metres) of natural gas condensates.[2]

This gas field covers an area of 9,700 square kilometres (3,700 sq mi), of which 3,700 square kilometres (1,400 sq mi) (South Pars) is in Iranian territorial waters and 6,000 square kilometres (2,300 sq mi) (North Dome) is in Qatari territorial waters.[3]

Contents

Field geology

  • Depth: 3,000 metres (9,800 ft) below the seabed[4]
  • Water depth: 65 metres (213 ft)[4]

The field consists of two independent gas-bearing formations, Kangan (Triassic) and Upper Dalan (Permian). Each formation is divided into two different reservoir layers, separated by impermeable barriers. The field consists of four independent reservoir layers K1, K2, K3, and K4.[5]

The K1 and K3 units are mainly composed of dolomites and anhydrites while K2 and K4, which constitute major gas reservoirs, comprise limestone and dolomite. A massive anhydrite (the Nar Member) separates the K4 from the underlying K5 unit which has poor reservoir qualities.[6] The gross pay zone in the South Pars field is approximately 450 m thick, extending from depths of approximately 2750 to 3200 m. Reservoir strata dip gently to the NE. The average thickness of the reservoir units declines from South Pars (some 450 metres (1,480 ft)) to North field (385 metres (1,263 ft)). As in other reservoir structures in neighboring areas, the reservoir in the Qatar Arch is cut by a set of NNW-SSE trending faults.[7]. Diagenesis has a major effect on reservoir quality of the Field [8].

The field is a part of the N-trending Qatar Arch structural feature that is bounded by Zagros fold belt to the north and northeast.[9]

In the field, gas accumulation is mostly limited to the Permian–Triassic stratigraphic units. These units known as the Kangan–Dalan Formations constitute very extensive natural gas reservoirs in the field and Persian Gulf area, which composed of carbonate–evaporite series also known as the Khuff Formation.[9]

Permian–Early Triassic has been divided into Faraghan (Early Permian), Dalan (Late Permian) and Kangan (Early Triassic) Formations.[9]

Reservoir characteristics

The largest non-associated gas reserve of the world is hosted by the Upper Dalan–Kangan (Upper Khuff equivalent) Permo-Triassic carbonate–evaporite successions. Detailed characterization of these strata in the South Pars field has shown that the reservoir properties are a function of both sedimentary and diagenetic processes at the field scale. Facies analysis of the studied units indicates that the sediments were deposited in the inner regions of a homoclinal carbonate ramp and were subsequently subjected to shallow diagenesis and minor burial. The vertical distribution of the facies shows cyclic patterns that impact reservoir quality. The rock type classes have been grouped on the basis of the dominant pore spaces, and have enabled distinct fields to be identified. This approach has demonstrated a relationship between poroperm values and rock type groups. Diagenetic overprinting has significantly affected the reservoir properties.[10]

Although the original poroperm heterogeneities in the studied reservoir are inherited from the Upper Dalan–Kangan palaeoplatform, they have been modified strongly by diagenetic overprinting. Consequently, tentative correlation may be possible between facies types and reservoir properties based on diagenetic effects. Therefore, for precise characterization of the Upper Dalan–Kangan reservoir properties it has been necessary to integrate both the depositional history and diagenetic features. Based on the thin section studies from this field, pore spaces are classified into three groups including depositional, fabric-selective and non-fabric selective. Stable isotope studies confirm the role of diagenesis in reservoir quality development. Integration of various data show that different diagenetic processes developed in two reservoir zones in the Kangan and Dalan formations. While dolomitisation enhanced reservoir properties in the upper K2 and lower K4 units, lower part of K2 and upper part of K4 have experienced more dissolution. Integration of RQI, porosity-permeability values and pore-throat sizes resulted from mercury intrusion tests shows detailed petrophysical behavior in reservoir zones. Though both upper K2 and lower K4 are dolomitised, in upper K2 unit non-fabric selective pores are dominant and fabric destructive dolomitisation is the main cause of high reservoir quality. In comparison, lower K4 has more fabric-selective pores that have been connected by fabric retentive to selective dolomitisation. [11] Generally, the early diagenetic overprints of marine origin include micritisation, marine cementation and early stages of compaction. The petrological features of this realm include fibrous cements, skeletal micritisation, orientation of the elongated grains, early anhydrite cementation and slight deformation of grains. The diagenesis stages continue with meteoric diagenesis during which metastable skeletal and non-skeletal grains were dissolved, generating secondary fabric- and non-fabric selective porosity. Grading recrystallisation and chemical compaction indicate a burial diagenetic environment and its petrographic characteristics include coarse mosaic calcites with undulatory extinction, stylolites, sutured and concave-convex contacts between grains [12]

Reserves

According to International Energy Agency (IEA), the combined structure is the world's largest gas field.[1]

In-place volumes are estimated to be around 1,800 trillion cubic feet (51 trillion cubic metres) gas in place and some 50 billion barrels (7.9 billion cubic metres) of natural gas condensate in place.[13] With in place volumes equivalent to 360 billion barrels (57 billion cubic metres) of oil[14] (310 billion boe of gas and 50 billion boe of natural gas condensate) the field is the world's biggest conventional hydrocarbon accumulation.

South Pars/North Dome Field

The field recoverable gas reserve is equivalent to some 215 billion barrels (34.2 billion cubic metres) of oil and it also holds about 16 billion barrels (2.5 billion cubic metres) of recoverable condensate corresponding of about 230 billion barrels (37 billion cubic metres) of oil equivalent recoverable hydrocarbons.

The gas recovery factor of the field is about 70%, corresponding of about 1,260 trillion cubic feet (36×10^12 m3) of total recoverable gas reserves which stands for about 19% of world recoverable gas reserves.[15]

The estimates for the Iranian section are 500 trillion cubic feet (14×10^12 m3) of natural gas in place and around 360 trillion cubic feet (10×10^12 m3) of recoverable gas which stands for 36% of Iran's total proven gas reserves and 5.6% of the worlds proven gas reserves.[13]

The estimates for the Qatari section are 900 trillion cubic feet (25×10^12 m3) of recoverable gas which stands for almost 99% of Qatar's total proven gas reserves and 14% of the worlds proven gas reserves.[16]

Table 1-"South Pars / North Field Gas Reserves"

In Place Gas Reserve (trillion cu ft) Recoverable Gas Reserve (trillion cu ft)
South Pars 500 360
North Dome 1300 900
Total Field 1800 1260

However, since the field is a common field and the reservoir is highly homogenous, the ultimate recoverable reserves of each country may vary from this technical assessment which only considers the static data and does not include rate of gas migration. So, it is better to say that the ultimate recoverable reserves of each country would be a factor of cumulative gas production by each of them.

The Iranian section also holds 18 billion barrels (2.9 billion cubic metres) of condensate in place of which some 9 billion barrels (1.4 billion cubic metres) are believed to be recoverable,[17] while Qatari section believed to contains some 30 billion barrels (4.8×109 m3) of condensate in place and at least some 10 billion barrels (1.6 billion cubic metres) of recoverable condensate.[18]

The field is rich in liquids and yields approximately 40 barrels (6.4 m3) of condensate per 1 million cubic feet (28×10^3 m3) of gas. It has also very high level of well productivity which in average stands for 100 million cubic feet (2.8×10^6 m3) per day per well.[19]

Reserve uncertainties

In 2005, Qatar Petroleum became worried the North Dome’s reserves were being developed too quickly, which could reduce reservoir pressure and possibly damage its long-term production potential. In early 2005, the government placed a moratorium on additional development projects at the North Dome pending a study of the field’s reservoirs.[20] This assessment is not expected to end until after 2009, meaning new projects are unlikely to be signed before 2010. However, this did not affect projects approved or underway before the moratorium.[21]

On 29 October 2007, Qatargas CEO Faisal Al Suwaidi stated that the 5 year moratorium on new North Field gas development projects, imposed in 2005, could be extended to 2011 or 2012.[20]

The 2005 moratorium by Qatar and the subsequent extension of that raised some questions about the actual proven reserves in Qatari side of the field. There is some news that ConocoPhillips drilled an unexpected dry holes in the North Field and this event was at least a partial catalyst for a revamped perspective on the North field structure and potential.[22]

Another supporting evidence for skepticism about the real scale of Qatari's reserves comes from the latest ongoing exploration round in Qatar which is targeting exploration of gas in pre-Khuff formation. Even one of the blocks is exactly located beneath the North Dome Field.[23]

Some petroleum industry experts believe that 900 trillion cubic feet (25 trillion cubic metres) of natural gas reserves reported by Qatar stands for gas in place volume and consequently Qatar's recoverable gas reserves should be about 500 trillion cubic feet (14 trillion cubic metres) to 600 trillion cubic feet (17 trillion cubic metres). The moratorium applied by Qatar Petroleum for future development of the field is a supporting evidence of this belief. They believe, if as Qatar claims the North Dome holds 900 trillion cubic feet (25 trillion cubic metres) recoverable gas, the reservoir should be capable of producing much more than current planned capacity (see Table 2). The results of current ongoing study undertaken by Qatar on the field will determine the actual reserves of the Qatari section.[citation needed]

South Pars development

South Pars and Iranian Oil and Gas Infrastructures
Horizon of Persian Gulf in South Pars Area
Horizon of Persian Gulf in South Pars Area

The South Pars Field was discovered in 1990 by National Iranian Oil Company (NIOC).[9] The Pars Oil and Gas Company.[17] a subsidiary of NIOC, has jurisdiction over all South Pars-related projects. Field development has been delayed by various problems - technical (i.e., high levels of mercaptans and foul-smelling sulfur compounds), contractual issues and recently politics.

Gas production started from the field by commissioning phase 2 in December 2002 to produce 1 billion cubic feet per day (28 million cubic metres per day) of wet gas. Gas is sent to shore via pipeline, and processed at Assaluyeh.

Condensate production from South Pars is currently 200,000 barrels per day (32,000 m3/d), and by 2010, could increase to over 500,000 barrels per day (79,000 m3/d). As of December 2010, South pars gas field's production capacity stands at 75 million cubic metres (2.6 billion cubic feet) of natural gas per day.[24] Gas production at South Pars rose by nearly 30% between March 2009 and March 2010. The field's reserves are estimated at 14 trillion cubic metres (490 trillion cubic feet) of natural gas and 18 billion barrels (2.9 billion cubic metres) of natural gas condensates. Production at South Pars gas field will rise to 175 million cubic metres (6.2 billion cubic feet) per day in 2012.[25]

NIOC is planning to develop the field in 24 to 30 phases, capable of producing about 25 billion cubic feet (710 million cubic metres) to 30 billion cubic feet (850 million cubic metres) of natural gas per day.

Each standard phase is defined for daily production of 1 billion cubic feet (28 million cubic metres) of natural gas, convert|40,000|oilbbl of condensate, 1500 tonnes of liquefied petroleum gas (LPG) and 200 tonnes of sulfur, however some phases have some different production plans.[26]

Each of the phases is estimated to have an average capital spend of around US$1.5 billion, and most will be led by foreign oil firms working in partnership with local companies.[27] The government of Mr Ahmadinejad, who came to power in 2005, has favoured local firms over foreign companies in the energy and other sectors.[27]

By the beginning of 2008 phases 1, 2, 3, 4 and 5 has been brought to production and by the end of 2008 phases 6, 7, 8, 9 and 10 will be on stream. Phases 12, 15, 16, 17, 18, 19, 27 and 28 are under different development stages.

Project finance

Financing is expected to come from a variety of sources including the Oil Ministry, withdrawals sources will come from a variety of sources including the Oil Ministry, withdrawals from the National Development Fund, the issuance of bonds both domestically and also internationally, and from domestic banks through an energy fund.[28][29]

The Oil Ministry has called for the issue of more than $12 billion worth of bonds for a period of three years.[30] Three billion euros will be allocated to the South Pars gas field and the rest will go to oil field development projects.[31][32] As of December 2010, about $30 billion have been invested in South Pars gas fields' development plan.[33] It is estimated that the amount will reach over $40 billion by 2015.[34] The Ministry of Petroleum in Iran said in a revised statement in 2011 that Iran will invest some $90 billion between 2011 and 2015 ($60 billion will be allocated to the upstream sector and the rest to the downstream sector).[35]

Once the eight remaining phases are fully developed by 2014, the facility will produce a total of 320,000 barrels per day (51,000 m3/d) of natural gas condensates and 4 million tons of sulfur as well as an annual sum of 4.4 million tons of LPG and 4 million tons of ethane gas.[36]

By 2015, the annual revenue of the field will soar to $100 billion, raising Iran's gas output to 1.1 billion cubic metres (39 billion cubic feet) per day.[37]

South Pars Phases

  • Phase 1 was developed by Petropars to produce 1 billion cubic feet (28 million cubic metres) per day of natural gas, 40,000 barrels per day (6,400 m3/d) of condensate, 1500 tons of LPG per day plus 200 tons of sulfur per day.
  • Phases 2 and 3 were developed by a consortium of Total S.A., Petronas and Gazprom to produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 80,000 barrels per day (13,000 m3/d) of condensate, 3000 tons of LPG per day plus 400 tons of sulfur per day. It came online in March 2003.
  • Phases 4 and 5 were developed by Eni and Petropars, to produce 2 billion cubic feet (57 million cubic metres) per day of rich natural gas, 75 million cubic feet (2.1 million cubic metres) per day of ethane, 80,000 barrels per day (13,000 m3/d) of condensate, 3000 tons of LPG per day plus 400 tons of sulfur per day.
  • Phases 6, 7 and 8 being developed by Petropars and Statoil to produce lean gas for re-injection into the Aghajari oilfield, and heavy gas and condensate for export. It involves construction of three offshore platforms in addition to the land based facilities. Statoil is developing the offshore platforms while Petropars is developing the land based facilities. A 31-inch (790 mm) pipe will be laid from each platform to the coast. These phases will produce 3 billion cubic feet (85 million cubic metres) per day of natural gas, 70 million cubic feet (2.0 million cubic metres) of ethane, 120,000 barrels per day (19,000 m3/d) of condensate, 4500 tons of LPG per day plus 600 tons of sulfur per day.
  • Phases 9 and 10 being developed by LG. These phases will produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) per day of ethane, 80,000 barrels per day (13,000 m3/d) of condensate, 3000 tons of LPG per day plus 400 tons of sulfur per day. Phases 9 & 10 were inaugurated by President Ahmadinejad on March 2009.[38]
  • Phases 11 will produce LNG through the Pars LNG project. The project was awarded to China National Petroleum Corporation in 2010 after that France's Total S.A. was excluded from the project by Iran.[39]
  • Phases 12 development begin carried out by Petropars as a LNG project. This phase will produce 2.5 billion cubic feet (71 million cubic metres) per day of rich natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3000 tons of LPG per day plus 400 tons of sulfur per day. Venezuela’s state-owned oil company Petroleos de Venezuela S.A. (PDVSA) will finance 10% of the $7.8 billion project. Angola’s Sonangol Group has also been awarded a 20% stake in phase 12 project.[40]
  • Phase 13 and 14 development will be for Persian LNG production. Development was awarded to an Iranian company (Khatam-ol-Osea) for $5 billion.[41] The Iranian Khatam-ol-Osea Consortium is made up of several large Iranian companies, namely Khatam al-Anbia Construction Headquarters, Oil Industries Engineering & Construction (OIEC), SADRA, ISOICO, IDRO, and NIDC.[42] The contract to develop phase 13 was signed with a consortium comprising Mapna, SADRA and Petro Pidar Iranian companies and the phase 14 with another consortia consisting of Industrial Development and Renovation Organization (IDRO), National Iranian Drilling Company (NIDC) and Iranian Offshore Engineering and Construction Company (IOEC).[43] Royal Dutch Shell and Repsol had been originally awarded phases 13 and 14 but were left out of the project by Iran due to their repeated delays.[44]
  • Phases 15 and 16 development was awarded to Khatam al-Anbia.[45] These phases will produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. In July 2010, the project was transferred to Iran Shipbuilding & Offshore Industries Complex. At that time, the $2 billion project was already 50% complete.[46] Phase 15 & 16 will be completed by March 2012.[47]
  • Phases 17 and 18 development was assigned to a consortium of Oil Industrial Engineering and Construction Company (OIEC), Iran Offshore Engineering and Construction (IOEC) and Petropars. These phases will produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. Phase 17 & 18 will be completed by March 2012.[47]
  • Phase 19 development was awarded to OIEC and Petropars.[43] These phases will produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. As it is understood this phase is defined within phase 1 so it can be regarded as some kind of expansion for phase 1.[48]
  • Phases 20 and 21 development was awarded to OIEC.[49] 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 80,000 barrels per day (13,000 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day. In May 2008, Repsol and Royal Dutch Shell agreed to exchange block 13 with block 20 or 21 [50]
  • Phases 22, 23 and 24 were awarded to Khatam al-Anbia, Petro Sina Arian and SADRA and are located in the north-eastern frontier of the field.[43][51] The aim of phases 22, 23 and 24 development is to produce 42.5 million cubic metres (1.50 billion cubic feet) per day of natural gas, 57,000 barrels per day (9,100 m3/d) of natural gas condensate, and 300 tons of sulfur per day. The three phases also are designed to produce 800,000 tons of LNG and 750,000 tons of ethane per year.[43]
  • Phases 25 and 26 are in tender.
  • Phases 27 and 28 development was assigned to Petropars on an EPC scheme.[49] These phases will produce 2 billion cubic feet (57 million cubic metres) per day of natural gas, 75 million cubic feet (2.1 million cubic metres) of ethane, 75,000 barrels per day (11,900 m3/d) of natural gas condensate, 3,000 tons of LPG per day plus 400 tons of sulfur per day.

Table 2-South Pars Gas and Condensate Production Plan [17]

Phase General Contractor 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
1 Petropars 500 750 750 750 750 750 750 750 750 750 750 750 750
2&3 Total S.A. 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
4&5 Eni 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000
6,7&8 Petropars/Statoil 1000 2500 3700 3700 3700 3700 3700 3700 3700
9&10 ‎Consortium of LG Korea, OIEC and IOEC 1000 2000 2000 2000 2000 2000 2000 2000 2000
11 China National Petroleum Corporation (CNPC)[52] 1000 2000 2000
12 Petropars 1000 2000 3000 3000 3000 3000
13 Khatam-ol-Osea[41] 1000 2000 2000
14 Khatam-ol-Osea[41] 500 1000 1000
15&16 Khatam al-Anbia, replaced with OSOICO in 2010. 1000 2000 2000
17&18 Consortium of IDRO, IOEC and OIEC 1000 2000 2000
19 IOEC & Petropars[43] 500 1500
20&21 OIEC[53] 1000 2000
22,23&24 Khatam al-Anbia[51] 1000 3000
25&26 TBD 1000 2000
27&28 Petropars 1000 2000
Total Gas Production million cu ft/d 2,000 2,500 4,750 4,750 4,750 9,250 10,450 10,450 11,450 12,450 13,450 17,950 24,950 29,450
Total Condensate Production kbbl/d 80 100 190 190 190 370 420 420 460 500 540 720 1,000 1,200

Table Sources: NIOC, Pars Oil & Gas Company, Shana and Media

Development delays and criticisms

While several phases of South Pars gas field are still waiting for development and the ongoing development phases are facing delays, NIOC authorities are conducting negotiations for development of other Iranian offshore gas fields like North Pars, Kish, Golshan, Ferdows and Lavan.

Many Iranian energy analysts believe that NIOC authorities should focus on full development of South Pars field prior to conduction of any new project for development of other undeveloped Iranian offshore gas fields.

The priority of South Pars full development is not only due to its shared nature with Qatar, but also with huge capability of the field to add significant liquid production to Iranian liquid export capacity.

On the 27 February 2009 one of the members of Iranian Parliaments, criticized lack of attention on the importance of acceleration of South Pars field development and the field development delays.[54]

Scale and impacts of delays

By the end of 2008 Qatar’s cumulative production from the field was two times higher than Iran's cumulative production from the field. Qatar produced about 20 trillion cubic feet (570 billion cubic metres) of natural gas in the period of 1997 to 2008, while Iran produced about 10 trillion cubic feet (280 billion cubic metres) of natural gas in the period of 2003 to 2008. The 2:1 ratio of Qatar's cumulative gas production from the field to Iran's is forecasted to continue at least for the short term: by the end of 2011, Qatar's total cumulative production from the field will reach 41 trillion cubic feet (1.2 trillion cubic metres) of natural gas, while Iran's will stand at 21 trillion cubic feet (590 billion cubic metres) of natural gas in the same year. The ratio is maintained mainly because Qatar's annual production is almost twice the Iranian production level.

In 2011, Qatar will reach an annual production capacity 8 trillion cubic feet (230 billion cubic metres) of natural gas per year, while in that year Iran's production capacity will reach 4 trillion cubic feet (110 billion cubic metres) per year. If Iran could implement all of its South Pars planned development projects on time, then it would reach the production capacity of 8 trillion cubic feet (230 billion cubic metres) of natural gas per year, not earlier than 2015.

The most important impact of delays and lower production in Iranian side would be migration of gas to the Qatari part and a loss of condensate yield due to decreased field pressure.

North Dome development

The North Dome also known as North Field, was discovered in 1971,[9] with the completion of Shell's North West Dome-1 well.

With falling oil and associated gas production, and depletion of the Khuff reserves, developing the North field became imperative. In 1984 it was decided that development would occur in phases. Phase 1 involved installing production, processing, and transport facilities for 800 million cubic feet (23 million cubic metres) of natural gas per day to serve local utilities and produce 5,000 tons per day of propane, butane, gasoline, and naphtha. In 1989 a gas sweetening plant and sulfur processing unit were added. Phase one was online by early 1991. Gas from North Field phase one has been primarily used for local demand, and injection into the Dukhan field. Phase two was expected to involve selling North Field gas to its neighbors, possibly through a Gulf Cooperation Council (GCC) gas grid. Phase three involved exporting to Europe and Asia. Even before the Persian Gulf War, this phase ran into trouble. To justify the investment, Qatar Petroleum (QP) needed two large-scale long-term supply contracts. Despite efforts from QP managing director Jaber al-Marri, contracts were not forthcoming. This switched emphasis to domestic outlets. In 1988, a firm of international consultants presented a plan to QP for developing domestic projects to utilize Qatari gas. Suggestions included an aluminum smelter, a ferro-alloy production plant, methanol production facilities, and expansion of petrochemical and fertilizer operations.

Qatar rapidly expanded its production and exports from North Dome Field. Here are a number of milestones:

  • 1989: Qatar begins production from North Field phase one (Alpha) at rate of 800 million cubic feet (23 million cubic metres) of natural gas per day.
  • 1997: Qatar begins exporting by sending 5.7 billion cubic feet (160 million cubic metres) (0.16 million tons) of LNG to Spain.
  • 2005: Qatar exports a total of 987 billion cubic feet (27.9 billion cubic metres) (27.9 million tons) of LNG. Of this, 316 billion cubic feet (8.9 billion cubic metres) went to Japan, 293 billion cubic feet (8.3 billion cubic metres) to South Korea, 213 billion cubic feet (6.0 billion cubic metres) to India, 161 billion cubic feet (4.6 billion cubic metres) to Spain, and 3 billion cubic feet (85 million cubic metres) to the United States.
  • 2006: Qatar surpasses Indonesia as the world's largest LNG exporter.
  • 2007: In March QP solidifies its leading role when RasGas completes its fifth LNG production train, giving the country 1.5 trillion cubic feet (42 billion cubic metres) of annual liquefaction capacity, the most in the world.[55]

Subsequent phases of the North field development provided feedstock to LNG plants at Ras Laffan Industrial City.

Based on the current Qatar planned projects, production of LNG from North Dome Field may reach to 23 billion cubic feet (650 million cubic metres) to 27 billion cubic feet (760 million cubic metres) per day by 2012, any further increase in the production level of the Qatari side of the field is subject to the result of the ongoing study by Qatar Petroleum which is supposed to be released in 2012.

The prospects for further growth in Qatari gas production beyond 2012 are clouded by the uncertainty created by a moratorium on new export projects, which was imposed in 2005 while the effect of existing projects on North Field reservoirs was studied.[1]

In order to monetize North Dome's vast resources of gas and liquids, Qatar has undertaken ambitious plans for establishment of the world's biggest LNG and GTL industry.

Qatar's LNG industry

Qatar has two LNG companies called Qatargas and RasGas and both are located in the Ras Laffan Industrial Port on the coast of Persian Gulf.[56]

Since 1997, Qatar has been exporting LNG from the North Field. In 2006, Qatar surpassed Indonesia as the world’s largest LNG exporter. Based on the massive gas resources of the field, Qatar is developing the world biggest LNG export facilities in order to reach the capacity of 77 million metric ton per year by 2012 (see table below).[57]

Qatar-lng infrastructure.gif

Qatargas and RasGas are two different companies responsible for the Qataries LNG projects.

Qatar's GTL industry

Oryx GTL (Sasol)

The ORYX GTL plant was commissioned in early 2007, as the first operational GTL plant in Qatar. The plant nameplate capacity is 34,000 barrels per day (5,400 m3/d), however, the plant has faced technical challenges and did not reach full capacity during the first year of operation. Modifications recommended by Template:Sasol assist with overcoming this shortfall and production capacity was reached/ maintained from 2009 onwards. The plant uses 330 million cubic feet per day (9.3×10^6 m3/d) of natural gas from the Al Khaleej Gas project. The ORYX GTL project uses Sasol's Slurry Phase Distillate (SPD) process.[58]

Pearl GTL (Shell)

The project is under construction and will be the world's largest GTL plant which will have the capacity of 140,000 barrels per day (22,000 m3/d) of middle distillates and significant quantities of LPG and condensate. The first of two 70,000 barrels per day (11,000 m3/d) GTL trains is planned to start production in 2011. Around 1.6 billion cubic feet per day (45×10^6 m3/d) of natural gas will be supplied from the North field to the project. Shell has 100% of the equity in the integrated upstream and plant project.[59]

Table 3-North Field Production Plan ( Million Cubic Feet per Day).[60]

Project Start Up 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
QatarGas 1997 860 860 860 860 860 860 860 860 860 860 860 860 860 860 860
QatarGas 1998 430 430 430 430 430 430 430 430 430 430 430 430 430 430
QatarGas 2003 700 700 700 700 700 700 700 700 700
QatarGasII 2008 1700 1700 1700 1700
QatarGasII 2009 1700 1700 1700
QatarGasIII 2009 1700 1700
QatarGasIV 2009 1700
RasGas 1999 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400 1400
RasGas 2004 1000 1000 1000 1000 1000 1000 1000 1000
RasGas 2005 1000 1000 1000 1000 1000 1000 1000
RasGas 2007 1000 1000 1000 1000 1000
RasGas 2008 1700 1700 1700 1700
RasGas 2010 1700 1700 1700
Al Khalij 2005 650 650 650 650 650 650 650
Dolphin 2007 2800 2800 2800 2800 4000
Pearl GTL 2009 1700 1700 1700
Total million cu ft/d 860 1300 2700 2700 2700 2700 3400 4400 6000 6000 9840 13240 18340 20000 23000

Table Sources: QatarGas, RasGas, Qatar Petroleum and internet

See also

References and footnotes

  1. ^ a b c IEA, World Energy Outlook 2008 - Chapter 12 - Natural gas resources and production prospects, p.298
  2. ^ http://www.payvand.com/news/10/jun/1138.html
  3. ^ CEDIGAZ:Current status of status of the World's gas giants
  4. ^ a b http://www.offshore-technology.com/projects/southpars/
  5. ^ "Gas Prospective Areas in the Zagros Domain of Iran and in Persian Gulf Iranian Waters". • Search and Discovery. • (PDF)
  6. ^ H. Rahimpour-Bonab, B. Esrafili-Dizaji, V. Tavakoli (2010) DOLOMITIZATION AND ANHYDRITE PRECIPITATION IN PERMO-TRIASSIC CARBONATES AT THE SOUTH PARS GASFIELD, OFFSHORE IRAN: CONTROLS ON RESERVOIR QUALITY. http://onlinelibrary.wiley.com/doi/10.1111/j.1747-5457.2010.00463.x/abstract
  7. ^ H. Rahimpour-Bonab, B. Esrafili-Dizaji, V. Tavakoli (2010) DOLOMITIZATION AND ANHYDRITE PRECIPITATION IN PERMO-TRIASSIC CARBONATES AT THE SOUTH PARS GASFIELD, OFFSHORE IRAN: CONTROLS ON RESERVOIR QUALITY. http://onlinelibrary.wiley.com/doi/10.1111/j.1747-5457.2010.00463.x/abstract
  8. ^ V. Tavakoli, H. Rahimpour-Bonab, B. Esrafili-Dizaji (2011) Diagenetic controlled reservoir quality of Southnext termprevious termParsnext term gas field, an integrated approach. http://www.sciencedirect.com/science/article/pii/S1631071310002191
  9. ^ a b c d e Jafar Aalia, Jafar., Hossain Rahimpour-Bonaba and Mohammad Reza Kamali. • "Geochemistry and origin of the world's largest gas field from Persian Gulf, Iran". • Journal of Petroleum Science and Engineering. • (Volume 50, Issues 3-4). • March 16, 2006, • pp.161-175.
  10. ^ B. Esrafili-Dizaji and H. Rahimpour-Bonab Effects of depositional and diagenetic characteristics on carbonate reservoir quality: a case study from the South Pars gas field in the Persian Gulf http://pg.geoscienceworld.org/cgi/content/abstract/15/4/325
  11. ^ V. Tavakoli, H. Rahimpour-Bonab, B. Esrafili-Dizaji (2011) Diagenetic controlled reservoir quality of South Pars gas field, an integrated approach. http://www.sciencedirect.com/science/article/pii/S1631071310002191
  12. ^ V. Tavakoli, H. Rahimpour-Bonab, B. Esrafili-Dizaji (2011) Diagenetic controlled reservoir quality of South Pars gas field, an integrated approach. http://www.sciencedirect.com/science/article/pii/S1631071310002191
  13. ^ a b IRAN - The Geology. • APS Review Gas Market Trends. • April 2, 2007
  14. ^ 1 Barrel of crude oil = 5.8 × 106 BTU
  15. ^ Eni World Oil and Gas Review 2006. • ENI.
  16. ^ Qatar Petroleum Annual Report 2005, Page 25
  17. ^ a b c Pars Oil & Gas Company
  18. ^ Qatar Petroleum, Speech by Qatar’s Minister of Energy and Industry, Doha, Qatar, May 5, 2003 [1]
  19. ^ Pars Oil and Gas Company
  20. ^ a b IHS Energy
  21. ^ "Moratorium on North Field development". • The Peninsula Qatar. • May 10, 2006
  22. ^ Cohen, Dave. "Questions About the World's Biggest Natural Gas Field". The Oil Drum. June 9, 2006
  23. ^ World Gas Intelligence Vol.XIX, No.51, December 17, 2008 - Page 4
  24. ^ http://www.payvand.com/news/10/dec/1205.html
  25. ^ http://www.presstv.com/detail/156997.html
  26. ^ Iran Oil Ministry Annual Bulletin, 5th Edition,(available in Persian)(كتاب نفت و توسعه).[2]
  27. ^ a b "Market Profile for Iran", Energy and Electricity Forecast, Economist Intelligence Unit, 18 June 2008 
  28. ^ http://www.turquoisepartners.com/iraninvestment/IIM-Jul10.pdf
  29. ^ http://www.presstv.com/detail.aspx?id=137837&sectionid=351020103
  30. ^ http://www.presstv.com/detail.aspx?id=96060&sectionid=351020103
  31. ^ http://www.presstv.com/detail.aspx?id=124545&sectionid=351020103
  32. ^ http://www.presstv.com/detail.aspx?id=136283&sectionid=351020103
  33. ^ http://www.payvand.com/news/10/dec/1205.html
  34. ^ http://www.payvand.com/news/10/dec/1205.html
  35. ^ http://shana.ir/167834-en.html
  36. ^ http://www.presstv.com/detail/155559.html
  37. ^ http://www.presstv.com/detail.aspx?id=138732&sectionid=351020103
  38. ^ http://www.tehrantimes.com/Index_view.asp?code=229206
  39. ^ http://www.presstv.com/detail.aspx?id=118321&sectionid=351020103
  40. ^ http://www.tehrantimes.com/Index_view.asp?code=229206
  41. ^ a b c http://www.bloomberg.com/apps/news?sid=a.WZSR3OHgLk&pid=20601087
  42. ^ http://www.tehrantimes.com/index_View.asp?code=220734
  43. ^ a b c d e http://www.shana.ir/154657-en.html
  44. ^ http://www.presstv.com/detail.aspx?id=130529&sectionid=351020103
  45. ^ http://rand.org/pubs/monographs/2008/RAND_MG821.pdf
  46. ^ http://www.payvand.com/news/10/jul/1136.html
  47. ^ a b http://www.payvand.com/news/10/aug/1148.html
  48. ^ Shana.ir, NIOC Official News Agency
  49. ^ a b Shana.ir, NIOC Official News Agency
  50. ^ "Repsol, Shell renegotiating Iran gas deal: Repsol company source". • AFP. • May 12, 2008
  51. ^ a b http://www.google.com/hostednews/afp/article/ALeqM5hO8-2zc6BnKaP-2LaqMckSMDa1dg
  52. ^ http://previous.presstv.com/detail.aspx?id=118321&sectionid=351020103
  53. ^ http://www.presstv.com/detail.aspx?id=96548&sectionid=351020103
  54. ^ Fars News Agency, 27 February 2009
  55. ^ EIA Qatar (2007)
  56. ^ Qatar Petroleum [www.qp.com.qa]
  57. ^ Qatar: Natural Gas. • Energy Information Administration (EIA). • United States Department of Energy
  58. ^ OryxGTL.com.qa
  59. ^ Shell.com
  60. ^ QatarGas, RasGas, Qatar Petroleum and Internet

Other sources


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • North Dome Gas Field — #REDIRECT South Pars / North Dome Gas Condensate field …   Wikipedia

  • North Field — can refer to: North Field (Tinian) on Tinian from which the aircraft were launched to drop the atomic bombs on Japan during World War II North Field (Iwo Jima) or Iwo Jima Air Base, a World War II airfield on Iwo Jima in the Bonin Islands and… …   Wikipedia

  • South-Pars-Gasfeld — Lagekarte des South Pars Gasfeldes Das South Pars Gasfeld (engl. South Pars Gas Condensate field), inklusive des Nord Felds oder Nord Gasfelds (engl. North Dome Field), ist das größte bisher entdeckte Gasfeld der Welt, das nicht Teil einer… …   Deutsch Wikipedia

  • Natural gas in Qatar — According to Oil Gas Journal as of January 1, 2011, Qatar s proven natural gas reserves stood at approximately 896 trillion cubic feet (25.4 trillion cubic metres), that is almost 14% of all known natural gas reserves and the third largest… …   Wikipedia

  • Asalouyeh — Infobox Settlement official name = Asalouyeh native name = imagesize = image caption = image map caption = pushpin pushpin label position =bottom pushpin mapsize = 300 pushpin map caption =Location in Iran subdivision type = Country subdivision… …   Wikipedia

  • Oil megaprojects (2014) — This page summarizes projects that propose to bring more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel beginning in 2014. This is part of the Wikipedia summary of Oil… …   Wikipedia

  • Oil megaprojects (2015) — This page summarizes projects that propose to bring more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel beginning in 2015. This is part of the Wikipedia summary of Oil… …   Wikipedia

  • Yacimiento de Urengói — El Yacimiento de gas de Urengói (en ruso: Уренгойское газовое месторождение, Urengóiskoye gasóboye mestorozhdenie), en el norte de la Llanura de Siberia Occidental, en Rusia, es el segundo yacimiento de gas natural tras el de South Pars North… …   Wikipedia Español

  • Oil megaprojects (2008) — This page summarizes projects that brought more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel beginning in 2008. This is part of the Wikipedia summary of Oil Megaprojects.… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”