Crewe and Shrewsbury Railway

Crewe and Shrewsbury Railway
[v · d · e]Crewe and Shrewsbury Railway
Legend
Continuation backward
LNWR Crewe to Manchester Line
Straight track Continuation backward
NSR Crewe to Derby Line
Continuation to left Unknown BSicon "ABZdl" Station on transverse track Unknown BSicon "ABZdr" Continuation to right
Crewe LNWR WCML
Continuation forward Straight track
LNWR North Wales Coast Line to Holyhead
Unknown BSicon "eHST"
Gresty
Unknown BSicon "eHST"
Willaston
Unknown BSicon "eHST"
Newcastle Crossing
Station on track
Nantwich
Unknown BSicon "eABZlf" Unknown BSicon "exCONTl"
GWR Nantwich and Market Drayton Railway to Wellington
Stop on track
Wrenbury
Unknown BSicon "exCONTr" Unknown BSicon "eABZlg"
Whitchurch and Tattenhall Railway to Chester
Station on track
Whitchurch
Unknown BSicon "exCONTr" Unknown BSicon "eABZrf"
Oswestry, Ellesmere and Whitchurch Railway to Chester
Unknown BSicon "eABZlf" Unknown BSicon "exKBSTr"
Prees Heath Army Camp
Stop on track
Prees
Stop on track
Wem
Stop on track
Yorton
Unknown BSicon "eHST"
Hadnall
Unknown BSicon "eABZrg" Unknown BSicon "exKBSTr"
Sentinel Waggon Works
Continuation to left Junction from right
GWR Shrewsbury and Chester Railway
Station on track
Shrewsbury
Bridge over water
River Severn
Unknown BSicon "ABZld" Continuation to right
GWR Shrewsbury and Birmingham Railway
Straight track
(Severn Bridge Junction)
Continuation to left Junction to right
GWR Cambrian Line to Aberystwyth
Continuation forward
Joint Shrewsbury and Hereford Railway


The Crewe and Shrewsbury Railway was a railway owned by the London and North Western Railway (LNWR) company, built to connect Crewe with the jointly owned with the GWR Shrewsbury and Hereford Railway.

Authorised in 1853, planning difficulties accessing the GWR station at Shrewsbury delayed opening until 1858. Proving so successful for both companies to transport coal from the South Wales Valleys to industrial Northwest England, and finished goods in the opposite direction, it was doubled tracked by 1862.

Amalgamated into the London Midland and Scottish Railway in the 1920s, post nationalisation into British Railways, its services reduced as motor transport proved quicker more cost effective than its various branch lines. It now forms the northern section of Network Rail's Welsh Marches Line.

Contents

Background

On 4 July 1837, the Grand Junction Railway opened, linking the four largest cities of England by joining the existing Liverpool and Manchester Railway with the projected London and Birmingham railway. The line, which was the first long-distance railway in the world, ran from Curzon Street railway station in Birmingham to Dallam in Warrington, Cheshire, where it made an end-on junction with the Warrington and Newton Railway, a branch of the L&M. Conceived as a through route, the GJR was not interested in serving towns en-route. Wolverhampton, for instance, was by-passed by half a mile because it did not lie on the intended route.

Having been turned down by Nantwich, a station was built in the township of Crewe which formed part of the ancient parish of Barthomley, on the junction of a turnpike road linking the Trent and Mersey and the Shropshire Union canals. As soon as the station opened it was seen to be at a useful point to begin a branch line to the county town of Chester, facilitated by the 1840 construction of the Chester and Crewe Railway, extended in 1841 to Holyhead to provide the fastest route to Ireland.

In 1845 the GJR merged with the L&B and L&M to form the London and North Western Railway Company, which until its demise in 1923 was the largest company in the world. The new company extended the Warrington line to Lancaster and Carlisle, the Manchester line to Leeds, and built a new line to Shrewsbury to join the now jointly financed with the GWR Shrewsbury and Hereford Railway, which provided connections to South Wales.

Shrewsbury and Hereford Railway

In 1846 Parliament sanctioned an Act of Parliament allowing the new Shrewsbury and Hereford Railway. Built to standard gauge and engineered by Thomas Brassey, the line was to cover 50.5 miles (81.3 km), following an approximate route of the valley of the River Wye.[1]

At its southern end, it would connect the major market town of Hereford with the northern terminals the GWR's Hereford, Ross and Gloucester Railway and the LNWR's Newport, Abergavenny and Hereford Railway, allowing access through to the coal fields and ports of South Wales. A joint Railway Fete occurred on the 6th of December, 1853, when all five companies connecting Hereford ran their first official trains in to the town.

At its northern end, the S&HR connected with the GWR's railways:

However, the major financial gain for both companies was the transport of coal from the South Wales Valleys to industrial Northwest England. At inception, the only way of this occurring was via the S&CR to Chester, so a more direct route was required.

Construction

The Act of Parliament to approve the Crewe and Shrewsbury Railway was approved in 1853. The House of Lords raised objections to the LNWR’s proposed route into the GWR's Shrewsbury station, causing delays while alternative routes were considered.[2]

After approval of a route, the LNWR contracted Joseph Locke and John Edward Errington as engineers, and Thomas Brassey as the civil engineering developer. The 32.5 miles (52.3 km) route was constructed as a single track route, with the in-built option to increase to double track should traffic require. Completed at the budgeted cost of £10,000 per mile, the first train entered Shrewsbury station on the 1st September 1858. It was thus the first railway in North Shropshire.[2]

Operations

The immediate success of the route, particularly revenue from coal traffic, meant the line was authorised to be upgraded to double track, which was completed in 1862.[2]

The line’s success showed other operators the importance of access to Crewe, with the GWR sponsored Oswestry, Ellesmere and Whitchurch Railway (OE&WR) proposed in 1860. Following ferocious arguments between the LNWR and GWR, Parliament authorised building the line in August 1861.[2]

The first phase was restricted to the Whitchurch-Ellesmere section, with the onward section to Oswestry held over for a year in case of new GWR route developments. Engineered by Robert and Benjamin Piercey, the civil engineering contractor was Thomas Savin.[2]

Facilities at Whitchurch were expanded by the LNWR to allow for trains using the new line, with the stations staff numbers reaching over 100 between the two wars. Intermediate stations were built by the OE&WR at Fenn’s Bank, Bettisfield and Welshampton. The first public passenger service left Ellesmere for Whitchurch on 4 May 1863, and construction of the Ellesmere-Oswestry section was completed one year later. The total cost of the line was £200,000.[2]

Following further proposals of railways between Crewe and Chester, by 1864 four companies were operating between Whitchurch and Machynlleth:[2]

In July 1864, the government approved a share holder request that they were amalgamated, granting an Act of Parliament to form the Cambrian Railway. The opening of a last section of line between Borth and Aberystwyth now enabled through trains to run from Whitchurch, a distance of 95.75 miles (154.09 km).[2]

In 1870 the LNWR proposed the Whitchurch and Tattenhall Railway to break the GWR's monopoly on the Shrewsbury to Chester route. Opened in October 1872, little consideration was given to route or revenue, resulting in consistently low traffic volumes and a life-long record of annual losses.[2]

The construction of a British Army World War I training camp at Prees Heath, resulted in the construction of a private 1 mile (1.6 km) branch line, which left the mainline west between Whitchurch and Prees. Used to transport troops, supplies and equipment initially, the site developed as a hospital resulting in return dispersement trains.[2]

In the 1920s amalgamation of British railways, the GWR absorbed the Cambrian Railway, while the LNWR became part of the new London, Midland and Scottish Railway (LMS).[2]

During World War II, Press Heath was developed into a Royal Air Force airfield as RAF Tilstock, still with its own railway depot, barracks and hospital facilities. Despite this, the relatively rural and resultantly dark run of the combined S&HR and C&SR meant that the flow of coal to the industrial Northwest continued virtually unabated.[2]

After the war, the newly nationalised British Railways suffered competition from new road transport competitors, assisted in their efforts by the Ministry of Defenceselling off cheaply former military trucks and coaches. This resulted in a closure of the many branch lines, many before the Beeching Axe of the 1960s, reducing the Whitchurch of today to little more than an unmanned halt.[2]

Today

Presently, the line remains open from Shrewsbury to Crewe, the northern most section of Network Rails Welsh Marches Line.[2]

References

  • Douglas B. Barnard: Transport in the Whitchurch Area, Part II Whitchurch History and Archaeology Group, new edition 1997

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Shrewsbury railway station — Infobox UK station name = Shrewsbury manager = Arriva Trains Wales locale = Shrewsbury borough = Shrewsbury and Atcham code = SHR years = 1848 events = Opened platforms = 5 usage0405 = 1.295 usage0506 = 1.317 usage0607 = 1.343 other name = Welsh …   Wikipedia

  • Crewe railway station — Crewe A Central Trains Class 170 at Platform 2 at the southern end of the station …   Wikipedia

  • Chester and Holyhead Railway — Irish Mail redirects here. For Ireland s national postal service, see An Post. For the Irish newspaper, see Irish Daily Mail. [v · …   Wikipedia

  • Swansea and Mumbles Railway — Legend …   Wikipedia

  • Llynvi and Ogmore Railway — Locale Wales Dates of operation 1861–1873 Successor Great Western Railway Track gauge 4 ft 8 1⁄2 in (1,435 mm) …   Wikipedia

  • Neath and Brecon Railway — [v · d · …   Wikipedia

  • Conway and Llanrwst Railway — The Conway and Llanrwst Railway was a standard gauge railway built to connect the Welsh coastal town of Conway, nowadays addressed by its Welsh name of, Conwy with the inland towns of Llanrwst and Betws y Coed. It opened in 1863 and was… …   Wikipedia

  • Newport, Abergavenny and Hereford Railway — [v · d · …   Wikipedia

  • North Wales and Liverpool Railway — The North Wales and Liverpool Railway (NWLR), was the name given to the joint committee formed to construct a railway between Bidston, on the Wirral Railway and Hawarden on the Manchester, Sheffield and Lincolnshire Railway s (MSLR) Chester… …   Wikipedia

  • Denbigh, Ruthin and Corwen Railway — Legend …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”