Cornell University Satellite

Cornell University Satellite
Cornell University Satellite
Operator Cornell University/AFRL
Major contractors Cornell Space Systems
Mission type Technology demonstrator
Satellite of Earth
Launch date Tentatively Spring 2012
Launch vehicle Tentatively Minotaur IV
Launch site Kodiak Launch Complex, Alaska
Mission duration 6 months
Homepage [1]
Mass 120 lbs
Orbital elements
Regime Low Earth Orbit

The Cornell University Satellite (CUSat) project is a multi-year effort to design, build, and launch an end-to-end autonomous on orbit inspection system. The CUSat system will demonstrate a process through which one satellite can diagnose the structural health and configuration of another; a capability that will benefit commercial, government, and manned space missions envisioned for the coming decades. The space segment consists of two functionally identical satellites that will launch together and separate on orbit in a target-inspector configuration. Once in orbit, CUSat will use microthrust Pulsed Plasma Thrusters (PPTs) and sub-centimeter level accurate Carrier-phase Differential GPS (CDGPS) to navigate the satellites to within ten meters of each other. The inspector satellite will use cameras to gather imagery of the target satellite while performing relative navigation. Target satellite imagery will be transferred to the ground segment where they will be used to reconstruct a three dimensional model for the end user.

CUSat was the winner of the University Nanosat-4 Program which aims to educate the future aerospace workforce and develop new space technologies. As part of this program, CUSat completed environmental testing and other aspects of final I&T in the AFRL Aerospace Engineering Facility at Kirtland Air Force Base. CUSat is working with AFRL to complete the Department of Defense SERB process in preparation for a launch with the Space Test Program.

Contents

Operation Details

Phase One: Launch

CUSat will launch as a secondary payload on a launch vehicle. Once in orbit and in the correct attitude, CUSat will separate from the launch vehicle where it will begin Phase Two - the initialization.

Phase Two: Initialization

Once CUSat separates from the launch vehicle and enters the Initialization Phase, it will enter solar illumination where the spacecraft will power on. The spacecraft will make contact with the Mission Control Center at Cornell through one of several ground stations, beaconing its status. Next, the spacecraft will begin to assess its tumble rates, and will detumble if required. Once stabilized, CUSat will begin commissioning operations. Operators in the MCC will assess the health of most satellite subsystems. Durin this time, the top spacecraft will begin to search for surrounding GPS satellites. A Carrier-phase Differential GPS Lock is then acquired to obtain an accurate attitude solution. The spacecraft will enter Phase Three: Spacecraft Separation.

Phase Three: Spacecraft Separation

Once an attitude solution is obtained, CUSat's actuators will adjust the attitude for a proper separation.

While still in illumination, CUsat is then able to perform a low-shock separation through the use of a lightband into Top and Bottom satellites. After separation, CUSat enters Phase Four: Inspection

Phase Four: Inspection

Once both Top and Bottom satellites obtain a GPS lock, the relative distance between the two will be calculated via CDGPS. When the partner satellite enters an operational camera's field of view, the inspecting satellite will acquire images of the partner satellite. The ground will request specific images, which will be subsequently downlinked from the space segment in the next communication opportunity.

On the ground, the downlinked data will then be used to construct a 3D image of CUSat to verify the CDGPS data.

The Team

Administration

The Principal Investigator for the CUSat project is Dr. Mason Peck. The two advisors for the CUSat project are Dr. Mark Campbell and Dr. Mark Psiaki.

Technical Backgrounds

Because CUSat is an Engineering Project Team at Cornell University, it is composed of a multitude of different students with a variety of abilities and talents. Team members come from such majors as Electrical and Computer Engineering, Mechanical and Aerospace Engineering, Applied and Engineering Physics, Computer Science, Economics and Management, and even Architecture.

CUSat recruits Cornell students with a good technical background and a strong commitment for work, regardless of their level.

Subsystems

There has been a major redistribution of work, into different subsystems since FCR. The current Subsystems are listed below.

ADCNS

The Attitude Determination, Control, and Navigation Subsystem (ADCNS) executes the relative navigation that will be used for CUSat's in-orbit inspection procedures. CUSat will primarily be using three GPS boards for attitude determination. For attitude control, CUSat will be using pulsed-plasma thrusters (PPTs) and reaction wheels. The software portion of ADCNS will consist of the relative navigation algorithms, which will run the various modes of operation defined by the CONOPs.

Camera

The camera team is responsible for acquiring images while in orbit, compressing them in a modified JPEG format, and relaying them to the onboard computer, C&DH.

Command and Data Handling

C&DH is the central hub for communication and computation on the satellite. Using a commercial off the shelf (COTS) single board computer running Windows CE and C++, C&DH will execute the ADCNS algorithms and flight code.

GPS

The GPS team is responsible for the GPS receivers, antennas and algorithms used to calculate sub-centimeter relative positioning.

Ground Segment

The Ground Segment is responsible for the ground operations of the satellite, including ground to satellite communication, tracking and commanding.

Harness

The Harness subsystem is responsible for satellite wiring, the electronics backplane, the electrical interface boards, and any System level electrical concerns.

Industry Relations

The Industry Relations team is responsible for marketing CUSat and seeking commercial and academic sponsorship.

Integration and Testing

The I&T team is responsible for enabling rapid integration and testing of CUSat. I&T is also responsible for testing CUSat in Cornell University's thermal vacuum chamber.

Mechanical Hardware

The Mechanical Hardware team manufactures the satellite structure and manages the design. The structure includes eight isogrid panels as well as numerous electronics board enclosures.

Mission Ops

The Mission Ops team defines the detailed, on orbit operations plan for both CUSat satellites. Operating procedures are defined to match with hardware and mission specifications and help ensure successful execution of the mission.

Power

The power team is responsible for harnessing solar energy, storing it, and distributing it throughout the satellite.

Propulsion

The propulsion team is responsible for CUSat's pulsed plasma thrusters (PPTs) which give each satellite three degrees of translational freedom and three degrees of rotational freedom.

Structures

The structures team is responsible for designing, analyzing, and manufacturing the body of the satellite as well as the logistics of the internal components.

Survivability

The Survivability team is responsible for analyzing and controlling the satellite's thermal, electrical and vibrational environment on the ground, during launch, and in orbit. Analyzed effects include ESD, atomic oxygen effects, venting and outgassing.

Systems

The CUSat Satellite project employs Systems Engineering extensively. The Systems group is largely responsible for providing the project with direction by creating top level system requirements, creating best practices, maintaining communications, making design choices, and creating processes for creating a successful product. Each of the subsystem leads also participates as a member of the Systems group, which allows the project to maintain consistency and focus.

Telemetry and Command

T&C is responsible for intersatellite communications as well as satellite to ground communications. T&C uses modified commercial radios operating in amateur frequency bands to transmit images taken by the satellites to the ground station.

Notes


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Cornell University — Cornell redirects here. For other uses, see Cornell (disambiguation). Cornell University Emblem of Cornell University Motto I would found an institution where any person can find instruction in any study …   Wikipedia

  • Cornell University College of Engineering — Established 1870 Type Private Dean Lance R. Collins …   Wikipedia

  • University of Chicago — University of Chicago …   Wikipedia

  • University of Toronto — This article is about the university s main campus. For other uses, see University of Toronto (disambiguation). University of Toronto Latin: Universitas Torontonensis Motto Velut arbor ævo ( …   Wikipedia

  • University of the Philippines Los Baños College of Forestry and Natural Resources — University of the Philippines Los Baños College of Forestry and Natural Resources …   Wikipedia

  • University of Waterloo — seal Motto Concordia cum veritate Motto in English In harmony with truth Established 1957 …   Wikipedia

  • Israeli Nano Satellite Association — History = In 2004 a group of young space engineers and scientists from leading companies and universities in Israel, started studying nano satellites constellations and applications. INSA the Israeli Nano Satellite Assocoiation was founded in… …   Wikipedia

  • University of California, Santa Barbara — Seal of the University of California, Santa Barbara Motto Fiat lux (Latin) Motto in English Let there be light …   Wikipedia

  • University of Maryland, College Park — University of Maryland redirects here. For other uses, see University of Maryland (disambiguation). Coordinates: 38°59′15.0″N 76°56′24.0″W / 38.9875°N 76.94°W …   Wikipedia

  • University of Oregon — Latin: Universitas Oregonensis Motto Mens agitat molem Motto in English The mind moves the masses …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”