Orbiter Processing Facility

Orbiter Processing Facility
Space Shuttle Columbia at the entrance of an Orbiter Processing Facility

An Orbiter Processing Facility (OPF) was one of three hangars where U.S. space shuttle orbiters underwent maintenance between flights. All three such facilities, OPF-1, OPF-2 and OPF-3, were located at NASA's Kennedy Space Center in Florida at Launch Complex 39.

They were located west of the Vehicle Assembly Building, where the orbiter was mated with its External Tank and Solid Rocket Boosters before transport to the launch pad. OPF-1 and OPF-2 are connected with a low bay between them, while OPF-3 is across the street.

OPF-3 was previously called the Orbiter Maintenance & Refurbishment Facility (OMRF), but was upgraded to a fully functioning OPF.

Contents

Processing flow

Discovery inside OPF-3 following the completion of mission STS-114

When a shuttle mission was completed, the orbiter was towed from the Shuttle Landing Facility to its assigned OPF where it spent several months (typically less than 100 days) being prepared for the next mission. Any remaining payloads from the previous mission were removed and the vehicle was fully inspected, tested, and refurbished.[1]

  • The orbiter's main engines were purged to remove the moisture that was a by-product of liquid oxygen and liquid hydrogen combustion.
  • payload bay doors were opened and any hazardous payloads were processed for safety
  • fuel cells tanks were drained of remaining cryogenic reactants. The oxygen system was rendered inert with gaseous nitrogen and the hydrogen system with gaseous helium.
  • high pressure gases were vented from the environmental control and life support systems.
  • refuse and other waste products including draining of the potable water system were offloaded
  • heat shields were removed from the engines and aft access were opened
  • main engines were locked in place and covers installed.
  • scaffolding was installed around the orbiters aft to allow technicians to access the main engines
  • main engines were removed and transferred to the Main Engine Processing Facility for checkout and service
  • any needed repairs on the orbiter's thermal protection system including the thermal blankets and thousands of tiles were completed.[2]
  • the Orbital Maneuvering System and Reaction Control System pods were possibly removed and transferred to the Hypergol Maintenance Facility for troubleshooting, repair or other services.
  • any modifications to the orbiter were completed in the OPF.
  • After all its flights, the orbiter went through "Down Mission Processing."

Prior to rollout to the Vehicle Assembly Building, several weeks before scheduled launch, the orbiter was prepared for the next mission by installing mission flight kits, payloads, consumable fluids and gases where possible. Remaining payloads, fuels and fluids were installed on the pad closer to launch day. The last step before rollover to the VAB was weighing the orbiter to determine its center of gravity.[1]

Orbiter assignments

OPF-1 is assigned to Discovery, OPF-2 to Atlantis. Endeavour is currently stored in the VAB. OPF-3 is under lease to Boeing for the manufacture and testing of their CST-100 spacecraft.[3]

References

 This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. ^ a b "From Landing to Launch Orbiter Processing". NASA Public Affairs Office. http://www-pao.ksc.nasa.gov/kscpao/nasafact/pdf/orbiterprocessing2002.pdf. 
  2. ^ "Reliable Shuttle Orbiters Need Special Care". United Space Alliance. http://www.unitedspacealliance.com/news/newsletters/issue080/Articles/ReliableShuttleOrbitersNeedSpecialCare.asp. 
  3. ^ Boeing to Build Private Space Taxis in Old NASA Shuttle Hangar

External links

Coordinates: 28°35′09″N 80°39′18″W / 28.585803°N 80.654991°W / 28.585803; -80.654991


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать реферат

Look at other dictionaries:

  • Orbiter Processing Facility — Die Columbia vor der OPF 3 …   Deutsch Wikipedia

  • Orbiter Vehicle Designation — Each NASA space shuttle designation is composed of a prefix and suffix separated by a dash. The prefix for operational shuttles is OV, for Orbiter Vehicle. The suffix is composed of two parts: the series and the vehicle number. Series: 0 Non… …   Wikipedia

  • Shuttle Landing Facility — IATA: TTS – ICAO: KTTS – FAA LID: TTS Summary …   Wikipedia

  • Space Shuttle orbiter — The Discovery orbiter approaches the ISS on STS 121 Operator NASA Mission type Orbiter …   Wikipedia

  • Long Duration Exposure Facility — Template:Infobox Spacecraft Name = Long Duration Exposure Facility Caption = LDEF, shortly before deployment, flies on Challenger s RMS arm over the Florida peninsula. Organization = NASA Major Contractors = ? Mission Type = Satellite Of = Earth… …   Wikipedia

  • Shuttle Landing Facility — Shuttle Landing Facility …   Deutsch Wikipedia

  • Horizontal Integration Facility — A horizontal integration facility is a location within which the stages of a multistage rocket are brought together, before the assembled stack is rolled out to the launch pad and raised into vertical position for launch.CCAFSAt Cape Canaveral… …   Wikipedia

  • White Sands Test Facility — (WSTF) is a rocket engine test facility and a resource for testing and evaluating potentially hazardous materials, space flight components, and rocket propulsion systems. NASA established WSTF on the White Sands Missile Range in 1963. [cite web… …   Wikipedia

  • OPF — Orbiter Processing Facility (Governmental » NASA) **** Official Personnel Folder (Academic & Science » Ocean Science) **** official personnel folder (Miscellaneous » USPS) ** Orthodox Peace Fellowship (Community » Religion) * Official Personnel… …   Abbreviations dictionary

  • OPF — • Orbiter Processing Facility Weltraumfahrt • Miami Opa Locka, FL, USA internationale Flughafen Kennung …   Acronyms

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”