- Japan–Korea Undersea Tunnel
-
The Japan–Korea Undersea Tunnel (also: Korea–Japan Undersea Tunnel, JPN–KOR Tunnel, 한일 해저 터널, and 日韓トンネル) is a proposed tunnel project to connect Japan with Republic of Korea (South Korea) via an undersea tunnel crossing the Korea Strait using the strait islands of Iki and Tsushima, a straight-line distance of approximately 128 kilometers (80 mi) at its shortest.[1]
The proposal, under discussion since 1917, was followed with more concrete planning during the early 1940s. It was not pursued, however, until after World War II. In early 2008 the proposal came under renewed discussions by ten senior Japanese lawmakers who established a new committee to pursue it.[2][3][4] This was followed by a study group from both countries in early 2009 that agreed to form a committee for the creation of specific construction plans.[5] Committee head Huh Moon-do, a former director of South Korea's National Unification Board and also a key member of the former Chun Doo-hwan government, said the tunnel would help regional economics and would "also play a key role in pursuing bilateral free trade talks" that are currently stalled.[4][5][6]
The proposed tunnel would be more than 200 km long and able to serve a portion of the shipments between the two countries, which rose from approximately $40 billion in combined trade for 1999 to just over $89 billion in 2008, as well as some of the 20,000 people who traveled daily between the countries in 2009.[5][6][7][8]
Contents
Proposal history
Early origins
A very early discussion on such a tunnel was conducted in 1917 by then-Imperial Japanese Army General Staff officer and future Prime Minister Kuniaki Koiso.[9] Another early proposal for the project originated in the late 1930s, and was depicted as part of the Greater East Asia Railroad. In 1938, Japan's Ministry of Communications reportedly decided on a preliminary survey of the sea bottom between Japan and Korea, and during the Second World War the Japanese government actively pursued the project in order to connect it with the Korean Peninsula and, ultimately, with the rest of the Asian continent.[10]
In 1939, a Japanese Railway official, Yumoto Noboru, wrote in his book of a trans-Eurasian railway that could link Japan to its Axis partner Germany, and proposed the construction of an undersea tunnel to connect Japan with Korea via the island of Tsushima.[11][12] Such a combined undersea tunnel and land link would help safeguard Japanese communications and shipments to and from Europe, which would be imperiled by a Pacific War. Studies were soon conducted by the Japanese government on a possible Kampu (Shimonoseki-Pusan) tunnel between the Japanese home islands and Korea.[13] The plan came under serious consideration starting in 1941.[12]
In September 1940 the Japanese Cabinet issued its overview "Outline of National Spatial Planning" study which outlined its long-term goals for the development of its occupied conquests and spheres of influence in Asia, which it termed the "Greater East Asia Co-Prosperity Sphere". It further refined its plans with the outbreak of hostilities with the United States, bent on increasing its geopolitical and ethnic ties with mainland Asia through a vastly expanded rail and marine network, with special emphasis on the Korean peninsula land bridge to connect it with its colonies.[12] To achieve its objectives, Japan's plans called for "a giant leap forward" in its transportation and communications infrastructures, including shinkansen trains, so that it could integrate all of its colonial economies and ensure the transport of war materials and other necessary supplies to and from the home islands.[12] This coincided with the planning and development of the dangan ressha ("bullet train") rail system by a Japanese chief rail engineer, Shima Yasujiro, who concurred on the links between Tokyo, Korea, and China.[14][15]
By August 1942, Japan's South Manchurian Railway Company had created plans for an 8,000 km rail network stretching from Manchukuo to Singapore.[12] Against this backdrop, Japan took its first concrete step for a fixed link to and through Korea to connect it with its planned vast rail network in Asia, with the construction of several bridges as well as the completion of its 3.6 km Kanmon undersea railway tunnel joining the Japanese islands of Kyushu and Honshu.
Although preliminary work on rail lines, bridges, and tunnels within southern Japan was started, work on the project stopped within a few years as the nation's economy and infrastructure deteriorated due to the Second World War. After 1943, with increasing shortages of materials, manpower, and even transportation, Japan canceled its Raumordnung (spatial plan) for its vast new Asian rail infrastructure, as it turned its full-time attention to defending its home islands from invasion.[12] Its Land Planning organization was discontinued in 1943 and its staff was transferred to the Japanese Home Ministry.[12][13]
Activities since World War II
The proposal for a fixed link between the two countries has been raised in public discussions numerous times since the end of the Second World War. Leaders of both countries have called for the tunnel's construction on a number of occasions.[11]
Starting in the 1980s a Japanese research group has been engaged in detailed research and exploration of prospective routes for the tunnel. In 1988 the Japanese researchers contracted a Korean company to explore the sea off of Koje to document the region's geological features.[11]
In September 2000 South Korean President Kim Dae-jung said a review should be performed of the project that could enable all of Japan to be linked to Europe, as "a dream of the future." Kim's comments came during a summit meeting with Japan's then-Prime Minister Yoshiro Mori.[11] The following month, Japan's Prime Minister Mori proposed moving ahead with the project at the Seoul summit of the Asia-Europe Meeting (ASEM); however, Korea and Japan stopped short of committing it as an official bilateral project.[11]
By early 2002 the South Korean Ministry of Construction and Transportation had commissioned three research institutes to study the project's feasibility. Also in 2002 Japanese experts had estimated that the tunnel would take 15 years and cost US$77 billion to complete.[11] Around that time (mid-2002), an easing of relations between North and South Korea gave impetus to the Japan–Korea-tunnel project. The North and South Korean governments had agreed on an inter-Korean rail line to run from Seoul to Pyongyang and then on to Sinuiju, a border city in the north on the Yalu River, as well as a road running parallel to the railway.[11] From Sinuiju trains could then cross the border and access the Trans-Chinese Railway (TCR), and then Russia's Trans-Siberia Railway (TSR) which would lead on to all of Europe's rail networks.[11]
In September 2002, a five-member Japanese delegation visited South Gyeongsang Governor Kim Hyuk-kyu of Korea's southeastern provincial government to discuss the proposal of an undersea tunnel. The legislative group from Japan was headed by Daizō Nozawa (野沢太三), a future Japanese Cabinet Minister of Justice who was then a Liberal Democratic Party (LDP) legislator in Japan's House of Councilors. Nozawa, then a key figure involved in Japanese civil engineering projects, also toured Korea's Geoje region. This visit marked a starting point on the contemplated tunnel on the South Korean side, officials at the regional government stated.[11][16] The same month saw comments by Alexander Losyukov, Russia's vice foreign minister for Asia-Pacific affairs, raising discussion on the tunnel project and saying that it was "something for the distant future, but feasible".[11]
The tunnel proposal was again brought forward in the recent era by Japan's 91st Prime Minister Yasuo Fukuda (福田康夫).[17] Later, at an August 2009 meeting of the International Highway Foundation in Japan which was addressed by Huh Moon-doh of South Korea, a video was shown of a half-kilometer long test tunnel excavated from Karatsu toward Korea. The foundation also conducted geophysical research on the sea bottom in the Tsushima and Iki Islands areas. Addressing the congregation Huh stated a serious interest in the project, made more attractive by the economic activity it would generate for both countries in the middle of 2009's deepening economic recession. But Huh also interjected that "....there are still deep and lingering anxieties among Korean citizens over closer connections with Japan," referring to centuries of warfare between the two nations dating back to Japan's invasions of the peninsula in the 16th century, almost mirroring that of Britain and France.[5] Huh also commented on the growing possibility of Chinese economic hegemony in the region which could be blunted by greater South Korean and Japanese cooperation. "The tunnel connecting the two nations would be the very symbol of such cooperation", Huh reiterated.[5]
In October 2009 Japanese Prime Minister Yukio Hatoyama's visited Seoul and had discussions which led to two proposals: an undersea tunnel between Japan and South Korea being one of those. It was announced at the conclusion of his meetings that a research group from the two countries would convene in January 2010 to establish a tunnel building committee.[18] Speaking earlier at the United Nations General Assembly, Hatoyama indicated that the recent changes in Japan would help his nation be a "bridge" to the world. In order to build a unity of nations, Hatoyama wanted to establish an East Asian Community similar to the European Union. An undersea tunnel between the two countries would help establish that unity.[18]
Notable supporters
South Korean President Lee Myung-bak (이명박), inaugurated as president in February 2008, expressed a willingness to consider the project, unlike his immediate predecessor Roh Moo-hyun. Former Japanese Defence Minister and long term Diet member Seishiro Etō was quoted after a meeting with other interested lawmakers from various parties: "This is a dream-inspiring project." and "We'd like to promote it as a symbol of peace-building"[19] Japanese legislators also stated that the tunnel could "...one day allow passengers to travel by rail from Tokyo to London".
Other South Korean presidents who have publicly supported the fixed-link have included Roh Tae-woo and Kim Dae-jung.[9] Japan's former Finance Minister Masajuro Shiokawa also discussed the economic stimulus benefits of large infrastructure programs such as the Channel Tunnel, in light of the grave economic crisis his country and the region was experiencing in 2009.[5]
Former Ministers of Justice Daizo Nozawa, president of the Japan–Korea Tunnel Research Institute, and Kim Ki-Chun, also a former executive member of the Korea-Japan Parliamentarians Union, have been significant supporters of the project, saying: "any engineering challenges [to building the tunnel] can be met with present technology." They also cautioned, however, that "Far more daunting is the historic psychological barrier between the two countries. There is no better way to bring people together than to engage them in a project requiring all their efforts."[6]
Similarly, Professor Shin Jang-cheol of Soongshil University in Korea has also promoted the project, stating that "...the tunnel will stimulate business, ease tension and promote political stability in East Asia. It will also have a positive impact on the reunification of the Korean Peninsula." Shin further commented on the project's positive aspects by noting that it would encourage a joint Free Trade Zone by improving the region's general transportation infrastructure.[6]
A noted long-time proponent of the tunnel project has been South Korea's Sun Myung Moon, the Korean founder and leader of the worldwide Unification Church. Moon proposed a "Great Asian Highway" as far back as 1981, and helped establish the International Highway Construction Corporation (IHCC) to build both it and other transportation infrastructures.[20]
Moon was also the inspiration of the late highly respected Japanese scientist Eizaburo Nishibori, who was a major proponent for the current impetus on the tunnel project.[5] He became motivated upon hearing Reverend Sun Myung Moon's proposal for this tunnel in 1981 at the International Conference on the Unity of the Sciences meeting in Seoul, South Korea. Nishibori subsequently helped organized the Japan–Korea Tunnel Research Institute which has performed major research and assisted in the selection of the three new proposed tunnel routes.[5]
Additionally, in October 2010, a group of 26 Korean and Japanese scholars of the Joint Research Committee for a New Korea-Japan Era, led by Ha Young-sun of Seoul National University and Masao Okonogi of Keio University, released the findings of their study: "A Joint Study Project for the New Korea-Japan Era". The research study made specific policy proposals in order to improve both countries' bilateral relations, and among the study's suggestions was a call to build the undersea tunnel in order to link the two countries together.[21][22]
Proposed routes
An early post–World War II proposal called the "Korea-Japan Friendship Tunnel System", had tunnels running between Korea and Japan, extending from the Korean port city of Busan (connect with Korail) to the Japanese city of Fukuoka on Kyūshū (connect with Sanyo Shinkansen), via four islands in the Strait.
Since approximately 1988 three newer routes have been proposed for the project by the Japan–Korea Tunnel Research Institute Society (founded by the Korean Unification Church), with all three routes having the most eastern point terminating at Karatsu, Saga Prefecture (唐津市, 佐賀県), on the Japanese island of Kyūshū.[11] The proposed western termination points are in the Korean port city of Busan (부산광역시) for one of the routes, and the city of Geoje (거제시) for the other two routes, with all three routes running across the Strait islands of Tsushima and Iki.[11] Combined tunnel-island traverses for the three routes range from 209 to 231 kilometers to cross the Korea Strait (both the eastern Tsushima Kaikyō and the western Busan Strait). Those distances would be far longer than the 50.5-kilometre (31.4 mi)[23] undersea Channel Tunnel which connects Britain to France.
In early 2009 the joint study group stated that the route would almost certainly begin at Karatsu in Japan's Saga Prefecture, and likely travel to Geoje Island on the Korean shore.[4] If the tunnel travels between Karatsu and Geoje, it would span a length of 209 km, with an undersea distance of 145 km, making it the longest such tunnel in the world.[4]
One of the new proposals calls for a combination road and rail link from Karatsu on Kyushu Island and terminating at Busan, the second largest city in South Korea.[9] Of the three tunnel routes under consideration, the favoured design was a combination bridge from Karatsu to Iki Island, followed by a 60 km tunnel to the central portion of Tsushima Island, and then a 68 km tunnel roughly westward to Busan at an estimated cost of approximately 10 to 15 trillion yen ($111 billion to $157 billion).[9]
Other options would see the final tunnel portion constructed from Tsushima to Geojedo Island off the Korean coast, and then to Masan on the peninsula, with two different tunnel designs under consideration. One version would be similar to the Channel Tunnel, which employs a service and emergency tunnel situated between its two train tunnels. The other design would have a single large diameter tunnel for both road and train traffic.[5][9] Long highway tunnels have in the past been criticized for their inherent safety issues involving serious auto accidents, as have been experienced in several European tunnel disasters in the past.
Potential benefits, costs and possible issues
In the mid-1980s, the tunnel's approximate cost was estimated at US$70 billion,[24] with the Japan–Korea Tunnel Research Institute placing it between approximately ¥10 to ¥15 trillion (Japanese Yen).[25] The proposed tunnel project would provide a savings of about 30 percent in costs of transporting goods between the two countries[26]
The tunnel would also benefit passenger travel, with travel times around 5 hours Seoul–Osaka (1040 km) and 7 hours Seoul–Tokyo (1550 km). This would offer South Korea a chance to redefine and expand its lagging tourism industry to include other cities and destinations besides Seoul, as the tunnel would serve as a gateway for tourists to travel with ease to and from the peninsula.[27][28]
By 2002 a preliminary Japanese study had reported that the costs of freight transported through the tunnel would be one fourth of those related to traditional maritime shipping, and that shipments from Japan to Europe, via the Eurasian Land Bridge, would arrive faster than the 20 days for seaborne transport.[11][16]
Others have debated the tunnel project. The Korean news media outlet Chosunilbo reported in 2007 that construction would cost between ₩60 to ₩100 trillion (Korean Won) and take 15 to 20 years to construct. This is more than five times the cost and three times the construction time of the tunnel between Britain and France.[29] Opponents to the project say that Korea would gain little from such a tunnel, which would principally help Japan expand its economic and political influence into the Asian continent.[29]
According to professor Park Jin-hee of the Korea Maritime University, in the period prior to 2007 it cost $665 to ship a 20 foot (6.1 m) container from Osaka to Busan.[30] With an undersea tunnel, the estimated price would drop to $472, a saving of almost 30%.[29] Further economic benefits would be gained if North Korea would permit trains to cross through it into China, from where trains could then access the Trans-Chinese Railway to gain the Trans-Siberian Railway to Europe.
However negative views of the tunnel's profitability also emerged the same year.[24] Japanese Studies Professor Shin Jang-churl, of Seoul's Soongsil University, stated that both countries' political proposals were "....nothing but [empty] diplomatic rhetoric."[24] Key issues for the tunnel would be its enormous construction cost combined with possible low profitability, similar to the Eurotunnel's financial situation since it opened in 1994.[24]
In early 2009, the new joint study group identified that the construction costs alone would be ¥10 trillion by a Japanese estimate, and almost ₩200 trillion by a Korean estimate.[4] A Japanese report also showed the tunnel would not be economically feasible, which was similar to another study conducted by the Koreans.[4]
However the group also pointed out that the tunnel is economically feasible if decision makers also included the effects of job creation and the project's ability to revive the construction industry.[4] Korea would see a ₩13 trillion addition to its construction industry, and Japan's increase would be ₩18 trillion. With industrial effects, the group forecast that Korea would see economic benefits worth ₩54 trillion and ₩88 trillion for Japan.[4]
In 2011, a new study released by South Korea's Land, Transport and Maritime Affairs Ministry, referring to studies by the government's Korea Transport Institute (KTI), reported that the proposed tunnel project, as well as another proposed tunnel project from the northwest of South Korea to neighbouring China (which would bypass North Korea) were both economically non-feasible. The KTI studies cited the estimated combined construction costs for both projects at about ₩100 trillion (approx. US$90 billion), which would produce an extremely low benefit-to-cost result.[31]
Comparison to the Anglo-French Channel Tunnel
In an April 2009 editorial, former Justice Ministers Daizō Nozawa of Japan, and Kim Ki Chun of South Korea, remarked on some of the similarities of the proposed Japan–Korea tunnel to the world's present longest undersea tunnel. The Eurotunnel (officially named the "Channel Tunnel") was created after the Treaty of Canterbury was signed by the United Kingdom and France in 1986, and marked its 15th in-service anniversary in May 2009, after connecting Great Britain to mainland Europe.[32] The Japan–Korea tunnel faces not only technical issues, but similarly the mistrust of two former adversaries created by centuries of conflict. However, the UK and France were able to bridge their political divide and link themselves together, setting the stage for a sea-change in their relationship.[32][33]
The addition of the fixed link to Europe, once believed to be "impossible to build and financially impractical", resulted in numerous positive changes to both the U.K. and mainland Europe. Among the most significant was the loss of a key psychological barrier (akin to an "island mentality"), that previously held back many Britons and other Europeans from travelling to each others nations, according to Kim and Nowzawa.[32]
A veritable new industry subsequently sprang up to serve Britons wanting to buy properties in several European countries. Fifteen years after opening the Channel Tunnel, it was estimated that 300,000 French citizens were living in London, helped in part by reasonably priced Eurostar fares and service that is almost completely immune to bad weather and heavy seas.[32] The Channel Tunnel is seen as an important asset to the entire European Union's infrastructure, placing Brussels less than two hours from central London, with central Paris taking only 25 minutes longer to reach.[34] It has "greatly facilitated integration of the region."[32]
That fixed link allows hundreds of thousands of citizens to move and work more freely in each others countries, and has also allowed for greater economic growth.[32][33] In contrast however, Northeast Asia, also one of the world's fastest growing economies, experiences a lower degree of internal political cohesion partly due to its poorer intraregional transportation links.[35] This observation was similarly noted after a two day meeting in late 2008 by the Japan–Korea Cooperation Committee of business leaders and academics that reported "the undersea tunnel may contribute to the integration process of Northeast Asia".[5]
Politically and economically, both tunnels could be viewed as symbols of regional integration, with former French President François Mitterrand once stating: "The Channel Tunnel... is nothing less than a revolution...."[35]
Nozawa and Kim further claimed that the Channel Tunnel was instrumental in redirecting how the peoples of different cultures and nationalities view each other, something they hope that the Japan–Korea fixed link will also accomplish in order to reverse centuries of conflict and mistrust between their two countries.[32] As with the Channel Tunnel, the Japan–Korea tunnel would be regarded as a prime political symbol, and proof of intraregional cooperation.[18][35]
For the Japan–Korea fixed link project to proceed, it must also, after decades of informal talks and private research, similarly move into formal bilateral discussions and agreements.[32]
Associated difficulties
Societal
Both the Japanese and the South Korean publics have reservations toward closer links with each other due to various reasons, which political leaders are sensitive to. Among the reasons: some South Koreans still have strong memories of the Japanese occupation of Korea from 1910–1945.[24] Urban Planning Professor Hur Jae-wan of Seoul's Chung-Ang University argued that for the tunnel to become politically viable it would be essential for the project to gain significant support from both country's citizenry, stating:
- The Japanese hold a xenophobic nationalism that they are different from other Asian countries. The South Koreans, in contrast, believe they were victimized by the Japanese and harbor suspicion about Japan's expansionism and think the tunnel might lead the South Korean economy and culture to be absorbed into Japan's.[24]
In the mid-2000s, disputes over history, territory and policies aimed at North Korea had brought the two country's relations to a low point, and deepened their mistrust in each other. Professor Shin Jang-churl of Soongsil University in Seoul advised that it was essential for consensus to be reached by both Japanese and South Korean nationals on the relevant issues that divided them.[24]
Political
South Korean experts have advised caution in proceeding with the project due to worries of possible Japanese economic and political hegemony in Asia, made possible in part by the logistical advantages the tunnel project would provide.[11]
In the early 2000s Japan's relationship with South Korea soured when Japanese Prime Minister Junichiro Koizumi visited his country's Yasukuni shrine several times, an action deemed offensive to many Koreans. Another contentious issue may be the territorial dispute over the Liancourt Rocks islets/Dokdo located to the northeast of the strait, which are claimed by Japan but have been administrated by the South Korean government since 1952, and are currently occupied by their coast guard, police and lighthouse personnel.[17] South Korea's Coast Guard personnel first occupied the islets in 1953, with more permanent facilities built by South Korea over the next several years.[36][37]
Logistical issues affecting economics
One issue that would arise if North Korea would agree to permit rail traffic through its territory to the People's Republic of China and then onto Russia and Europe via the Trans-Chinese Railway (TCR) and the Trans-Siberia Railway (TSR),[38] is that of different rail gauges (break-of-gauge). While China and the two Koreas use standard gauge (1435 mm width between rails), Japan mainly uses Cape gauge (1067 mm). Japan also uses standard gauge only on the Shinkansen lines and a few other passenger railways. Moreover, if the rail system is eventually connected to the Trans-Siberian Railway, Russian gauge (1520 mm) also needs to be considered.
However the railroad industry has developed various methods and technologies to mitigate the cost impact of the break-of-gauge issue by reducing the need for multiple gauge rail lines. Additionally it is highly likely that Japan would favour using shinkansen gauge to allow for faster journeys through the tunnel.
As well as gauge issues, there would likely be substantial non-technical barriers –including different railway regulators, border controls, and nationalistic trade policies.
See also
- Break-of-gauge
- Greater East Asia Railroad (大東亜縦貫鉄道)
- Japan–Korea relations
- Korea Train Express (KTX Bullet Trains)
- Sakhalin-Hokkaidō Tunnel – a proposed Russia–Japan undersea tunnel, a possible competitor to the Japan–Korea tunnel project
- South Manchuria Railway (南満州鉄道株式会社 Südmandschurische Eisenbahn Ferrocarril del Sur de Manchuria Южно-Маньчжурская железная дорога 남만주 철도)
- Trans-Asian Railway
- Trans Global Highway/Japan–Korea Tunnel
- Trans-Siberian Railway
- Transloading
- Tunnel boring machine
- Seikan Tunnel
- Shinkansen (Japanese Bullet Trains)
- Undersea tunnel
References
- Notes
- ^ Sullivan, Walter. Progress In Technology Revives Interest In Great Tunnels, New York Times, June 24, 1986. Retrieved August 15, 2010.
- ^ Japan-Korea Undersea Tunnel May Join Old Rivals, Inventorspot.com, 2008-02-19, retrieved: March 17, 2008
- ^ Japanese Lawmakers Eye Underwater Train to South Korea, Agence France-Presse, February 15, 2008, retrieved March 17, 2008
- ^ a b c d e f g h Korea-Japan Tunnel Finally in Sight, English.Chosun.com, February 21, 2009, retrieved April 3, 2009
- ^ a b c d e f g h i j Yamazaki, Hiroshi (August 10, 2009). "Is it time for Japan-South Korea tunnel?". UPIAsia.com website. http://www.upiasia.com/Society_Culture/2009/08/10/is_it_time_for_japan-south_korea_tunnel/9918/. Retrieved August 11, 2009.
- ^ a b c d Do Je-hae. Korea-Japan Tunnel Project Faces Hurdles, Korea Times, January 24, 2010. Retrieved June 19, 2010.
- ^ Japan-Republic of Korea Relations: Economic Relations, Ministry of Foreign Affairs of Japan website
- ^ Park, Ki-Im Towards a Productive Korea-Japan Relationship, Korea International Trade Association, August 17, 2009. Retrieved from the Korea Herald, September 18, 2009.
- ^ a b c d e CourierMail, 2009 Osedo, Hiroshi (March 20, 2008). "Japan to link to South Korea via undersea tunnels". CourierMail.com.au website. http://www.news.com.au/couriermail/story/0,23739,23404059-5012766,00.html. Retrieved August 11, 2009.[dead link]
- ^ Japan Planning Tunnel 80 Miles Long to Korea, New York Times, pg. 11, December 21, 1938 (subscription)
- ^ a b c d e f g h i j k l m n Anderson, Damian J. (2003) Korea-Japan Undersea Tunnel Project Spotlighted Anew, retrieved online April 21, 2009 at KoreaTimes National, January 17, 2003.
- ^ a b c d e f g Charles K. Armstrong, Samuel S. Kim, Gilbert Rozman, and Stephen Kotkin (2005) Korea at the Center: Dynamics of Regionalism in Northeast Asia, M.E. Sharpe, 2005, pg. 103–105, ISBN 0765616564, ISBN 9780765616562.
- ^ a b Harada, Katsumasa. Technological Innovation and the Development of Transportation in Japan: Chap. 6: Transportation during Wartime (1938–1945): Policy, United Nations University Press, 1993. Retrieved from IDE-JETRO website, November 4, 2010.
- ^ Hood, Christopher P. "Bullets and Trains: Exporting Japan’s Shinkansen to China and Taiwan", Asia-Pacific Journal: Japan Focus website. Retrieved 2009-8-31.
- ^ Hoshikawa, T. (ed.) "The Unhappy Birth of a Tunnel (Shinkansen Zenshi, TÅkyÅ: Gakken)." Japan Quarterly, Vol. 32, No. 3, 2003, p.324-326.
- ^ a b Project of S. Korea-Japan Undersea Tunnel Grabs New Spotlight, AsiaPulse News, October 2, 2002, accessed online via Goliath online April 21, 2009.
- ^ a b Japan proposes 'peace' tunnel to South Korea, Guardian Online, February 15, 2008, retrieved March 18, 2008
- ^ a b c Cazzaniga, Pino (October 13, 2009). "Japan and South Korea Increasingly Closer: The Two Nations Are Now Planning The Future Together: An Underwater Tunnel, A Common History Book...". Japan: AsiaNews.it. http://www.asianews.it/index.php?l=en&art=16568&size=A. Retrieved December 4, 2009.
- ^ Japan Lawmakers Want "Peace Tunnel" to South Korea, Reuters, Feb 15, 2008
- ^ The Proposal for Constructing an "International Highway", Terug website, retrieved April 3, 2009.
- ^ Moon, Gwang-lip. Scholars Say Annexation of Korea by Japan Coerced, JoonAng Daily, October 23, 2010. Retrieved October 25, 2010.
- ^ Japan–Korea Undersea Tunnel, Dong-A Ilbo, October 23, 2010. Retrieved October 25, 2010.
- ^ Institute of Civil Engineers p. 95
- ^ a b c d e f g Korea-Japan Undersea Tunnel Project Hits Snag on Anti-Tokyo Sentiment, Low Profitability, YON – Yonhap News Agency of Korea, February 22, 2007, retrieved April 22, 2009 via AsiaPulse via AccessMyLibrary.com (subscription).
- ^ Japan–Korea Tunnel Research Institute website, Jan 2009
- ^ Dig It!, Japundit.com, May 12, 2007, retrieved March 17, 2008.
- ^ Korea-Japan Tunnel, Koreatimes.co.kr, March 19, 2009.
- ^ Hogan, George (2009) Korea-Japan Tunnel, retrieved April 22, 2009 from The Korea Times online, March 12, 2009 (article provides commentary on the potential benefits to the tourism industry)
- ^ a b c Experts Argue Over Korea-Japan Undersea Tunnel, Digital Chosun Ilbo, English Edition, May 11, 2007.
- ^ Experts Argue Over Korea-Japan Undersea Tunnel (revised), Digital Chosun Ilbo, English Edition, May 11, 2007. Note: When originally issued, this article erroneously stated a container dimension of "20 cubic feet". The Digital Chosun Ilbo's editorial staff subsequently revised the description to read "a container (20 feet)", meaning a "20 foot length container". The revised article was posted online between April 10–22, 2009, however the article's date was unrevised and the revision was not further noted.
- ^ Seoul Says Undersea Tunnels With Japan, China Economically Infeasible, Yonhap News Agency, January 4, 2011. Retrieved January 5, 2011.
- ^ a b c d e f g h Nozawa, Daizo & Chun, Kim Ki, Tunnel to link Korea and Japan? Undersea Project Promises Improved Contact, Stabler Relations, Washington Times, April 13, 2009.
- ^ a b Vandore, Emma & Katz, Gregory (2009) Channel Tunnel marks 15th anniversary – in black, Associated Press, May 10, 2009. Retrieved May 11, 2009
- ^ Jolly, David (2009) Eurotunnel Pays a Dividend, Its First, New York Times, March 4, 2009. Retrieved May 11, 2009.
- ^ a b c Hur, J. (1997) "The Japan-Korea Underwater Tunnel Project: Its differences from and Similarities to the Channel Tunnel", Regional Studies, June 1997, Vol.31, No.4, pp.431–434.
- ^ Wikipedia article on Liancourt Rocks previously quoted: "On January 12, 1953, the Government of South Korea ordered the army to enforce their claim on the island, and in the same year on April 20, South Korean volunteer coast guards set up camp on the island. On June 27, 1953, two Japanese coast guard vessels landed on the East Islet, drove off the Korean guards and set up a territorial marker, but did not attempt permanent occupation. The Koreans soon returned and several armed skirmishes followed, leading to the sinking of a Japanese ship by Korean mortar fire on April 21, 1954."
- ^ "Liancourt Rocks / Takeshima / Dokdo / Tokto", Globalsecurity
- ^ AsiaPulse News. Project Of S. Korea-Japan Undersea Tunnel Grabs New Spotlight, AsiaPulse News, October 2, 2002.
- Bibliography
- Armstrong, Charles K.; Kim, Samuel S. & Rozman, Gilbert & Kotkin, Stephen (2005). Korea at the Center: Dynamics of Regionalism in Northeast Asia. M.E. Sharpe. ISBN 9780765616562. http://books.google.com/books?id=RJ8uGmLb_RcC.
Further reading
- Chosun Ilbo. Korea-China Tunnel Could Generate W275 Trillion, Chosun Ilbo, October 9, 2009.
- Fumihiko, Ito(Penta-Ocean Constr. Co., Ltd.), Keiichi, Kobayashi(Taisei Corp.), Takashi Kashima(Japan Railway Constr. Public Corp.), Yoichi, Wakasugi(Penta-Ocean Constr. Co., Ltd.), Kazuhiko Daito(Chizaki Kogyo Co., Ltd.), (1999) Construction of submarine railway tunnel with "tenoned segments of largest diameter made in Korea", Accession number 99A0878939, Proceedings of Annual Conference of the Japan Society of Civil Engineers. Journal Code: S0330B, Vol. 54, pgs.122–123, published in Japanese;
- Kim, D.H and W.H. Park, W.H. Experiment by Using Reduced Scale Models for the Fire Safety of a Rescue Station in Very Long Rail Tunnel in Korea, Track and Civil Engineering Research Department, Korea Railroad Research Institute, Republic of Korea, published online February 24, 2006.
- Yamazaki, Hiroshi. Is It Time For Japan-South Korea Tunnel?, Hiroshi Yamazaki, UPI, 2009-08-10
External links
- Japan–Korea Tunnel Research Institute (Japanese)
- Korea-Japan Undersea Tunnel Promotion Association (日韓海底トンネル推進議連) (machine translated to English)
- Japan–Korea Tunnel Conference (machine translated to English)
- History of the International Highway Project International Highway Construction Corporation (IHCC) website, retrieved 2009-04-07
Eurasian Land Bridge Trans-Siberian Railway • New Eurasian Land Bridge • Northern East West Freight Corridor • Trans-Asian Railway • Trans-Eurasia Logistics • Bering Strait crossing • Japan–Korea Undersea TunnelCategories:- Proposed undersea tunnels
- Japan–Korea relations
- Railway tunnels in Japan
- Coastal construction
- Transport in South Korea
- Rail transport in South Korea
- Rail transport in Japan
- Water transport in South Korea
- Tunnels in South Korea
- Unification Church political involvement
- Proposed transport infrastructure in Asia
- Proposed transport infrastructure in Japan
- Proposed transport infrastructure in South Korea
- Japan–South Korea border
Wikimedia Foundation. 2010.