- North–South railway
-
North-South line overview LegendHannover Hbf High-speed railway to Göttingen see Hanoverian Southern Railway High-speed railway from Hannover Göttingen former Hanoverian Southern Railway to Kassel High-speed railway to Kassel see connecting line of 1867 Halle–Kassel railway from Halle Eichenberg Halle–Kassel railway to Kassel see connecting line of 1876 Frederick William Northern Railway from Kassel Bebra Frederick William Northern Railway to Gerstungen see Bebra–Fulda railway High-speed railway from Kassel Fulda High-speed railway to Würzburg see Kinzig Valley Railway (Hesse) Flieden to Schlüchtern (see below) Elm see Connecting line of 1872 Link from/to High-speed railway Main–Spessart railway from/to Hanau Gemünden am Main see Main–Spessart railway High-speed railway from Fulda Würzburg Hbf Flieden–Frankfurt branch Legendfrom Fulda (see above) Flieden from/to Elm (see above) Schlüchtern see Kinzig Valley Railway (Hesse) Main–Spessart railway from Gemünden Hanau Hbf see Kinzig Valley Railway (Hesse) Frankfurt (Main) Hbf The North–South railway (German: Nord-Süd-Strecke) is an amalgamation of several railway lines in Germany that came to significant importance in West Germany and are therefore commonly regarded as a single entity. During the division of Germany, it was the most important and the most densely used long-distance line of the Deutsche Bundesbahn. Since 1991, after the opening of the Hanover–Würzburg high-speed railway, the line mainly sees local passenger trains, freight trains and night services, as the long-distance services almost exclusively use the new line.
Contents
History
The single lines on the route were quite notable, however the long-distance traffic Hanover–Fulda–Frankfurt/Würzburg was negligible. Most trains between Hanover and Frankfurt were routed via Kassel and the Main-Weser Railway, and many trains to Bavaria ran via Leipzig/Halle and the Saal Railway line.
Post-1945
The situation changed drastically after World War II – Germany was divided in half, and, owing to the Wanfried Agreement, all of the lines forming the North-South line were situated inside West Germany. As the connection via Leipzig and Halle was no longer available, the lines had to carry most of the traffic, which had shifted from Germany's previous East-West orientation. Providing a convenient bypass around the GDR, the lines also took international trains like the Copenhagen to Vienna expresses. The Deutsche Bundesbahn favoured the faster connection via Hanover, Fulda and Würzburg over the Main-Weser Railway which had the disadvantage of the terminal station in Kassel, among others. With the Main-Weser Railway taking most of the freight traffic, the passenger traffic on the North–South railway increased steadily in the 1950s and 1960s.
The line saw massive investments, among them the 1963 electrification. The maximum speed was increased wherever possible, with several stretches of line permitting speeds of 160 km/h and 200 km/h on some short stretches between Gelnhausen and Hanau. However, other places like Eichenberg or Bebra became severe bottlenecks, only permitting speeds of 100 km/h or even lower.
It was foreseeable since the 1960s that the existing railway line would be too overloaded and too slow for the traffic demand expected in West Germany. The situation worsened when the InterCity service was introduced in 1972 and 1979, and the old line was amended by the Hanover-Würzburg high-speed rail line, whose Fulda-Würzburg part opened in 1988, the Hanover-Fulda part following in 1991.
Since 1991
The ICE trains from and to Hanover use the high-speed line north of Fulda. Trains going to Frankfurt use the Frankfurt branch of the old line. The section Bebra-Fulda sees ICE services from Dresden to Frankfurt.
Between Göttingen and Hanover, the former InterRegio services now run as InterCity trains, calling at Alfeld, Kreiensen and Northeim.
Other than that, the Nord-Süd-Strecke sees almost exclusively RegionalExpress and RegionalBahn trains as well as a high number of freight trains. Some night trains operated by DB NachtZug use the line at night to prolong travel times to prevent a too early arrival at their destination.
Route
The North–South Line is made up of several historically developed railway lines:
Hannover–Göttingen–Friedland
Main article: Hanoverian Southern RailwayThe section from Göttingen is part of the Hanoverian Southern Railway that was opened in 1854 (Hanover–Kassel–Marburg–Frankfurt am Main). Important stations are Alfeld (Leine) and Northeim. In 1867, a branch line via Friedland was built to Arenshausen to connect the Halle-Kassel Railway with Göttingen and the Southern Railway (Südbahn). This part of the line mostly runs in the Leine river valley.
Friedland–Bebra
Main article: Bebra–Göttingen railwayIn 1876, after Prussia had annexed the Kingdom of Hanover and Kurhessen, the Prussian railways built a connection between the Hanoverian Southern Railway and the Frankfurt–Bebra railway via Bad Sooden-Allendorf and Eschwege. Near Eichenberg and Cornberg, four tunnels had to be built.
Bebra–Fulda–Frankfurt am Main
Main articles: Bebra–Fulda railway and Kinzig Valley Railway (Hesse)The line was opened in 1868 as the Frankfurt–Bebra railway. The section from Hanau and Fulda is now known as the Kinzig Valley Railway and the section between Fulda and Bebra is known as the Bebra–Fulda railway. Between Bad Hersfeld and Fulda, it leaves the valley of the Fulda. Originally, the line connected Flieden to Elm using a zig zag, then went down again to Schlüchtern. This section has been cut off since 1914 by the Distelrasen Tunnel. From Schlüchtern, the line follows the Kinzig river, ultimately leading to Frankfurt via Gelnhausen and Hanau. Between Hanau and Frankfurt there are two lines, the north bank line and the south bank line.
Flieden–Gemünden
Main article: Flieden–Gemünden railwayThe Flieden–Gemünden railway, built in 1872, is a very curvy line that is rich in tunnels. It leads through the valleys of the rivers Fliede, Kinzig and Sinn, following the Sinn until it meets the Main near Gemünden.
Gemünden–Würzburg
Main article: Main-Spessart RailwayTraffic on the North–South Line uses the Main-Spessart Railway, which mostly runs in the valley of the Main river between Gemünden and Würzburg.
References
- This article incorporates information from the revision as of 2007-01-26 of the equivalent article on the German Wikipedia.
External links
- There is a relevant English-language forum at Railways of Germany
Categories:- Railway lines in Lower Saxony
- Railway lines in Hesse
- Railway lines in Bavaria
Wikimedia Foundation. 2010.