Munich–Garmisch-Partenkirchen railway

Munich–Garmisch-Partenkirchen railway
München–Garmisch-Partenkirchen
Route number: 960 (München–Innsbruck)
999.6 (S 6 München–Tutzing)
Line number: 5504
5540 (S-Bahn Hauptbahnhof–Gauting)
Line length: 100.6
Gauge: 1435
Voltage: 15 kV, 16.7 Hz AC
Maximum speed: 160
Legend
Unknown BSicon "tSTR"
Trunk line from München Ost
Unknown BSicon "tSHST"
0.0 Munich Hbf
Exit tunnel Head station
Munich Hbf, platforms 27-36
Unknown BSicon "SBHF" Straight track
0.8 München Hackerbrücke
Unknown BSicon "SBHF" Straight track
1.6 München Donnersbergerbrücke
Junction to left Unknown BSicon "KRZt"
to Holzkirchen
Straight track Junction to left
2.0 Neuhausen junction to Regensburg and Ingolstadt
Unknown BSicon "eSHST" Straight track
2.9 München Hirschgarten
Unknown BSicon "SBHF" Straight track
4.1 München-Laim
Unknown BSicon "SBHF" Station on track
7.4 München-Pasing 527 m
Junction to right Junction to right
to Augsburg and Fürstenfeldbruck
Unknown BSicon "SHST" Straight track
8.9 München Westkreuz 530 m
Junction to right Straight track
S-Bahn S8München S8.svg to Herrsching
Unknown BSicon "SHST" Straight track
11.3 Lochham
Unknown BSicon "SHST" Straight track
12.4 Gräfelfing 548 m
Unknown BSicon "SBHF" Non-passenger station/depot on track
14.1 Planegg 556 m
Unknown BSicon "SHST" Straight track
15.8 Stockdorf
Unknown BSicon "SBHF" Non-passenger station/depot on track
18.9 Gauting 584 m
Unknown BSicon "BS2l" Unknown BSicon "BS2r"
Unknown BSicon "eBHF"
23.5 Mühlthal (Oberbay)
Unknown BSicon "eSHST"
23.7 Mühlthal (Oberbay) 621 m
Unknown BSicon "SHST"
26.7 Starnberg Nord
Unknown BSicon "SBHF"
27.9 Starnberg 587 m
Unknown BSicon "SHST"
32.7 Possenhofen 630 m
Unknown BSicon "SHST"
34.8 Feldafing 648 m
Unknown BSicon "SBHF"
39.6 Tutzing S6München S6.svg teminus 612 m
Junction to left
to Kochel am See
Unknown BSicon "eBHF"
43.7 Diemendorf (closed for passengers 1984) 622 m
Non-passenger station/depot on track
48.9 Wilzhofen (closed for passengers 1984) 565 m
Junction from right
from Geltendorf
Station on track
53.5 Weilheim (Oberbay) 561 m
Junction to right
to Schongau
Non-passenger station/depot on track
57.3 Polling (closed for passengers 1984) 566 m
Station on track
62.0 Huglfing 595 m
Station on track
69.3 Uffing am Staffelsee 666 m
Station on track
74.9 Murnau 692 m
Unknown BSicon "BS2+l" Unknown BSicon "BS2+r"
Unknown BSicon "KRZu" Track turning right
to Oberammergau
Unknown BSicon "BS2l" Unknown BSicon "BS2c3"
Non-passenger station/depot on track
77.9 Hechendorf (closed for passengers 1984)
Station on track
81.1 Ohlstadt 636 m
Station on track
85.4 Eschenlohe 636 m
Station on track
91.9 Oberau 653 m
Non-passenger station/depot on track
95.8 Farchant (closed for passengers 1984) 671 m
Station on track
100.6 Garmisch-Partenkirchen 708 m
Straight track
Connection to Zugspitze Railway
Unknown BSicon "ABZrl"
to Kempten and Innsbruck

The Munich–Garmisch-Partenkirchen railway is a single track, electrified main line railway in the southern part of the German state of Bavaria. It runs from Munich via Starnberg and Murnau to Garmisch-Partenkirchen. The first part of it was opened in 1854 and is one of the oldest lines in Germany.

Contents

Route

The line runs for 7.4 km from the Starnberg wing of Munich Hauptbahnhof to Munich-Pasing station. The route to Tutzing runs parallel to S-Bahn line S6. North and south of Starnberg the line follows the shore of Lake Starnberg, where the Alps can be seen. The S-Bahn line ends in Tutzing. The single-track, electrified Kochelsee line branches off to the southeast to Kochel. South of Tutzing the line leaves the shore. At Weilheim, the Ammersee line joins from the northwest and the Weilheim–Schongau line diverges to the southwest. The line continues to the region around Lake Staffel and Murnau, where it runs under the overpass of the Ammergau line to Oberammergau. At Ohlstadt the line enters the tourism-dominated Alpine region. The end of the line is reached in Garmisch-Partenkirchen, where the line continues as the Mittenwald line with views of Karwendel and Wetterstein. Alternatively, the Außerfern line and Zugspitz line connect with other alpine destinations.

History

Construction to Starnberg

The line from the Starnberg Station in Munich via Pasing to Planegg was built in accordance with an agreement of 5 November 1853 between the Royal Bavarian State Railways (German: Königlich Bayerische Staats-Eisenbahnen; K.Bay.Sts.B.) and the architect Ulrich Himbsel and opened on 21 May 1854. Between Munich and Pasing the line was duplicated and shared with the Munich-Augsburg Railway Company. The line was extended to Gauting on 16 July, to Mühlthal on 16 September and to Starnberg on 28 November 1854. On 1 January 1862 the line was purchased by the Bavarian government, which had previously leased and operated it.

Munich–Peißenberg Railway

The continuation of the line from Starnberg, was built and operated by the town of Weilheim under a concession. The line was extended to Tutzing on 1 July 1865 and via Weilheim to Unterpeißenberg (on the modern Schongau line) on 1 February 1866. It was later extended to Schongau. The line was used for the transport of anthracite mined in Peißenberg and Penzberg.

Weilheim–Murnau local railway

On 8 May 1874 the Murnau Reichstag deputy Emmeran Kottmüller founded a railway committee with the aim of building a Vizinalbahn (literally a "local railway", a railway built by a local community with a state subsidy under a Bavarian law of 1869) from Weilheim to Murnau. The business community of Murnau and the surrounding communities raised enough capital to bring the proposal before the Bavarian parliament in the autumn of 1875 and it was approved on 10 July 1876. The line was opened on 15 May 1879. In 1898 the line was upgraded to allow a maximum speed of 30 km/h.

In 1898, the Ammersee line was opened connecting with the Munich–Garmisch-Partenkirchen line in Weilheim.

Murnau–Garmisch-Partenkirchen

The line was continued to the south by a private railway company, Lokalbahn AG (LAG), which was granted a concession by the then still independent town of Partenkirchen on 23 September 1888 to build and operate a local railway from Murnau. The 25.7 km-long single-track line was opened after a construction period of only 9.5 months on 25 July 1889. The station was located in Partenkirchen from the beginning and was renamed Garmisch-Partenkirchen, when the two municipalities were merged in 1935. Through coaches operated from the beginning from Munich and in 1900 the first Munich-Garmisch–Partenkirchen express was introduced. At the turn of the 20th century plans to build a railway line between Garmisch-Partenkirchen and Innsbruck were advanced and on 22 November 1904 a treaty was signed by Bavaria and Austria. On the Bavarian side construction and operations would be performed by the K.Bay.Sts.B. The LAG was not willing to pay for the necessary upgrade of its route from Murnau to Garmisch-Partenkirchen and it entered into negotiations with the K.Bay.Sts.B. This ended with K.Bay.Sts.B.'s purchase of the LAG’s infrastructure on 1 January 1908 for 3.5 million gold marks and the subsequent upgrade of the line. In 1911/1912 the current Garmisch-Partenkirchen station was built west of the Partnach river.

Electrification

The Mittenwald Railway from Innsbruck to Garmisch, which was completed in 1919, was from the beginning planned as a electrified line, and so from 25 April 1913, electrical operations in Garmisch commenced. About a month later, electrical operations were extended to Murnau. It was not until 1924, with the commissioning of the Walchensee Hydroelectric Power Station, that the long-standing electrification plans were pursued. On 3 December 1924, electrical services commenced on the Garmisch-Murnau route and on 5 January 1925 they were extended to Weilheim. On 16 February electrical services continued to Starnberg and on the night of 19/20 February 1925 the first electric train made a test run to Munich Hauptbahnhof. On 21 February the first electrically hauled train–an express–ran to Munich from Garmisch and after 23 February all passenger trains on the route operated electrically. The commissioning of electrification between Murnau and Munich therefore only required 45 days in total.

Track doubling

In 1933 the Garmisch-Murnau line was reclassified as a main line. The line had to be upgraded for the 1936 Winter Olympics to be held in Garmisch-Partenkirchen. Since the Murnau–Garmisch section was built as a local railway, it needed to be upgraded in a short period of time. The section had especially sharp bends and weak bridges. There were more problems on the Hechendorf-Murnau section, including a 2.6 % grade, which sometimes required trains had to be so assisted by pusher locomotives. This involved complex movements with the pusher locomotive having to return to the bottom of the steep section on the single track section. For these reasons, on 26 and 27 March 1935 the management board of Deutsche Reichsbahn (German Railways) agreed to the duplication of the Huglfing–Hechendorf section. The upgrade would need to be completed by the beginning of winter 1935 in order to be ready for the 1936 Winter Olympics. In addition to the second track, the original track has been improved, curves had to be widened and the stations at Huglfing, Uffing, Murnau and Hechendorf had to be upgraded considerably. On 18 December 1935 the upgraded section was put back into service, although this required large structures such as a six metre-high bridge over Highway 2 and the reconstruction of the bridge where the Oberammergau line crosses the line in Murnau. The second track in the Huglfing-Murnau section was dismantled in 1942 and 1943 as a result of the war. Ballast and sleepers from the line were used in the conversion of the Oberammergau line to the standard German electrical system in 1954. The Murnau–Hechendorf section is still operated as two lines. The upgrading of the line in 1935 increased the line speed between Tutzing and Murnau from 80 to 110 km/h and between Murnau and Garmisch-Partenkirchen from 55 to 80 km/h.

From 1980

In the early 1980s the Diemendorf, Wilzhofen, Polling, Hechendorf and Farchant stations had low patronage and in June 1984 they were closed together with the Planegg and Gauting stations, which, however, continued to be served by the Munich S-Bahn. Wilzhofen, Polling and Farchant were preserved as crossing loops, but in Diemendorf the second track was dismantled in 1996. Since 1982, there has been an hourly service on the route. In peak times services run at 30 minute intervals.

In 1985, Deutsche Bundesbahn established its first electronic interlocking in Murnau. For three years it was operated in parallel with the existing signal box to gain experience. On 29 November 1988 it took over full control of the operation. On 28 November 2008, however, control of this section of the line was taken over by the Garmisch electronic interlocking.

Operations

The Garmisch-Partenkirchen line is served by Regionalbahn trains. They run every hour with extra trains in the peak hour, stopping at Munich-Pasing, Tutzing and all stations south of Tutzing. The journey takes about 85 minutes. Additionally, some Intercity-Express trains run on Saturdays and Sundays, taking about 90 minutes, some continuing to Innsbruck. No scheduled freight services operate on the line.

References

  • Rossberg, Ralf Roman (2008). "Gebirgs-Zug. Die Strecke München–Mittenwald–Innsbruck (Mountain railway. The Munich-Mittenwald-Innsbruck line)" (in German). eisenbahn-magazin (6): 28–32. 
  • Blath, Peter (2005) (in German). Schienenverkehr im Werdenfelser Land - Ausgabe 2005 über 200 historische Aufnahmen (Railways in the Werdenfels country - 200 historic photographs). Erfurt: Sutton. ISBN 3-89702-886-7. 
  • Dumjahn, Horst-Werner (1984) (in German). Handbuch der deutschen Eisenbahnstrecken; Eröffnungsdaten 1835–1935. (Handbook of German railway lines, opening dates 1835-1935). Mainz: Dumjahn. ISBN 3-921426-29-4Reprint of 1935 Reichsbahn publication 
  • Track data from Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2007. ISBN 978-3-89494-136-9. 

Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Garmisch-Partenkirchen — Infobox German Location Name = Garmisch Partenkirchen type = Stadt image photo = Anton Doll Ansicht von Garmisch.jpg imagesize = image caption = Ansicht von Garmisch , by Anton Doll Wappen = Garmisch Partenkirchen Wappen.png lat deg = 47 |lat min …   Wikipedia

  • Munich S-Bahn — S Bahn train at Hackerbrücke (Br 423) Info Locale Munich Transit type …   Wikipedia

  • Munich Central Station — München Hauptbahnhof Munich Central Station …   Wikipedia

  • Munich–Augsburg railway — Munich–Augsburg Route number: 980, 999.4 Line length: 61.9 Gauge: 1435 Voltage: 15 kV 16.7 Hz AC Maximum speed …   Wikipedia

  • Munich — For other uses of Munich or München , see Munich (disambiguation). München Munich …   Wikipedia

  • Allgäu Railway (Bavaria) — Munich–Lindau Class 218 with TEE 66 in Geltendorf Route number …   Wikipedia

  • München-Pasing railway station — db station|logo= caption=München Pasing railway station name=München Pasing state=Bavaria locale=Munich borough=Pasing Obermenzing ds100= platforms=9München Pasing is a railway station with nine platforms situated in the in the west of Munich. It …   Wikipedia

  • Lokalbahn AG — The Lokalbahn AG company ( Lokalbahn Aktien Gesellschaft ), or LAG for short, was a private company based in Munich, Bavaria, whose lines of business was the construction and operation of branch lines (the so called Lokalbahnen or Sekundärbahnen… …   Wikipedia

  • Zugspitze — The Zugspitze massif from the west (left: the summit) Elevation 2,962 m (9,718 ft)  …   Wikipedia

  • München Hauptbahnhof — db station|logo= name=München Hauptbahnhof ds100=MH|ibnr=00261|code=|category=1 state=Bavaria|locale=Munich|start=1839 years1=1849|events1=Station rebuilt after fire years2=1893|events2= Starnberger Bahnhof years3=1915|events3= Holzkirchener… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”