Manchester–Sheffield–Wath electric railway

Manchester–Sheffield–Wath electric railway
[v · d · e]Manchester-Sheffield-Wath electric railway,

incorporating the Woodhead Line

Legend
Interchange head
Manchester Piccadilly
Continuation to left Junction from right
Liverpool and Preston lines
Continuation to left Junction to right
Crewe, Stafford, Buxton lines
Stop on track
Ardwick
Straight track Track turning from left Continuation to right
Huddersfield Line
Junction from left Junction both to and from right
Stop on track Straight track
Ashburys
Continuation to left Junction to right Straight track
Hope Valley Line
Straight track Straight track
via Brinnington
Stop on track Straight track
Gorton
Unknown BSicon "exKDSTa" Straight track Straight track
Reddish Depot
Unknown BSicon "exCONTr" Unknown BSicon "exABZqlr" Unknown BSicon "eABZgr+r" Straight track
Fallowfield Loop railway line
Stop on track Straight track
Fairfield
Unknown BSicon "AKRZ-UKu" Unknown BSicon "AKRZ-UKu"
M60
Track turning from left Unknown BSicon "KRZu" Unknown BSicon "ABZgr+xr"
Continuation to left Unknown BSicon "ABZ3rf" Junction from right Straight track
Stockport to Stalybridge Line
Station on track Straight track
Guide Bridge
Unknown BSicon "ABZgl+xl" Junction from right
Straight track Track turning left Continuation to right
Huddersfield Line
Junction both to and from left Non-passenger terminus from right
Dewsnap sidings
Straight track
Continuation to left Junction to right
Hope Valley Line
Station on track
Flowery Field
Station on track
Newton for Hyde
Unknown BSicon "AKRZ-UKu"
M67
Stop on track
Godley
Unknown BSicon "exCONTr" Unknown BSicon "eABZlg"
Godley Junction
Straight track
(Hope Valley Line)
Stop on track
Hattersley
Station on track
Broadbottom
Bridge over water
Etherow viaduct
Large bridge
Dinting viaduct
Stop on track
Dinting
Track turning from left Junction both to and from right
End station Straight track
Glossop
Unknown BSicon "KBHFxe"
Hadfield
Unknown BSicon "exHST"
Crowden
Unknown BSicon "exHST"
Woodhead
Unknown BSicon "exTUNNEL1"
Woodhead Tunnel
Unknown BSicon "exHST"
Dunford Bridge
Unknown BSicon "exABZgl+l" Unknown BSicon "exKDSTr"
Hepworth Iron and Steel
Unknown BSicon "exHST"
Hazlehead Bridge
Unknown BSicon "exDST"
Penistone Goods
Unknown BSicon "xABZrg" Continuation to right
To Huddersfield (Penistone Line)
Station on track
Penistone
Unknown BSicon "exSTRrg" Unknown BSicon "eABZrl" Track turning from right
Barnsley Jct.
Unknown BSicon "exSTR" Large bridge
Oxspring viaduct
Unknown BSicon "exSTR" Enter and exit tunnel
Oxspring tunnel
Unknown BSicon "exSTR" Unknown BSicon "xABZlf" Continuation to right
To Barnsley (Penistone Line)
Unknown BSicon "exSTR" Unknown BSicon "exTUNNEL2"
Silkstone tunnel 2
Unknown BSicon "exSTR" Unknown BSicon "exTUNNEL2"
Silkstone tunnel 1
Unknown BSicon "exSTR" Unknown BSicon "exKDSTl" Unknown BSicon "exABZlg"
Wentworth Silkstone colliery
Unknown BSicon "exSTR" Unknown BSicon "exAKRZ-UKo"
M1
Unknown BSicon "exSTR" Continuation to left Unknown BSicon "xKRZu" Continuation to right
Swaithe viaduct
Unknown BSicon "exSTR" Unknown BSicon "exDST"
Wombwell Main exchange sidings
Unknown BSicon "exSTR" Unknown BSicon "exCONTr" Unknown BSicon "exABZlg"
South Yorkshire Railway
Unknown BSicon "exSTR" Unknown BSicon "exABZlf" Unknown BSicon "exCONTl"
Wombwell Main Junction
Unknown BSicon "exSTR" Unknown BSicon "exABZrg" Unknown BSicon "exCONTl"
Aldham Junction
Unknown BSicon "exSTR" Unknown BSicon "exHST"
Wombwell Central
Unknown BSicon "exSTR" Unknown BSicon "exCONTr" Unknown BSicon "exABZlg"
Elsecar Junction
Unknown BSicon "exSTR" Unknown BSicon "exDST"
Wath Marshalling Yard and Depot
Unknown BSicon "exSTR" Unknown BSicon "exHST"
Wath Central
Unknown BSicon "exBRÜCKE" Unknown BSicon "exCONTf"
Rumtickle Viaduct
Unknown BSicon "exTUNNEL1"
Thurgoland Tunnel
Unknown BSicon "exBHF"
Wortley
Unknown BSicon "exABZlf" Unknown BSicon "exSTRlg"
Unknown BSicon "xABZrg" Unknown BSicon "xABZlg"
Non-passenger end station Straight track
Stocksbridge steel works
Unknown BSicon "eHST"
Deepcar
Unknown BSicon "eHST"
Oughty Bridge
Unknown BSicon "eHST"
Wadsley Bridge
Unknown BSicon "eBHF"
Neepsend
Unknown BSicon "eBHF"
Sheffield Victoria
Continuation to left Unknown BSicon "kABZq+r" Unknown BSicon "kKRZo+r" Unknown BSicon "eABZ3lg" Continuation to right
Midland Main Line
Unknown BSicon "kABZg+r" Unknown BSicon "exSTR"
Nunnery and
Straight track Unknown BSicon "exSTR"
Woodburn junctions
Unknown BSicon "ABZgl+xl" Unknown BSicon "xABZdlg" Unknown BSicon "exCONTl"
to Great Central Railway
Straight track Non-passenger end station
Tinsley Yard
Stop on track
Darnall
Unknown BSicon "eDST"
Rotherwood Sidings
Continuation forward
Sheffield to Lincoln Line

The Manchester-Sheffield-Wath electric railway was an early electrification scheme on British railways. The route featured long ascents on both sides of the Pennines with the long Woodhead Tunnel at its central summit close to the Woodhead pass. This also led to the route being called the Woodhead Line.

Contents

The route

The main route ran from Manchester London Road (later Manchester Piccadilly) over the Pennines, through the Woodhead Tunnel to Penistone, where the Wath line split. The main line then proceeded through Sheffield Victoria Station and on to Rotherwood sidings. The Wath line ran from Penistone to Wath marshalling yard in the heart of the South Yorkshire coalfields.

Minor electrified branches off the main line ran to the locomotive depot at Reddish on the Fallowfield Loop line, to Glossop (for local passenger trains), Dewsnap sidings (all at the Manchester end) and Tinsley Marshalling Yard (at the Sheffield end).

Electrification

EM1 (Class 76) locomotives at Penistone station in 1954

Following developments with electric traction in the USA, the Great Central Railway (GCR) first considered the electrification of the line prior to World War I. No detailed plans were drawn up, but by the 1920s the high levels of heavy freight traffic made steam operation increasingly problematic. Things were interrupted by the 1923 grouping of the railways, which saw the GCR absorbed into the London and North Eastern Railway (LNER).

The operational problems remained into the 1930s. In 1935 the government made credits available to the railways to provide relief for unemployed persons in the Great Depression so the LNER restarted the project: planning and works for electrification commenced.[1] The system was to be electrified at 1,500V DC, similar to the Dutch style of electrification that had also been used on the LNER's Newport-Shildon line. This system had the advantage that regenerative braking could easily be employed; this provided braking traction by allowing an electric locomotive's motors to act as brakes, thus assisting with control of heavy freight trains when running downhill. The power generated by a descending train's braking action was fed back to the overhead lines and either used by other trains requiring power in the same block of line, or dissipated as heat in resistive loads at the electrical sub-stations.

Some gantries for the overhead wires were erected and a prototype locomotive was constructed. However World War II intervened. The prototype locomotive was loaned to the Netherlands immediately after World War II to assist in working the war-damaged railways there; in the process of this it acquired the nickname "Tommy" - which later, after repatriation to Britain, was used officially.

In 1948 the assets of the LNER were nationalised as a part of British Railways. Nearly 30 years had elapsed and still the operational problems remained, so money was made available to complete the electrification project. By now the state of the original Woodhead tunnels meant that a new twin-track tunnel had to be built to replace the two original single-track bores. Thurgoland tunnel gained a new bore to alleviate clearance problems in the original tunnel. New electric locomotive facilities were built at Reddish, Darnall and Wath, and two classes of locomotive were built at Gorton locomotive works, Manchester, exclusively for the line. These were the EM1 (Class 76) Bo+Bo (the + signifiying that the bogies were articulated) mixed-traffic locomotives and seven larger EM2 (Class 77) Co-Co locomotives for express passenger services.

However, to save on costs, the Cheshire Lines Committee (CLC) loop line into Manchester Central station was not electrified, as was originally in the plan: Manchester-bound passenger trains would terminate at London Road (later Piccadilly), while those few passenger trains destined for further afield would change locomotives at Guide Bridge.

The Wath to Penistone section was the first to be energised on 2 February 1952. Completion of the main line was delayed until 1954 by a collapse in the new Woodhead tunnel, and also by the decision to completely re-signal the whole main line with colour-light signals after sighting problems with the semaphore signals on the Wath branch. On 30 May 1954 electric trains began running through the tunnel and the Manchester to Penistone section was fully energised on 14 June. The Sheffield Victoria to Penistone section followed on 20 September 1954. At this time the system had its official opening despite not being fully complete: the final few miles from Sheffield Victoria to the system's eastern extremity at Rotherwood was declared open on 3 January 1955.

During closure of the Midland line for removal of a tunnel between Chesterfield and Sheffield trains from St. Pancras to Manchester were diverted via the Woodhead Line. In September 1969, a westbound diesel-hauled train arrives at Sheffield Victoria's Platform 3, with an EM1 (Class 76) electric locomotive waiting to take the train forward

The benefits of electrification were immediately apparent: Sheffield to Manchester expresses now completed the journey in 56 minutes as opposed to 65 minutes with steam traction; an 850 ton coal train took a mere 66 minutes between Wath and Dunford Bridge as opposed to nearly two and a half hours powered by steam.

The Worsborough (or Wentworth) incline was a formidable feature on the Wath to Penistone section. This line was opened east of Silkstone in 1880 to alleviate congestion at Barnsley. Although nominally 1 in 40, colliery subsidence had made sections of the bank much steeper. The difficulty in operating this steeply-graded section (which included the two Silkstone tunnels) with steam traction was a key reason for electrification. Prior to electrification a unique powerful Garratt locomotive was built to act as a banker for this section of line, otherwise the normal mode of operation was for two or sometimes even three bankers for the Worsborough incline plus a pilot locomotive to assist from Wath to Dunford Bridge. Even with five locomotives, heavy trains had slowed to a walking pace by Silkstone. After electrification, much heavier coal trains could be handled up the bank; however problems with unfitted trains running away on the downgrades west of the Pennines restricted weights on such trains. In later years MGR (Merry-Go-Round) coal trains, running direct from pit to power station became the main traffic with the coal carried in block trains of 30, 32-tonne capacity air-braked wagons. These were normally double-headed by two Class 76 locomotives to their destination with two additional Class 76s banking at the rear from Wombwell to Silkstone. This was the only section of railway in the UK to be regularly operated by four locomotives per train. A "Clearcall" intercom system (via the overhead electric wires) was developed to allow the crews of the front and rear locomotives to communicate, replacing earlier air-horn codes.

The purpose-built power control centre for the line was adjacent to Penistone station. The building still stands, but has been adapted for alternative commercial use.

As much of the line was prone to colliery subsidence, many of the portal structures which supported the overhead wires contained crossbeams which were designed to be easily adjustable upwards or downwards, using permanent way cranes; the ground-level trackside power feed, communications and signalling cables were similarly adjustable.

In 1965 the scheme was extended to take in the brand new Tinsley Marshalling Yard in Sheffield. The locomotive facilities at the Sheffield end of the line were moved from Darnall to the new Tinsley depot. The overhead line equipment on this section was designed to be easily convertible to 25kV AC electrification, which by now had been accepted as the standard overhead electrification system for BR.

Some limitations of the Woodhead electrification became apparent, especially with the advent of the double-headed, double-banked merry-go-round unit trains previously mentioned. Whilst such a train was climbing Worsborough Incline, all other electric trains were prohibited from entering upon or moving within the power section between Strafford Crossing and Aldam Junction, lest the substations at these two locations trip out from the massive current draw. Heavy current loads also caused flashovers in the oil-impregnated paper-insulated, lead-covered 33 kV ground-level feeder cable at locations where cable segments were joined together in sealed boxes; such loads were not present in the MSJ&A and Great Eastern 1.5 kV DC schemes, both of which served only EMU trains and not locomotive-hauled ones.

Closure

A geographically accurate map of the route. (click to expand)

Electric trans-Pennine passenger services lasted just 16 years. The Beeching Report had specified that only one Manchester-Sheffield route should stay open to passengers and that route would be Woodhead. However local opposition to the closure of the alternative Hope Valley line, the high cost of providing an electrified link into Sheffield Midland station as Sheffield Victoria was slated for closure, and the impending opening of the massive Fiddlers Ferry Power Station requiring even more trans-Pennine freight train paths from the South Yorkshire Coalfield, all conspired against the Woodhead line which thus closed to passengers on 5 January 1970. A local electric service remained at the Manchester end of the line and the Sheffield - Penistone service was left in the hands of diesel trains. The Class 77 express passenger train locomotives were sold to the Netherlands Railways, becoming NS Class 1500.

By the late 1970s freight traffic, even including South Yorkshire coal, had declined to the extent that British Rail took the decision to close the route, ultimately effective 18 July 1981; only the Manchester-Glossop/Hadfield local passenger trains were left running. BR claimed that the cost of replacing the out-of-date and non-standard equipment on the main section of the line was prohibitive. All but one of the remaining Class 76 locomotives were scrapped. The Wath branch was rapidly lifted between Wombwell Main Junction and West Silkstone Junction. As a part of the closure agreement, the track on the Sheffield-Penistone-Hadfield section of the route was left in place for five years. 1986 saw much of the remaining track lifted, except for the sections in the vicinity of Penistone station (which remained open for Sheffield-Huddersfield trains), and east of Deepcar which remained for both freight and passenger traffic in the Sheffield area.

In December 1984 the remaining equipment at the Manchester end of the line was modified to the by now standard 25kV AC, thus ending the use of 1,500V DC overhead electrification on British Rail. The Class 506 were withdrawn at the same time, being replaced by Class 303 EMUs from the Glasgow area. The line is now operated by Class 323 EMUs.

References

  1. ^ Modernisation of British Railways: The System of Electrification for British Railways, London: British Transport Commission, 1956, p. 7, http://www.railwaysarchive.co.uk/docsummary.php?docID=1135 

See also

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужно решить контрольную?

Look at other dictionaries:

  • Manchester-Sheffield-Wath electric railway — The Manchester Sheffield Wath electric railway was an early electrification scheme on British railways. The route featured long ascents on both sides of the Pennines with the long Woodhead Tunnel at its central summit close to the Woodhead pass.… …   Wikipedia

  • Railway electrification in Great Britain — describes the past and present electrification systems used to supply traction current to railways and tramways in Great Britain with a chronological record of development, a list of lines using each system, and a history and a technical… …   Wikipedia

  • Wath marshalling yard — Wath marshalling yard, also known as Wath concentration yard, was a large railway marshalling yard specifically designed for the concentration of coal traffic. It was set at the heart of the South Yorkshire Coalfield, at Wath upon Dearne,… …   Wikipedia

  • Sheffield Victoria railway station — Infobox UK disused station name = Sheffield Victoria gridref = SK362880 caption = Sheffield Victoria, as seen in 1971 manager = Manchester, Sheffield and Lincolnshire Railway Great Central Railway owner = London and North Eastern Railway London… …   Wikipedia

  • List of current systems for electric rail traction — This a list of the power supply systems that are, or have been, used for tramway and railway electrification systems. Note that the voltages are nominal and vary depending on load and distance from the substation. Many modern trams and trains use …   Wikipedia

  • Sheffield district rail rationalisation plan of the 1960s — The Sheffield District Rail Rationalisation Plan was a series of linked railway civil engineering projects, station and line closures and train route changes that took place in and around Sheffield, South Yorkshire. The majority of these changes… …   Wikipedia

  • Woodhead Line — The Woodhead Line was a railway line linking Sheffield, Penistone and Manchester in the north of England. A key feature of the route is the passage under the high moorlands of the northern Peak District through the Woodhead Tunnels. The line was… …   Wikipedia

  • Penistone Line — Overview Type Heavy rail System National Rail Status Operational Locale South Yorkshire West Yorkshire She …   Wikipedia

  • Woodhead Tunnel — The Woodhead Tunnels are three trans Pennine railway tunnels which formerly carried a major rail link (usually known as the Woodhead Route) from Manchester to Sheffield in northern England. The western portals are at Woodhead in Derbyshire and… …   Wikipedia

  • Reddish — ] Reddish s position north of the Tame means it was historically part of Lancashire.] In 1974 Stockport and several adjacient territories became a unified metropolitan borough in the newly created metropolitan county of Greater… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”