Tinsley Marshalling Yard

Tinsley Marshalling Yard

Tinsley Marshalling Yard was a railway marshalling yard located near Tinsley in Sheffield. It was opened in 1965 as a part of a major plan to rationalise all aspects of the rail services in the Sheffield area, and closed in stages from 1985 with the run-down of rail freight in Britain. It was also the site of Tinsley Traction Maintenance Depot (TMD), which was closed in 1998. At its peak 200 locomotives were allocated to this depot.

History of the yard

In 1961, a tenth of the rail-borne freight in Britain originated in the Sheffield district. However, as with many areas, the provision of freight facilities had grown through cramped, piecemeal developments associated with the various operating companies that built Britain's rail system. With the region being one of the main heavy industry heartlands of Britain, government money was made available to remedy this situation. Central economic planning and economic self-sufficiency were government policy; the situation was seen as a major limit on Britain's economic growth.

The plan called for the replacement of the majority of the marshalling yards in the Sheffield area with one large yard. A location on the Sheffield District line was chosen and work started in 1963 with the digging out of Brinsworth tunnel. The location allowed easy access to the brand new central Sheffield Freight Terminal at Grimesthorpe, and the new Freightliner terminal on the site of the Masborough Sorting Sidings in Rotherham, one of the many yards that Tinsley replaced.

The locomotive depot opened in 1964, with diesel locomotives moving in from a temporary home in the old Grimesthorpe steam locomotive depot. The Sheffield electric locomotive depot was moved from Darnall to Tinsley and the Darnall Steam/Electric locomotive depot closed to become a wagon-repair depot. Other steam locomotive depots at Millhouses and Canklow were closed and the last steam locomotives based in the Sheffield area were scrapped, along with many redundant sidings dotted about the area.

The Tinsley complex was opened by Dr Beeching on 29 October 1965.

The yard

From its outset, Tinsley was to be a "Network Yard": a major railfreight node where wagon-load freight trains would arrive, be split and resorted into new trains for onward departure to other Network yards, directly to the many rail-connected businesses in the area in "trip" freights, or to the Freight Terminal for unloading and forwarding by road. To assist with this, it featured gravity-assisted shunting and a new computerised system of wagon control, along the lines of large US rail freight yards.

At the time of opening, the yard was handling 3,000 wagons a day. Incoming trains were split in the 11 reception sidings, propelled over the hump in the yard, from where the individual wagons rolled down a slope and were automatically sorted into new trains on the Yard's 50 main sorting sidings. The yard even had its own dedicated class of shunting locomotive (British Rail Class 13) for this purpose as BR's standard class of shunting locomotive was not powerful enough for use in the yard. Each of the main sorting sidings was fitted with computer-controlled retarders to either slow the rolling wagons down before they hit other wagons already on the siding, or give wagons rolling too slowly a boost to move them along to the correct position in a particular siding. This wagon-control system, manufactured by Dowty, was very complex, needed almost constant maintenance, and crucially could not handle longer wheelbase wagons, which were already becoming more prevalent and required individual shunting. There was an express freight and departure yard of 10 sidings, and a 25 road secondary yard for local freight trains (with its own hump).

The Manchester-Sheffield-Wath electrification was extended into the yard to allow electrically hauled trains to the Manchester area to be handled. Unlike similar electrified marshalling yards, to save on costs the main body of the sorting sidings was not electrified: a half of the arrival sidings was electrified for incoming electric trains; departing electric trains either had to use the southern third of the main sorting sidings (the western part of which were wired for electric trains) or had to be drawn out of the main sorting sidings by diesel locomotives into electrified departure roads where the electric locomotives were attached.

Decline

From an early stage the yard was not used at capacity: by the late 1960s road competition was biting hard into the railways' goods traffic, and in particular the wagon-load freight that required hump-yards like Tinsley was already declining. The economic malaise of the 1970s and Britain's shift away from a manufacturing base exacerbated this. By the nineteen-eighties BR was closing its remaining wagon-load freight facilities as being uneconomic.

In 1981 the electrification was removed with the closure of the Manchester-Sheffield-Wath system.

In 1985 the arrival sidings and hump were closed, the wagon-control system removed and the remaining Class 13s scrapped. The associated Freightliner depot and goods transshipment depot had closed by this time (the latter never properly reopened after a major fire in 1985, but was still used in a limited manner until 1995). The yard connections were relaid to allow easier handling of block-load trains which now dominated rail freight in Britain.

By 1995 the decline in British heavy industry meant that this type of traffic had also declined massively. This resulted in the closure of the locomotive depot. The eastern connection to the Midland 'Old Road' fell into disuse at this time, the western connection to the Midland Main Line and goods depot at Grimesthorpe was lifted, and the rest of the yard progressively fell into disuse over the next ten years.

A few years later only the main sorting sidings remained: a part of these were to be used to stable steel trains destined for the Sheffield area, the rest of the remaining sidings were used to store surplus-to-requirements rolling stock in a poor state of repair. However in 2007 the remaining sidings were lifted and a new, much smaller yard laid, the remaining area is taken the under-construction Sheffield International Rail Freight Terminal, a brand new rail-linked distribution and goods transshipment centre.

References

*cite book | first=S.K.| last=Baker| authorlink= | coauthors= | year=| title=Rail Atlas Great Britain & Ireland | edition= | publisher= | location= | id=ISBN 0-86093-553-1
*cite book | first=Bob| last=Pixton| authorlink= | coauthors= | year=2001| title=North Midland, Portrait of a Famous Route: Part Two: Chesterfield-Sheffield-Rotherham | edition= | publisher=Runpast | location=Cheltenham | id=ISBN 1-87075-451-4

External links

* A [http://www.helioslough.com/sirft/index.asp computer-generated image] of the new Sheffield International Rail Freight Depot currently under construction on the site of Tinsley yard.


Wikimedia Foundation. 2010.

Игры ⚽ Поможем решить контрольную работу

Look at other dictionaries:

  • Wath marshalling yard — Wath marshalling yard, also known as Wath concentration yard, was a large railway marshalling yard specifically designed for the concentration of coal traffic. It was set at the heart of the South Yorkshire Coalfield, at Wath upon Dearne,… …   Wikipedia

  • Tinsley — may refer to:People*Beatrice Tinsley (January 27, 1941 – March 23, 1981) – New Zealand astronomer and cosmologist **The Beatrice M. Tinsley Prize – awarded by the American Astronomical Society *Boyd Tinsley (b. May 16, 1964, Charlottesville,… …   Wikipedia

  • Tinsley Motive Power Depot — (latterly Tinsley Traction Maintenance Depot (TMD) was built as part of the Sheffield district rail rationalisation plan of the 1960s opening during 1965 and situated adjacent to, but at a higher level than the new Tinsley Marshalling Yard… …   Wikipedia

  • Sheffield district rail rationalisation plan of the 1960s — The Sheffield District Rail Rationalisation Plan was a series of linked railway civil engineering projects, station and line closures and train route changes that took place in and around Sheffield, South Yorkshire. The majority of these changes… …   Wikipedia

  • Manchester–Sheffield–Wath electric railway — [v · d · …   Wikipedia

  • Gare de formation — Triage Un triage ou une gare de triage (en Belgique : gare de formation) est une gare ferroviaire spécialisée où les wagons de marchandises isolés de leur rame initiale sont triés pour être incorporés dans de nouveaux trains de marchandises… …   Wikipédia en Français

  • Gare de triage — Triage Un triage ou une gare de triage (en Belgique : gare de formation) est une gare ferroviaire spécialisée où les wagons de marchandises isolés de leur rame initiale sont triés pour être incorporés dans de nouveaux trains de marchandises… …   Wikipédia en Français

  • Triage — Un triage ou une gare de triage (en Belgique : gare de formation) est une gare ferroviaire spécialisée où les wagons de marchandises isolés de leur rame initiale sont triés pour être incorporés dans de nouveaux trains de marchandises (fret) …   Wikipédia en Français

  • River Don, South Yorkshire — River Don The River Don as it flows past Hillsborough Stadium. Origin Pennines …   Wikipedia

  • Manchester-Sheffield-Wath electric railway — The Manchester Sheffield Wath electric railway was an early electrification scheme on British railways. The route featured long ascents on both sides of the Pennines with the long Woodhead Tunnel at its central summit close to the Woodhead pass.… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”