- Doncaster railway line
-
The Doncaster railway line is a proposed suburban railway in the eastern suburbs of Melbourne, Victoria, Australia. Connecting to the existing Melbourne metro railway network at Victoria Park station on the Epping and Hurstbridge lines; the Doncaster line would have served the suburbs of Bulleen, Templestowe and Doncaster; running both in the median strip of the Eastern Freeway and in a tunnel under houses.
First proposed in 1890, detailed planning commenced in 1969, and by 1972 the route was decided upon. Despite rising costs, the state governments of the period continued to make assurances that the line would be built. Property acquisition for part of the route was completed in 1975, and construction of a cutting at the city end commenced in 1974, only to be filled in two years later.[1] By 1982 plans to build the line had been shelved by the state government, and by 1984 land for the line once it left the freeway had been sold.[1] In 1991 an independent report investigated constructing the line, recommending against it due to the high cost.[2] However several other reports released since the 1970s detail the essential requirement for heavy rail mass transit in the Doncaster corridor.
The Doncaster rail line proposal is almost identical to the earlier completed Joondalup Line and recently completed Mandurah Line, both in Perth, a city with less than half the population of Melbourne, which runs along the centre median of the Kwinana Freeway and through various tunnels. The Mandurah rail line is almost double the length of the proposed Doncaster line and cost a 1.6 billion, trains are able to travel at up to 130km/h, it was completed in 2007. Despite the massive requirement, local council and public pressure, there remains no firm state government commitment to build the Doncaster line.
Contents
History
1890-1969: Early concepts
One of the first ideas for a railway to Doncaster was in 1890, for a proposed extension of the Kew branch line across the Outer Circle line to Warrandyte, with a branch line running to Templestowe.[3] This was followed in 1920 by another plan to extend the Kew line, this time to serve Doncaster itself Map.[3] This proposal was published in the Metropolitan Town Planning Commission's Plan for Melbourne 1929 together with the Glen Eira line that was subsequently built.
Concrete moves towards the line were made in 1969, when The Age announced that the Victorian Railways had started detailed planning for the line, which would run down the Eastern Freeway then on to Doncaster.[4] The line was to feature in the 1969 Melbourne Transportation Plan, but no timeline for construction was set, compared to the parallel freeway which would start in the next year.
1969-1972: Work begins
In December 1971 the Eastern Railway Construction Act 1971 was passed by the state parliament,[5] setting the route as along the Eastern Freeway to Thompsons Road, then through Templestowe to Blackburn Road, Doncaster, cutting though 30 houses. However this route was not without opposition, as in 1972 The Herald reported that the outer section of the line would be investigated by the Parliamentary Public Works Committee.[4] The City of Box Hill rejected a plan put forward by the City of Doncaster & Templestowe as it would cut into open space along Koonung Creek, and Doncaster residents objected to a route running though the Eastern Golf Course to Blackburn Road. In December 1972 the parliamentary report was delivered and recommended the original route to be constructed as opposed to the 6 alternatives, and criticised the government to allowing development on the proposed routes.[4] The outer section of the line was costed at $23.5 million, the total cost of the line was reported as $41 million, and a terminus to city travel time of 20-25 minutes was put forward.[4]
The route decided upon was reported in The Age on February 23, 1972, but no completion date was mentioned:[4]
- Victoria Park station to Thompsons Road in the Eastern Freeway median strip.
- Sub mile-long surface section along the Koonung Creek valley.
- Surface level north east from the creek to the entrance of tunnel, located near the corner of Harold and Dale Streets, Bulleen.
- 1.5 mile tunnel north-east under Manningham Road and High Street, Doncaster; to a point close to corner of Oak Crescent and Fyfe Drive, Doncaster.
- 0.17 mile above ground running eastwards from the tunnel portal.
- 1.65 mile above ground running east to Tuckers Road.
- Half mile above ground running to corner of Blackburn Road and King Street.
This plan is what the later included in the 1979 (Edition 12) Melway street directory, albeit with additional short lengths of tunnel at various places along the outer section of the route. It remained in the 1982 (Edition 14) Melway'.[6]
1973-1990: Land sale and Government pull-out
In May 1973 the state Liberal Party pledged to build the line if elected, but only to Bulleen.[4] They were returned to power at the state election. By December the same year the Parliamentary Public Works Committee had begun to re-examine the outer section of the line, considering three routes. The first costing $24 million would terminate at Bulleen, the second continued with a branch to Doncaster Road and cost $28 million, and the third was the original route but now costed at $63 million.[4] By March 1974 the cost of the full line was reported by The Age to have increased to $73 million, and that none of the proposed routes could be considered on economic grounds, and a busway would be a better investment.[4]
Despite doubts on the viability of the project, in July 1975 it was reported in The Sun that the Victorian Railways had purchased 18 properties for the railway.[1] It was also reported in The Age that the government would still complete the railway, even though government sources put the cost up to $120 million, up from $74 million the year before.[1] The proposed commencement date was after the completion of the underground City Loop in 1980.
Construction work on a cutting at the Victoria Park end of the line commenced in 1974 to allow the line to access the freeway median strip, but ceased in August 1975 due to economic difficulties faced by the contractor.[1] By October 1976 the Herald reported that the '$600,000 cutting' had been filled in with excavated earth from elsewhere, the reason given by officials was that it needed to be filled so the freeway could be completed. The cost to rebuild the tunnel was estimated by the railways and Country Roads Board at $1.5 million.[1] The final nail in the coffin was a statement by Liberal shadow transport minister Rob Maclellan in August 1984, who said that Government had sold the land set aside for the railway.[3]
1990-2006: Continued support and alternatives
In July 1991 a report on transport in the Eastern Freeway corridor was presented to the Victorian transport minister Peter Spyker. Authored by Professor E.W. Russell, three options were examined in the report:[7]
- Heavy rail to Doncaster Shoppingtown, via Eastern Freeway to Bulleen Road then underground to terminus ($336 million)
- Heavy rail to Blackburn Road and George Street, East Doncaster ($471 million)
- Extension of North Balwyn (tram route 48) along Doncaster Road from Balwyn Road to Doncaster Shoppingtown ($6 million)
The longest of the plans involved 6 kilometres of underground tunnel, and seven stations, four of them underground. The report found that a heavy rail line would be "desirable but too expensive to consider unless major economies in tunnelling and station construction costs can be made".[2] Public Transport Corporation estimates of the same period costed the two rail options at $376 million and $550 million respectively.[2]
Despite the line being a recurring theme among public transport advocates and political hopefuls, today there is no firm commitment to build the line. The cost to complete the line today has been estimated at $1 billion dollars,[8] with transport in the region provided by private motor vehicles on the Eastern Freeway, and bus routes which operate along dedicated lanes from the Doncaster park and ride.[9]
In 2003 the Northern Central City Corridor Strategy provided comparative costings for heavy rail, light rail and high quality bus services. [10]
During the 2006 state election, the Victorian Liberal Party had done their own costing of the rail line and promised to extend the number 48 tram to Doncaster Hill, claiming that constructing the heavy rail line would cost around $1 billion and was deemed too expensive an option in the short term at least.[11]
2007-present: Increased local council & public pressure
Following the state elections in 2006, public pressure mounted and local councils began to fully support the construction of the line, holding regular meetings, discussions and forums.
March 2008, Melbourne Transport Forum, a petition of 7,000 signatures for the Doncaster rail line was delivered by councillors to Minister for Transport Lynne Kosky.
The issue also spread into social websites too with numerous unofficial online groups and petitions being made[12]
Mid-2008, Australian Greens Victoria released a transport discussion paper, The People Plan[13], which includes the Doncaster rail line.
Late 2008, at a forum investigating the Doncaster rail line, which involved the Yarra, Melbourne and Manningham city councils, it was noted that 41% of Manningham residents are classified as low-income earners (despite the eastern suburb affluence stereotype), this is higher than the city average. The discrepancy is suspected to be caused by the increased reliance on private automobiles to meet day to day transport requirements residents face due to the lack of alternative methods of transportation such as Tram-Trains.[13] At this forum, Peter Newman noted the similarities between the Doncaster line and the Mandurah line and suggested that it was the only viable option for both the short and long term transportation needs of the area. Other recommendations included the creation of transport corridors to aid in the transition of the existing urban environment towards Transit oriented development.[14]
In December 2008, in response to massive patronage increases on Melbourne's public transport system and increased road infrastructure problems, the State Labor Government released a transport plan which failed to deal with the construction of the Doncaster line. The proposal investigated the construction of a freeway through Greensborough, into Heidelberg and through the Yarra Flats to connect with the Eastern Freeway at a cost of $6 billion. The proposal is six times the cost of the Doncaster rail line and relies on the continued use of private automobiles.
Also in December 2008, residents in the Mullum Mullum ward in Manningham for the first time elected a former Green party candidate David Ellis, who has been campaigning against the construction of the proposed freeway through Manningham.
Mid 2009: As part of the development of the Victorian Transport Plan, the Labor government has pledged to create a Doncaster Area Rapid Transport (DART) system. However, unlike its DART and BART cousins in Dublin and San Francisco, this scheme is merely an increase in bus services in the Manningham area. Further online support from the community resulted, with a new, unofficial petition and information website.[14]
Leading up to 2010 election, which they subsequently won: The Victorian Liberal Party, promised to commit $6.5m to complete another study to develop a route for building the railway line to Doncaster. This was budgeted for in the 2011 Budget. [15] No funding source was nominated for the actual building of the line. [16]
Recent costings
At the 2006 Victoria state election, the Labor Government costed the construction of the Doncaster rail line at around $1billion. Other costings have been as high as $2billion. In 2008, the Australian Greens Victoria released a transport discussion paper, The People Plan, which costed the construction of the line at $450million.
See also
- List of proposed Melbourne rail extensions
- Mandurah railway line - a similar rail line built in Perth, 2004-2007.
External Resources
References
- ^ a b c d e f Stephen Cauchi (February 1998). "Whatever Happened to the Proposed Railway to Doncaster East". Newsrail (Australian Railway Historical Society (Victorian Division)) 26 (2): page 42.
- ^ a b c Russell, E.W. (July 1991). On the Right Track... Freeways or Better Public Transport for Melbourne's East. pp. page 64.
- ^ a b c Stephen Cauchi (February 1998). "Whatever Happened to the Proposed Railway to Doncaster East". Newsrail (Australian Railway Historical Society (Victorian Division)) 26 (2): page 40.
- ^ a b c d e f g h Stephen Cauchi (February 1998). "Whatever Happened to the Proposed Railway to Doncaster East". Newsrail (Australian Railway Historical Society (Victorian Division)) 26 (2): page 41.
- ^ "Eastern Freeway Lands Act 1971" (DOC). 1999-11-01. http://www.dms.dpc.vic.gov.au/Domino/Web_Notes/LDMS/PubLawToday.nsf/95c43dd4eac71a68ca256dde00056e7b/9375649ab3155c49ca256e5b0003775d/$FILE/71-8204a001doc.doc. Retrieved 2008-03-04.
- ^ "Improvements to the railways in the Melway" (HTML). Railpage Australia forums. 2007-04-10. http://www.railpage.com.au/f-p806135.htm#806135. Retrieved 2008-03-04.
- ^ Russell, E.W. (July 1991). On the Right Track... Freeways or Better Public Transport for Melbourne's East. pp. pages 104–109.
- ^ "New strategy calls for $10 billion tunnels to move people and freight" (HTML). City Of Melbourne. 2006-07-19. http://www.melbourne.vic.gov.au/info.cfm?top=228&pg=715&st=651. Retrieved 2008-03-04.
- ^ "Bus projects and programs" (HTML). Department of Infrastructure. 2008-02-28. Archived from the original on 2008-07-19. http://web.archive.org/web/20080719193328/http://www.taxi.vic.gov.au/doi/internet/transport.nsf/headingpagesdisplay/public+transport+projects+and+programsbuses. Retrieved 2008-03-04.
- ^ "Northern Central City Corridor Strategy" (HTML). Department of Infrastructure. 2003. http://www.doi.vic.gov.au/Doi/Internet/planningprojects.nsf/AllDocs/8D2A24F5A2FB7552CA256F3200257724?OpenDocument#ncccs. Retrieved 2008-06-04.
- ^ As stated by Mary Woolridge during door-to-door campaigns in 2006.
- ^ "100,000 people who want a Doncaster Trainline" (HTML). Facebook groups. http://www.facebook.com/group.php?gid=58436492559.
- ^ "The People Plan" (HTML). Australian Greens Victoria. http://www.thepeopleplan.org.au.
- ^ "Support the Doncaster Railway Line!" (HTML). Unofficial info website. http://sites.google.com/site/doncasterrail/.
- ^ "Coalition Government takes action on Doncaster rail link" (HTML). Government Press Release. http://www.premier.vic.gov.au/media-centre/media-releases/833-coalition-government-takes-action-on-doncaster-rail-link.html.
- ^ "Opposition pledges Doncaster rail line study" (HTML). The Age. http://www.theage.com.au/victoria/opposition-pledges-doncaster-rail-line-study-20101102-17b40.html.
Coordinates: 37°47′50.55″S 145°07′31.72″E / 37.797375°S 145.1254778°E
Categories:- Proposed railway stations in Melbourne
- Public transport in Melbourne
Wikimedia Foundation. 2010.