- Shoreham Nuclear Power Plant
Infobox NPP
Picture=Shoreham Nuclear Power Plant.jpg
Pic_des=
Country=United States
Utility=Long Island Lighting Company
Built=1973-1984
Start=1985-1989 (low level testing but not commercial generation)
End=1989
Reactor=
Reactor_MW=
S_Reactor=1
S_Reactor_MW=820
B_Reactor=
B_Reactor_MW=
M_Reactor=
M_Reactor_MW=
P_Reactor=
P_Reactor_MW=
El_Prod=
for_year=
El_Prod_avg=
Net_Prod=
WEBSITE=
as_of=
Status=D
Coordinates=Coord|40.960975|-72.86504|format=dms
Location=East Shoreham, New York
Supplier=
Type=
Generators=
Capacity=
Architect=
Construction=
Cost=$6 Billion
Expires=
Region=The Shoreham Nuclear Power Plant was a completed $6 billion
General Electric nuclearboiling water reactor located adjacent to the Wading River in East Shoreham,New York that was closed by protests in 1989 without generating any commercial electrical power.Overview
The plant was conceived by the
Long Island Lighting Company (LILCO) and was built between 1973 and 1984. Its location onLong Island Sound — near the mouth of the small stream that forms the border between Brookhaven and Riverhead towns — was largely rural at the time (although within 60 miles ofManhattan ).It drew increasingly intense opposition after the 1979
Three Mile Island accident and the 1986Chernobyl disaster , resulting in delays and cost increases before New York GovernorMario Cuomo pulled the plug in a state takeover of the plant. The state would ultimately take over LILCO also.In contrast, a virtual twin, the 660
MWe Millstone 1, was ordered in 1966 across the Long Island Sound inConnecticut . It was completed for $101 million and became fully operational within five years of receiving a construction permit, producing power until July 21, 1998.After completion, Shoreham received a low power license and underwent low power testing, but never produced any commercial electric power, due to the fact that New York Governor
Mario Cuomo 's representatives did not sign the Emergency Evacuation Plan. This meant that it could not receive a full power license from theNuclear Regulatory Commission (NRC).On May 19, 1989, LILCO agreed not to operate the plant in a deal with the state under which most of the $6 billion cost of the unused plant was passed along to Long Island residents. The
Long Island Power Authority (LIPA), headed byRichard Kessel , was created in 1986 specifically to buy the plant from LILCO (which it did in 1992). The plant was fully decommissioned in 1994.The electricity that would have been generated by the plant is now produced by
fossil fuel s instead.History
Proposal
LILCO President
John J. Tuohy announced plans for the plant on April 13, 1965 during a stockholder's meeting. [ [http://www.fundinguniverse.com/company-histories/LONG-ISLAND-LIGHTING-COMPANY-Company-History.html LILCO History - fundinguniverse.com - Retrieved November 17, 2007] ]The plant was to be the first commercial
nuclear power plant on Long Island and initially had little formal opposition, as Brookhaven already had multiple research nuclear reactors at theBrookhaven National Laboratory , about 20 miles south of Shoreham.LILCO purchased a convert|455|acre|km2|2|lk=on|sing=on site in an area which was sparsely populated at the time. They announced the plant would produce 540 megawatts, cost between $65 and $75 million and would be online in 1973.Cite news
last = Fagin
first = Dan
title = Lights Out at Shoreham
work =Newsday
accessdate = 2007-08-30
date= 2007-05-29
url = http://www.newsday.com/search/ny-history-hs9shore,0,4295595.story] Cite conference
publisher = Chatham House
last = Grimston
first = Malcolm
title = Shoreham - a case study
location = London
booktitle = The Importance of Politics to Nuclear New Build
accessdate = 2007-08-30
year = 2005
month = December
url = http://www.chathamhouse.org.uk/files/3956_dec05nuclear.pdf#page=14]At the time, demand for electricity was increasing more than 10 percent per year on Long Island and the
Atomic Energy Commission was strongly pushing all power companies to use nuclear power.In 1968, LILCO increased the size of the plant from 540 to 820 megawatts and announced plans to build two more reactors in Jamesport. Those reactors never got beyond the drawing board stage but this helped delay and increase the costs of the plant.
In 1969, LILCO announced plans for a reactor at Lloyd Harbor in Huntington, New York — closer to Manhattan in a more densely populated area. Residents managed to get it killed by 1970, setting the stage for opposition to any nuclear power plant on Long Island.
Construction
Construction began in 1973 but cost overruns caused its estimated final cost to approach $2 billion by the late 1970s, due to low worker productivity and design changes ordered by the NRC.
Organized crime was also accused of stirring problems with local labor unions [Karl Grossman 's "Power Crazy, Is LILCO Turning Wading River into America's Chernobyl?" (New York: Evergreen/Grove Press, 1986)] , and it was target of a CBS "60 Minutes " probe, which aired 24 March 1985.Fact|date=December 2007Mounting protests
The first small anti-Shoreham demonstration took place in June 1976. On June 3, 1979, following the Three Mile Island incident, 15,000 protesters gathered in the largest demonstration in Long Island history. 600 were arrested as they scaled the plant's fences. [ [http://select.nytimes.com/gst/abstract.html?res=F20D11FD3E5D12728DDDAD0894DE405B898BF1D3 Shoreham Action Is One of Largest Held Worldwide; 15,000 Protest L.I. Atom Plant; 600 Seized 600 Arrested on L.I. as 15,000 Protest at Nuclear Plant Nuclear Supporter on Hand Governor Stresses Safety Thousands Protest Worldwide - New York Times - June 4, 1979] ]
LILCO's problems were compounded by NRC rules in the wake of Three Mile Island (in which no one was harmed, but evacuations of thousands of people were planned), requiring that operators of nuclear plants work out evacuation plans in cooperation with state and local governments. Politicians from local entities nearly unanimously joined the opposition,Fact|date=December 2007 saying their communities could not be evacuated quickly in case of an accident, as any land evacuation off the island would involve traveling at least 60 miles back through New York City to reach its bridges.
Among the groups joining the chorus for closing the plant were Lloyd Harbor Study Group, the
Farm Bureau , The Long Island Safe Energy Coalition and its newsletter Chain Reaction, Safe'n Sound with its Sound Times newspaper, the S.H.A.D. Alliance (modeled on New Hampshire'sClamshell Alliance ), and the Shoreham Opponents Coalition.Closure
On February 17, 1983, the Suffolk County Legislature announced with a 15-1 vote that the county could not be safely evacuated. Newly elected governor of New York, Mario Cuomo, ordered state officials not to approve any LILCO-sponsored evacuation plan.
The plant was completed in 1984. In 1985 LILCO received federal permission for low-power 5 percent tests.
Confidence in LILCO took a hit in 1985 when it took nearly two weeks to restore power to all of the island following
Hurricane Gloria .Between 1985 and 1989, as local communities continued to refuse to sign the necessary evacuation plan, LILCO proposed asking the U.S. Congress to approve a law for the evacuation — a move which went nowhere.Specify|date=December 2007
On February 28, 1989, Cuomo and LILCO announced a plan to decommission the plant, which involved the state taking over the plant and then attaching a 3 percent surcharge to Long Island electric bills for 30 years to pay off the $6 billion price tag. [ [http://query.nytimes.com/gst/fullpage.html?res=9900E4DB1539F935A15752C0A9659C8B63 IN BRIEF; Court Declines Appeal Of Shoreham Ruling - New York Times - January 26, 2003] ]
Aftermath
It cost $186 million to decommission the reactor, with the radioactive materials license ending in May 1995. The low-pressure turbine rotors are currently in use at the
Davis-Besse Nuclear Power Station . LILCO paidPhiladelphia Electric Company $50 million to take its fuel to theLimerick Nuclear Power Plant . [ [http://www.nukeworker.com/nuke_facilities/North_America/usa/NRC_Facilities/Region_1/shoreham/index.shtml nukeworker.com] ]The debacle led to the state takeover of LILCO itself in 1998 as it became the
Long Island Power Authority .The electric transmission infrastructure has remained, connecting it to the Long Island electric grid. In 2002 the
Cross Sound Cable , asubmarine power cable capable of transmitting 330 MW, was laid from the Shoreham plant across Long Island Sound toNew Haven, Connecticut . During theNortheast Blackout of 2003 the cable was used to ease the effects of the blackout on Long Island. After extended negotiations withConnecticut the cable was put into permanent use. [http://www.lipower.org/newscenter/pr/2004/june25.csc.html GOVERNOR PATAKI HAILS AGREEMENT ON CROSS SOUND CABLE AND GIVES ORDER TO ENERGIZE CABLE AND MAKE IT OPERATIONAL]In 2005, two 100-foot-high
wind turbine s with 25-foot blades were erected at the plant and attached to the electric grid, generating a peak power of 50 kilowatts each (1/8000 of the power that the nuclear plant would have generated). [ [http://www.lipower.org/newscenter/pr/2005/012505_shoreham.html LIPA Dedicates Two Wind Turbines at Shoreham Located Near Defunct Nuclear Plant, LIPA’s New Land-Based Turbines Symbolize LI’s Energy Future: Renewables - lipower.org - January 25, 2005 - Retrieved December 17, 2007] ]See also
*
List of nuclear reactors
*Nuclear power plant
*Nuclear power
*Broadwater Energy
*Licensed to Kill? The Nuclear Regulatory Commission and the Shoreham Power Plant References
External links
* Cite web
last = Rennhack
first = Michael D
title = Shoreham
work = Nukeworker.com
accessdate = 2007-08-30
date =2007-08-09
url = http://www.nukeworker.com/nuke_facilities/North_America/usa/NRC_Facilities/Region_1/shoreham/ - History of plant and decommissioning
* Cite encyclopedia
title = Shoreham Nuclear Power Facility
encyclopedia = The Columbia Gazetteer of North America
accessdate = 2007-08-30
date= 2000
url = http://www.bartleby.com/69/34/S10834.html
* Cite news
last = Seitz
first = Frederick
title = Must we have nuclear power?
work =Reader's Digest
accessdate = 2007-08-30
year = 1990
month = August
url = http://www.me.utexas.edu/~ans/info/reactor4.htm
Wikimedia Foundation. 2010.