Circle Drive

Circle Drive
Circle Drive
CircleDrCityCentreYorkton.jpg
Location: Saskatoon, Saskatchewan

Circle Drive is a major road constructed as a ring road in Saskatoon, Saskatchewan, Canada. The northeastern portion of the road is part of the Yellowhead Highway.

Contents

History

Construction of a ring road in Saskatoon was first proposed in 1913 by city commissioner Christopher J. Yorath. He conceived the first comprehensive town plan, which included inner and outer "encircling boulevards". Parts of the present-day roadway follow the course Yorath laid out.[1] It wasn't until the 1950s as the city expanded outward that the present roadway corridor was established. Circle Drive was built in sections, as required by traffic conditions and allowed by available funding. The first sections - the northwest segment between Warman Road and 11th Street West and the southeast segment between Lorne Avenue and College Drive - were constructed beginning in the 1960s, concurrent with the Idylwyld Freeway project. The last major section of the roadway that was constructed was in the northeast quadrant, from College Drive to Millar Avenue. This included the construction of the Circle Drive Bridge across the South Saskatchewan River, completed in 1983.

South bridge

Future site of the Idylwyld Drive and Circle Drive South Interchange

At present, Circle Drive does not form a complete ring around the city. The last remaining section between 11th Street West and Lorne Avenue, referred to as the "South River Crossing" or (Circle Drive South Bridge), is currently under construction. Approximately 7 km in length, it will connect the C.N. Industrial area to the Holiday Park neighbourhood, travelling through property annexed from the Saskatoon Golf and Country Club.[2][3] It includes a new bridge across the South Saskatchewan River, located just north and parallel to the Grand Trunk Bridge.[4][5]

The bridge will have six traffic lanes and a pedestrian walkway suspended underneath, similar to the existing Circle Drive Bridge. National and provincial funding each amounted to $172 million and the City of Saskatoon committed $70.5 million towards the project.[6] The total cost of the project is estimated at $272.5 million.[4]

The City of Saskatoon hired a private contractor to build the bridge. Three companies submitted proposals: PCL Construction, Peter Kiewet Sons and Graham Construction/Flatiron.[7] The Graham/Flatiron bid was selected on March 29, 2010. Construction is expected to be complete by September 30, 2012.[4] As of January 2011, the project was on schedule, according to the city manager.[8] The completion date was again confirmed by the project manager in September 2011.[9]

Environment Canada and Fisheries and Ocean will oversee environmental impacts on the river. There will be two new proposed interchanges, one at Valley Road and the other at 11th Street West which will utilise some of the land area given up by the Maple Leaf Foods building demolition in 2010.[7]

The Holiday Park golf course will need to re-landscape two holes on the golf course, as holes 6 and 7 will be affected. Another possible impact of the project is a new rail switching yard near 11th Street and Dundonald Avenue. In 2010, the City of Saskatoon signed a non-binding agreement in principle with the Canadian National Railway and Canadian Pacific Railway to move railcar switching out of the downtown Central Industrial neighbourhood.[10]

Interchanges

Clarence Avenue/Circle Drive interchange

As of 2004, the Circle Drive Bridge portion of the road was carrying up to 50,000 vehicles per day, more than twice the volume from when it opened.[11] Due to the greatly increased traffic the bridge was significantly expanded in 2007.[12] Over the years, a number of at-grade intersections were converted to grade-separated interchanges to improve traffic flow.[13] They include:

  • Idylwyld Drive North (formerly known as Avenue A) - 1960s
  • 33rd Street - November 10, 1980 (expanded in summer 1992)
  • Warman Road - July 1, 1983 (coinciding with the opening of Circle Drive Bridge)
  • Taylor Street - September 16, 1996
  • 8th Street - October 31, 1999 - initially constructed as a large traffic circle, this traffic control device proved unpopular and was eventually replaced by an interchange.
  • Attridge Drive/Preston Avenue North - October 1, 2001
  • 22nd Street - October 28, 2002
  • College Drive - October 4, 2006
  • Clarence Avenue - November 20, 2007
  • Preston Avenue - projected 2012[14]

There are also purpose-built half-diamond interchanges at 14th Street East and 108th Street, and a cloverleaf interchange at highways 11 and 16. Between Miller Avenue and Avenue C North, Circle Drive downgrades from a freeway to an arterial road, with regular signalized intersections and driveway-accessed businesses.

The present terminal points at 11th Street West and Lorne Avenue are slated to become interchanges as part of the South River Crossing project. The federal government committed $70 million in 2007 for the Lorne Avenue and Idylwyld interchanges. The city has allocated $37 million for land and its share of the new interchange.[6]

Exits and intersections

This is a diagram of present and proposed exits and intersections on Circle Drive, from where Circle Drive presently ends at 11th Street:

Circle Drive Exits
Entering the City of Saskatoon
Urban tunnel straight track
Continues as Dundonald Avenue past this point
Unknown BSicon "uKRZ4d"
11th Street W Interchange planned
Unknown BSicon "KRZrht" Unknown BSicon "xtKRZt"
Clancy Drive (alternate route to Pendygrasse Road)
Unknown BSicon "eABZlf" Unknown BSicon "exSTRlg" Unused urban tunnel straight track
Confederation Drive to Highway 7/Highway 14 (22nd Street SW) Northbound exit, southbound entrance only
Unknown BSicon "eABZrg" Unknown BSicon "exKRZu" Unknown BSicon "uexmKRZ"
Fairmont Drive to 22nd Street W eastbound from SB Circle Drive Southbound exit only
Unused waterway turning from left Unknown BSicon "muexABZlg" Unknown BSicon "exABZrg" Unknown BSicon "uexmKRZt"
22nd Street W eastbound offramp merges with Circle Drive northbound; exit from SB on-ramp to Fairmont Drive via Fairlight Drive
Unknown BSicon "ueABZ3lg" Unknown BSicon "ueABZ3lf" Unknown BSicon "mKRZo" Unknown BSicon "xmKRZ" Unknown BSicon "ueABZ3rf" Unknown BSicon "ueABZ3rg"
Highway 7/Highway 14 (22nd Street SW); Fairmont Drive merges with westbound 22nd Street
Unused waterway turning left Unused transverse waterway Unknown BSicon "emABZg+lr" Unknown BSicon "exmKRZu" Unused transverse waterway Unused waterway turning right
22nd Street W westbound offramp merges with Circle Drive northbound; Exit to 22nd Street W westbound from Circle Drive southbound
Unknown BSicon "eABZrg" Unknown BSicon "exABZlg"
Confederation Drive northbound from Circle Drive southbound
Unknown BSicon "KRZrht" Unknown BSicon "xtKRZt"
Laurier Drive (alternate route to Confederation Drive)
Flat crossing with all 4 side branchings
33rd Street W
Unknown BSicon "KRZrht"
Airport Drive to Saskatoon John G. Diefenbaker International Airport
Unknown BSicon "uKRZ"
Avenue C N - Becomes arterial road at this point
Unknown BSicon "uKRZ4d"
Highway 16/Saskatchewan Highway 11 (Idylwyld Drive) Highway 16 enters Circle Drive; Diamond interchange with intersections on Circle Drive
Urban tunnel straight track
Unknown BSicon "uKRZ"
Millar Avenue/Venture Crescent Continues as freeway past this point
Flat crossing with all 4 side branchings
Warman Road
Bridge over water
Circle Drive Bridge over South Saskatchewan River
Unknown BSicon "exSTRrg" Unknown BSicon "eABZrf"
Alternate exit to Preston Avenue southbound
Unknown BSicon "eABZ3rf" Flat crossing with all 4 side branchings
Preston Avenue/Attridge Drive
Unknown BSicon "kABZglr"
108th Street Northbound entrance, southbound exit only
Flat crossing with all 4 side branchings
College Drive
Unknown BSicon "kABZglr"
14th Street Northbound entrance, southbound exit only
Flat crossing with all 4 side branchings
8th Street E
Flat crossing with all 4 side branchings
Taylor Street E
Track turning from left Flat crossing with all 4 side branchings Unknown BSicon "tSTRq"
Continues as Highway 11 south to Regina; Circle Drive continues west from this interchange Highway 16 exits Circle Drive and proceeds east towards Portage la Prairie
Flat crossing Unknown BSicon "tSTR"
Preston Avenue
Flat crossing with all 4 side branchings
Clarence Avenue
Unknown BSicon "xABZlf" Track turning from right
Currently continues as Idylwyld Drive; proposed extension of Circle Drive will begin here at an interchange
Unknown BSicon "extSTR" Bridge over water
Circle Drive South Bridge over South Saskatchewan River New bridge, under construction
Unknown BSicon "uKRZ4d"
Valley Road New interchange planned
Unknown BSicon "uKRZ4d"
11th Street W Interchange planned
Urban tunnel straight track
Current alignment of Circle Drive continues past this point

References

  1. ^ Kerr, Don; Stan Hanson (1982). Georgina Lewis. ed. Saskatoon: The First Half-Century. NeWest Press. p. 286. ISBN 0-920316-37-9. 
  2. ^ "Circle Drive South Bridge". http://www.borealisoutdoor.com/content/news/20050210_SaskatoonSouthBridge.htm. Retrieved 2008-12-24. 
  3. ^ "River Crossing Studies". City of Saskatoon. http://www.saskatoon.ca/DEPARTMENTS/Infrastructure%20Services/Transportation/TransportationPlanning/River%20Crossing%20Studies/Pages/default.aspx. Retrieved 2010-11-04. 
  4. ^ a b c "Circle Drive South Project". City of Saskatoon. http://www.saskatoon.ca/DEPARTMENTS/Infrastructure%20Services/Transportation/TransportationPlanning/Pages/CircleDriveSouthProject.aspx. Retrieved 2010-11-04. 
  5. ^ "Circle Drive South River Crossing - Complete Alignment" (PDF). City of Saskatoon - Infrastructure Services. March 12, 2009. http://www.saskatoon.ca/DEPARTMENTS/Infrastructure%20Services/Transportation/Documents/CDSRC_Complete_Alignment.pdf. Retrieved 2009-12-08. 
  6. ^ a b Nickel, Rod (June 21, 2008). "Bridge builders". The StarPhoenix: pp. A1. http://www.canada.com/saskatoonstarphoenix/news/story.html?id=6e47c3aa-b24e-4bae-86cc-dba027954d3b. Retrieved 2010-11-04. 
  7. ^ a b Hutton, David (2009-05-30). "Builders to receive details on bridge project". Saskatoon: Saskatoon Star Phoenix. pp. A1, A4, continued on A7 with map. http://www2.canada.com/saskatoonstarphoenix/news/story.html?id=4faa5219-57a0-441a-af1c-4d296a868c11. Retrieved 2010-11-04. 
  8. ^ Hutton, David (January 11, 2011). "Massive freeway project on time". The StarPhoenix (Postmedia Network). http://www.thestarphoenix.com/news/Massive+freeway+project+time/4089379/story.html. Retrieved 2011-01-11. 
  9. ^ Hutton, David (September 28, 2011). "Massive project rises from the ground". The StarPhoenix (Postmedia Network). http://www.thestarphoenix.com/Massive+Saskatoon+project+rises+from+ground/5468082/story.html. Retrieved 2011-09-28. 
  10. ^ Hutton, David (June 23, 2009). "City, CP agree to study move of downtown yard". The StarPhoenix (Canwest): p. A3. http://www.okthepk.ca/dataCprSiding/news/2009/09062406.htm. Retrieved 2010-11-04. 
  11. ^ "(pdf) Circle Drive South River Crossing, Questions and Answers" (PDF). City of Saskatoon. June 2004. Archived from the original on October 12, 2007. http://web.archive.org/web/20071012141113/http://www.saskatoon.ca/org/municipal_engineering/river_crossings/SC_questions_answers.pdf. Retrieved 2007-11-28. 
  12. ^ "Circle Drive Widening". City of Saskatoon. http://www.saskatoon.ca/org/municipal_engineering/construction/Circle_widening/index.asp. Retrieved 2007-11-29. 
  13. ^ "The City of Saskatoon Municipal Manual 2007" (PDF). City of Saskatoon. Archived from the original on October 26, 2007. http://web.archive.org/web/20071026085734/http://www.saskatoon.ca/org/clerks_office/municipal_manual.pdf. Retrieved 2007-12-12. 
  14. ^ "Circle Drive and Preston Avenue Interchange Information Session on October 19". City of Saskatoon. http://www.saskatoon.ca/FORUM/News%20Releases/Pages/CircleDriveandPrestonAvenueInterchangeInformationSessiononOctober19.aspx. Retrieved 2010-11-04. 

External links


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Circle Drive Bridge — Official name Circle Drive Bridge Carries 6 lanes of Circle Drive Crosses …   Wikipedia

  • Circle Drive South Bridge — under construction Official name Circle Drive South Bridge Carries 6 lanes of Circle Drive …   Wikipedia

  • Circle Drive Bridge (Saskatoon) — Infobox Bridge bridge name = Circle Drive Bridge caption = Circle Drive Bridge official name = Circle Drive Bridge carries = 6 lanes of Circle Drive crosses = South Saskatchewan River locale = Saskatoon, Saskatchewan, Canada maint = City of… …   Wikipedia

  • Circle Centre Mall (Saskatoon) — Circle Centre Circle Centre Mall Location College Park (Lakewood SDA), Saskatoon, Saskatchewan, Canada No. of anchor tenants 2 JYSK, Addition Elle, as well as 8th …   Wikipedia

  • Circle S Lodge — (Gering,США) Категория отеля: 1 звездочный отель Адрес: 400 M Street, Gering, NE 69341, США Описание: Offe …   Каталог отелей

  • Circle Pines, Minnesota —   City   …   Wikipedia

  • Drive-by shooting — Drive by redirects here. For other uses, see Drive by (disambiguation). For the album by the Rollins Band, see Drive by Shooting. A drive by shooting (or drive by) is a form of hit and run tactic, a personal attack carried out by an individual or …   Wikipedia

  • Drive (R.E.M. song) — Drive Single by R.E.M. from the album Automatic for the People B side …   Wikipedia

  • Circle 7 animation — Logo de Circle 7 Animation Circle 7 Animation était une société de la Walt Disney Company spécialisée dans la production de films d animation en images de synthèse (CGI). Cette société a été fondée en 2004 après l annonce des intentions de Pixar… …   Wikipédia en Français

  • Circle A Ranch — (Cuba,США) Категория отеля: 5 звездочный отель Адрес: Box 382, 510 Los Pinos Road, Cu …   Каталог отелей

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”