- Southend Central railway station
Infobox UK station
name = Southend Central
manager =c2c
locale = Clifftown Road
borough =Southend-on-Sea
usage0405 = 2.791
usage0506 = 3.018
usage0607 = 1.695
code = SOC
platforms = 4
start = 1856Southend Central is a railway station on the
London, Tilbury and Southend Railway . Train services are provided by theNational Express Group train operating company c2c . It is located in Southend Town Centre on Clifftown Road inSouthend-on-Sea ,Essex ,England , SS1 1AB, just off the middle of Southend High Street and down the road from Southend Travel Centre with easy access tobus services andSouth East Essex College and theUniversity of Essex Southend Campus, to which it is adjacent. It was opened in 1856 by theLondon, Tilbury and Southend Railway and was the original eastern terminus of the line, which was later extended toShoeburyness railway station . It has four platforms:
*Platform 1 is a disused bay platform
*Platform 2 has Shoeburyness-bound services fromLondon
*Platform 3 has (usually fast) London-bound services from Shoeburyness
*Platform 4 is a bay platform with (usually slow) London-bound services departing from Southend Central which take the longer route via Grays and Ockendon and terminating services from London.It has a partially sheltered
bicycle storage rack for 30 bikes and 150car parking spaces but no disabled spaces. [cite web | url=http://www.c2c-online.co.uk/our_services/stations_and_route_map/southend_central | title=c2c Online - Southend Central station | author=c2c | date= | accessdate=2008-07-19] It is used by around 10,500 people every day.Southend Victoria railway station , the Southend terminus of theGreat Eastern Main Line operated by c2c'sNational Express Group sister companyNational Express East Anglia , is also located in Southend-on-Sea Town Centre.Refurbishment
Following the successful refurbishment of
Benfleet railway station , c2c decided to implement a similar refurbishment at Southend Central. The work cost £460,000 and was jointly funded by c2c and Southend Borough Council. It involved the complete refurbishment of the ticket office and toilets and the construction of a new forecourt on the north side of the station (leading to Platform 2 which has Shoeburyness-bound services) opposite theUniversity of Essex Southend Campus, with new steps andDisability Discrimination Act 2005 (DDA) compliant handrails on both sides of the canopy, and a new glass roof and lighting over the bicycle parking area there. It was completed onJune 19 ,2007 [cite web | url=http://www.c2c-online.co.uk/latest_updates/news/a_smarter_station_for_the_people_of_southend | title=c2c Online - A smarter station for the people of Southend | author=c2c | date=June 20 ,2007 | accessdate=2008-07-19] and took around 4 weeks, during which a temporary ticket office in aportable building was used.The ticket office has two serving positions, one of which was made fully compliant with the
Disability Discrimination Act 2005 in the refurbishment, and uses the TRIBUTE ticket issuing system.Services
The typical off-peak service frequency is:
* 6tph (trains per hour) to London Fenchurch Street of which:
**2tph do not stop at Pitsea, West Horndon or Limehouse
**2tph call at all stations via Basildon
**2tph take the longer route via Grays and Ockendon
* 4tph to ShoeburynessExternal links
References
Wikimedia Foundation. 2010.