Derby Carriage and Wagon Works was built by the Midland Railway in Derby, England. The plant has been through many changes of ownership and is currently owned by Bombardier Transportation, a subsidiary of Bombardier Inc. of Canada. As of 2011 it is the only remaining passenger rolling stock manufacturer in the UK.[1]

Contents

Midland Railway

Railway building began at Derby Works in 1840, when the North Midland Railway, the Midland Counties Railway and the Birmingham and Derby Railway set up engine sheds as part of their Tri Junct Station. When the three merged in 1844 to form the Midland Railway its first Locomotive and Carriage Superintendent Matthew Kirtley set out to organise their activities and persuaded the directors to build their own rolling stock, rather than buying it in. (see Derby Works)

By the 1860s the works had expanded to such an extent, that he was considering reorganising it and, in 1873, it separated into the Midland Railway Locomotive Works, known locally as "The Loco" and a new Derby Carriage and Wagon Works, further south, off Litchurch Lane, locally known as the "Carriage and Wagon". This was completed by his successor Samuel W. Johnson, under the control of Thomas Gethin Clayton[2]

The carriages of the time were less than fifty feet long but, possibly because the Midland had just taken delivery of its first Pullman car, 56 feet 5 inches long, Clayton had the foresight to design the works to deal with vehicles up to seventy feet. This meant, for instance, that the traversers at the end of each shed were still in use a century later.

Production began in 1873 of carriages from kits supplied by the Pullman Company of Detroit in America. These were followed by Clayton's own design of 54-foot-long (16 m) coaches, which incorporated both first- and third-class accommodation, and ran on four- or six-wheeled bogies. [3] Initially claret or dark red, with dark green locomotives, the livery of both was changed to the well-known crimson in 1883. Five layers of undercoat were used, followed by a top coat and three coats of varnish.

A six-wheeled coach built in 1885 is in the National Railway Museum. In 1879 the first bogie coaches were built for the Midland's line to Glasgow over its newly-opened Settle-Carlisle line. Clayton's successor in 1903 was David Bain., the works building sleeping cars and dining coaches. In 1904 two steam motor-carriages were fitted out for the Morecambe-Heysham service.

Ten- and twelve-ton wagons were produced in quantity, starting with a set of components in the morning, each would be assembled for painting by the end of the day. Reid and E.J.H.Lemon studied American mass production methods and introduced them around 1919, raising output to 200 wagons and 10 coaches a week. The sawmill was recognised as the most modern and largest in Europe, with over 2000 miles of timber being seasoned, of nearly sixty different varieties, from pine to lignum vitae.

In 1914 the works turned to producing supplies for the army of World War I, building ambulance trains and army wagons, plus parts for rifles.

London, Midland and Scottish Railway

In 1923 the Midland Railway became part of the London, Midland and Scottish Railway, and W.R.Reid was appointed Carriage & Wagon Superintendent. Together with the LNWR's Wolverton works, new coaches were built to the Midland design, corridor coaches with doors to each compartment - the so-called "all-doors". These were still in use until nearly 1960, particularly on the Liverpool and Newcastle to Bristol expresses.

Around 1929 the compartment doors, however, were replaced by two fixed lights, and later with single large windows. All-wood construction gave way to steel panels. In the next decade the Works Superintendent, Ernest Pugson, realised the potential of the new technology of metallic arc welding, replacing many forged and cast components. He introduced the first composite welded steel/timber bodies with standardised jig-built components. The first open carriages, referred to as "vestibule coaches", also appeared. From 1933, roofs were of steel rather than wood, with a simplified livery and a smoother external appearance, and, at the end of the 1930's all-welded steel vehicles were built for the Liverpool and Southport electric service, the Class 502.

During World War II, Derby pioneered aeroplane wing production methods, by 1945 having produced over 4000. With the loco works, wings and fuselages were repaired and sent to a private contractor at Nottingham for assembly, initially of Hampden bombers but later of other aircraft including Lancasters.

Although, towards the end of the 'thirties a complete 'Coronation Scot' train was built for an exhibition tour in America and a streamlined all-welded three coach railcar, most of the all-steel carriages were made by outside manufacturers. After the war, the LMS began to produce its own, the so-called "porthole" stock with round windows to the lavatory compartment. After nationalisation in 1948, as the main carriage works of the London Midland Region, the first Mk I all-steel carriages were produced.

Preserved Derby Lightweight at Bewdley

British Rail diesel railcars

In the early 1950s a railway carriage could be seen gliding along, apparently by itself, on the Wirksworth Branch out of Duffield. (The present Ecclesbourne Valley line).

In 1953, Derby was chosen to build the first diesel multiple units, of all-aluminium construction, the so-called "Derby Lightweights". This also included the introduction of glass fibre laminate for the roof ends.

Trailer cars were also built for the London Transport Executive as replacements on the London Underground Piccadilly Line. In 1956, all-steel railcars, the "Derby Heavyweights" were introduced, with over a thousand being built in that decade.

From 1958 a new class of Derby Lightweight was produced in quantity, the Class 108. A number of steel bodied Class 107 units was built in 1960 for lines in Scotland.

Litchurch Lane

The prototype railbus LEV1

In 1962 the works was renamed as Derby Litchurch Lane Works. Wagon building and repairs ended, with a major re-organisation of the carriage and railcar work, and in 1979 container production finished.

In 1984, British Rail was under extreme financial pressure to close branch lines. At the same time a worldwide need was seen for a low-cost rail vehicle. The Research Division and British Leyland together produced a lightweight four wheeled vehicle which they referred to as LEV-1. After proving trials, which included assessment on the Boston and Maine Railroad in America it was put into service as the Class 140 which led to a series of two car "Pacer" units, and around 150 of various classes were built.

Post-privatisation

Class 170 Turbostar at Peterborough

BREL was eventually bought by Asea Brown Boveri (ABB), which then became Adtranz, and later Bombardier Transportation.[4]

One of the first orders in 1993 was for Class 482 electric trains for the Waterloo and City Line. In 1995 a number of electric Class 325 parcels trains were built. However, this period was characterised by large contracts and rushes of work, interspersed with periods of relative idleness and layoffs.[citation needed] The works kept going by refurbishing ex-Southern Region slam-door stock.[citation needed]

Gautrain EMU in South Africa

In 1997 a contract was received to supply a new class of vehicle, the Class 168 "Clubman", which led to the various "Turbostar" diesel and "Electrostar" electric multiple units, now the most widely used trains in Britain. Export orders included Electrostars for Gautrain in South Africa, some delivered complete and some in kit form for assembly in South Africa.[5] In 2009 Bombardier received a contract to build 30 new Class 379 trains for National Express services including Stansted Express.[6]

In 2011 Derby was building a new fleet of trains for the Victoria, and sub-surface (Metropolitan/District/Circle/Hammersmith & City) lines of the London Underground.[7] The company completed an order to build more Electrostars for London Overground, and was building new Class 172 lightweight Turbostars for London Overground, Chiltern Railways and London Midland.[7]

As of 2011, Bombardier's Derby plant was the only remaining specialist passenger rolling stock manufacturer in the UK,[1] until such a time as Hitachi constructs a planned assembly plant at Newton Aycliffe.[8] After Siemens was named preferred bidder in June 2011 to construct the new rolling stock for Thameslink services through London,[9] Bombardier announced it was to cut 1,400 out of the 3,000 jobs at Derby.[10][11] Colin Walton, Chairman of Bombardier Transportation in the UK, said the loss of the contract had forced the company to review its UK operations.[12], while Francis Paonessa, President of Bombardier's UK Passengers Division said the Thameslink contract would have secured a workload at Derby, and its loss meant it was inevitable that Bombardier "must adjust capacity in line with economic reality".[7]

See also

References

  1. ^ a b "Crossrail rolling stock contract delayed pending procurement review". Railway Gazette International. 30 August 2011. http://www.railwaygazette.com/nc/news/single-view/view/crossrail-rolling-stock-contract-delayed-pending-procurement-review.html. 
  2. ^ Billson, P., (1996) Derby and the Midland Railway, Breedon Books
  3. ^ Vaughan, A., (1997) Railwaymen, Politics and Money, London: John Murray
  4. ^ "Bombardier's Acquisition of Adtranz Now Completed". www.allbusiness.com. Business Wire. 30 April 2001. http://www.allbusiness.com/company-activities-management/company-structures-ownership/6066861-1.html. 
  5. ^ "First Gautrain EMU unveiled". Railway Gazette International (London). 9 July 2008. http://www.railwaygazette.com/nc/news/single-view/view/first-gautrain-emu-unveiled.html. 
  6. ^ "Bombardier signs Stansted airport train order". Railway Gazette International (London). 2 April 2009. http://www.railwaygazette.com/nc/news/single-view/view/bombardier-signs-stansted-airport-train-order/browse/1.html. 
  7. ^ a b c "Bombardier to shed 1400 jobs at Derby". Railway Gazette International. 5 July 2011. http://www.railwaygazette.com/nc/news/single-view/view/bombardier-to-shed-1400-jobs-at-derby.html. 
  8. ^ "Great Western electrification and IEP approved". Railway Gazette International. 1 March 2011. http://www.railwaygazette.com/nc/news/single-view/view/gwml-electrification-and-iep-order-approved.html. 
  9. ^ "Siemens beats Bombardier to Thameslink train order". Railway Gazette International (London). 16 June 2011. http://www.railwaygazette.com/nc/news/single-view/view/siemens-beats-bombardier-to-thameslink-train-order.html. 
  10. ^ Dan Milmo (5 July 2011). "Bombardier: 1,400 Derby jobs are gone four months after PM's pledge to help". The Guardian (London). http://www.guardian.co.uk/business/2011/jul/05/bombardier-derby-jobs-gone. 
  11. ^ Brian Denny (6 July 2011). "Con/Dems collude with the EU to destroy last train building jobs in Britain". The Online Society. http://theonlinesociety.com/2011/07/condems-collude-with-the-eu-to-destroy-last-train-building-jobs-in-britain/. 
  12. ^ Robert Wright (5 July 2011). "Bombardier announces UK lay-offs". Financial Times. http://www.ft.com/cms/s/0/dba3e31e-a6d7-11e0-a808-00144feabdc0.html. 

Bibliography

  • Larkin, E.J., Larkin, J.G., (1988) The Railway Workshops of Great Britain 1823-1986,' ' Macmillan Press
  • Billson, P., (1996) Derby and the Midland Railway, Breedon Books

Further reading

  • Robertson, K., (2004) First Generation DMUs, Ian Allan Publishing
  • Marsden, C.J., (1989) Twenty Five Years of Railway Research, Haynes Publishing Co.

Coordinates: 52°54′22″N 1°27′32″W / 52.906°N 1.459°W / 52.906; -1.459


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Derby (disambiguation) — Derby is the county town of Derbyshire, England and includes: Derby Midland railway station Derby Works, railway locomotive works Derby Carriage and Wagon Works, railway works Derby may also refer to: Contents 1 Places 2 People 3 Sports …   Wikipedia

  • Derby Works — The North Midland and later Midland workshop in 2006 The Midland Railway Locomotive Works, known locally as the loco comprised a number of British manufacturing facilities in Derby building locomotives and, initially, rolling stock in Derby, UK …   Wikipedia

  • Derby — This article is about the city in England. For other uses, see Derby (disambiguation). City of Derby   City Unitary authority   Derby Cathedr …   Wikipedia

  • NZR British Rail Mark 2 carriage — NZR British Rail Mark 2 The eight S class carriages used on the Capital Connection, pulled by WAB 794 on an excursion near Woodville on 31 August 2003 …   Wikipedia

  • Melton Constable Railway Works — Recent view of the erecting shop …   Wikipedia

  • Somerset and Dorset Joint Railway — Overview Type Heavy rail Status Disused Locale …   Wikipedia

  • First Corridor — British Rail First Corridor A Mk1 FK in Blue and grey livery pictured at Bristol Temple Meads on 5th May 1984 In service 1959– Manufacturer British Railways …   Wikipedia

  • British Rail Class 310 — Infobox EMU name = British Rail Class 310 imagesize = 300px caption = Class 310 train in British Railways plain blue calls at Harrow and Wealdstone station. The driving cab features wrap around windows as originally fitted to these trains.… …   Wikipedia

  • LMS railcars — Infobox EMU name = British Rail LMS railcars imagesize = 300px caption = background = #012545 Manufacturer = Operator = British Rail Formation = Unknown Built = InService = 1933 Weight = 73 tons CarLength = CarWidth = CarHeight = Capacity =… …   Wikipedia

  • Adtranz — ABB Daimler Benz Transportation DaimlerChrysler Rail Systems (Adtranz) Adtranz Logo Type joint venture Industry Rail transportation Successor Bombardier Transportation …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”