Virginia class submarine

Virginia class submarine
USS Virginia (SSN-774)
USS Virginia
Class overview
Name: Virginia
Builders: General Dynamics Electric Boat
Newport News Shipbuilding and Drydock Company
Operators:  United States Navy
Preceded by: Seawolf class attack submarine
Cost: $1.8 billion per unit 2009[1]
Built: 2000 – present
In commission: 2004 – present
Building: 3
Planned: 30
Completed: 8
Active: 8
General characteristics
Type: Attack submarine
Displacement: 7,900 metric tons (7,800 long tons)
Length: 377 ft (115 m)
Beam: 34 ft (10 m)
Propulsion: S9G reactor
Speed: +25 knots (29 mph; 46 km/h)
Range: unlimited except by food supplies
Test depth: +800 ft (240 m)
Complement: 135 (15:120)
Armament:

12 × VLS (BGM-109 Tomahawk cruise missile) & 4 × 533mm torpedo tubes (Mk-48 torpedo)

38x torpedoes & missiles
Notes: Ships in class include: Virginia, Texas, Hawaii, North Carolina, New Hampshire, New Mexico, Missouri, California, Mississippi, Minnesota, North Dakota, John Warner

The Virginia class (or SSN-774 class) is a class of nuclear-powered fast attack submarines (SSN) in service with the United States Navy. The submarines are designed for a broad spectrum of open-ocean and littoral missions. They were conceived as a less expensive alternative to the Seawolf class attack submarines, designed during the Cold War era, and they are planned to replace the older of the Los Angeles-class submarines, nineteen of which, from a total of 62 built, have already been decommissioned.

Contents

Innovations

The Virginia class incorporates several innovations not previously incorporated into other submarine classes.[1]

Photonics Masts

Instead of a traditional periscope, the class utilizes a pair of telescoping photonics masts[1] located outside the pressure hull. Each mast contains high-resolution cameras, along with light-intensification and infrared sensors, an infrared laser rangefinder, and an integrated Electronic Support Measures (ESM) array. Signals from the masts' sensors are transmitted through fiber optic data lines through signal processors to the control center. Visual feeds from the masts are displayed on LCD interfaces in the command center.

Propulsor

The class also makes use of pump-jet propulsors, which significantly reduces the risks of cavitation, allowing for quieter and faster operations.

Improved sonar systems

The Virginia class submarines are equipped with a bow-mounted spherical active/passive sonar array, a wide aperture lightweight fiber optic sonar array (three flat panels mounted low along either side of the hull), as well as two high frequency active sonars mounted in the sail and keel (under the bow). The submarines are also equipped with a low frequency towed sonar array and a high frequency towed sonar array.[2]

The USS California will be the first Virginia-class submarine with the advanced electromagnetic signature reduction system built into it, but this system will be retrofitted into the other submarines of the class.[3]

Other Improved Equipment

Virginia Class Diesel Generator Control Panel
  • Fiber-optic fly-by-wire Ship Control System replaces electro-hydraulic systems for control surface actuation.

Construction and controversy

The Virginias were intended, in part, as a cheaper ($1.8 billion vs, $2.8 billion) alternative to the Seawolf class sumbarines, whose production run was stopped after just three boats had been completed. To reduce costs, the Virginia-class submarines use many "commercial off-the-shelf" (or COTS) components, especially in their computers and data networks. In practice, they actually cost less than $1.8 billion (in fiscal year 2009 dollars) each, due to improvements in shipbuilding technology.[1]

In hearings before both House of Representatives and Senate committees, the Congressional Research Service and expert witnesses testified that the current procurement plans of the Virginia class — one per year at present, accelerating to two per year beginning in 2012 — would result in high unit costs and (according to some of the witnesses and to some of the committee chairmen) an insufficient number of attack submarines.[6] In a March 10, 2005 statement to the House Armed Services Committee, Ronald O'Rourke of the CRS testified that, assuming the production rate remains as planned, "production economies of scale for submarines would continue to remain limited or poor."[7]

The Virginia class is built through an industrial arrangement designed to keep both GD Electric Boat and Newport News Shipbuilding and Drydock Company (the only two U.S. shipyards capable of building nuclear-powered vessels) in the submarine-building business.[8] Under the present arrangement, the Newport News facility builds the stern, habitability and machinery spaces, torpedo room, sail and bow, while Electric Boat builds the engine room and control room. The facilities alternate work on the reactor plant as well as the final assembly, test, outfit and delivery.

O’Rourke wrote in 2004 that, "Compared to a one-yard strategy, approaches involving two yards may be more expensive but offer potential offsetting benefits."[9] Among the claims of "offsetting benefits" that O'Rourke attributes to supporters of a two-facility construction arrangement is that it "would permit the United States to continue building submarines at one yard even if the other yard is rendered incapable of building submarines permanently or for a sustained period of time by a catastrophic event of some kind", including an enemy attack.

In order to get the submarine's price down to $2 billion per submarine in FY-05 dollars, the Navy instituted a cost-reduction program to shave off approximately $400 million in costs off each submarine's price tag. The project was dubbed "2 for 4 in 12," referring to the Navy's desire to buy two boats for $4 billion in FY-12. Under pressure from Congress, the Navy opted to start buying two boats a year earlier, in FY-11, meaning that officials would not be able to get the $2 billion price tag before the service started buying two submarines per year. However, program manager Dave Johnson said at a conference on March 19, 2008, that the program was only $30 million away from achieving the $2 billion price goal, and would reach that target on schedule.[10]

In December 2008, the Navy signed a $14 billion contract with General Dynamics and Northrop Grumman to supply eight submarines. The contractors will deliver one submarine in each of fiscal 2009 and 2010, and two submarines on each of fiscal 2011, 2012 and 2013.[11] This contract will bring the Navy's Virginia-class fleet to 18 submarines. And in December 2010, the United States Congress passed a defense authorization bill that expanded production to two subs per year.[12] Two submarine-per-year production resumed on September 2, 2011 with commencement of SSN-787 construction.[13]

On 21 June 2008, the Navy christened the New Hampshire (SSN-778), the first Block II submarine. This boat was delivered eight months ahead of schedule and $54 million under budget.[14] Block II boats are built in four sections, compared to the ten sections of the Block I boats. This enables a cost saving of about $300 million per boat, reducing the overall cost to $2 billion per boat and the construction of two new boats per year. Beginning in 2010, new submarines of this class will include a software system that can monitor and reduce their electromagnetic signatures when needed.[15]

In September 2010, it was found that urethane tiles, applied to the hull to dampen internal sound and absorb rather than reflect sonar pulses, were falling off while the subs were at sea.[16]

Ross Babbage has called on Australia to buy or lease a dozen Virginia class submarines from the United States.[17]

The Royal Canadian Navy is also believed to be exploring the feasibility of acquiring up to eight Virginia class submarines. [18] [19]

Tango Bravo

Because of the slow rate of Virginia production, the Navy entered into a program with DARPA to overcome Technology Barriers (TB or Tango Bravo) to lower the cost of attack submarines so that more could be built to keep up the size of the fleet.[20]

These include:[21]

  • Propulsion concepts not constrained by a centerline shaft.
  • Externally stowed and launched weapons (especially torpedoes).
  • Conformal alternatives to the existing spherical sonar array.
  • Technologies that eliminate or substantially simplify existing submarine hull, mechanical and electrical systems.
  • Automation to reduce crew workload for standard tasks

Specifications

The launching of the USS Texas (SSN-775)
Control station in torpedo room of USS Virginia (SSN-774)
USS Virginia (SSN-774) under construction
USS New Hampshire (SSN-778) the first of the Block II vessels
  • Builders: GD Electric Boat and Northrop Grumman Newport News
  • Length: 377 ft (114.91 m)
  • Beam: 34 ft (10.36 m)
  • Displacement: 7,800 long tons (7,900 t)
  • Payload: 40 weapons, special operations forces, unmanned undersea vehicles, Advanced SEAL Delivery System (ASDS)
  • Propulsion: The S9G nuclear reactor
  • Maximum diving depth: greater than 800 ft (244 m)
  • Speed: 25+ knots[22]
  • Planned cost: about US$1.65 billion each (based on FY95 dollars, 30-ship class and two ship/year build-rate)
  • Actual cost: about $1.8 billion each (as of 2009)[23]
  • Crew: 120 enlisted and 14 officers
  • Armament: 12 VLS & four torpedo tubes, capable of launching Mark 48 torpedoes, UGM-109 Tactical Tomahawks, Harpoon missiles[24] and the new advanced mobile mine when it comes available.

Boats

Block I

Block II

Block II boats are built in four sections rather than ten sections, saving about $300 million per boat.

Block III

SSN-784 through approximately SSN-791 are planned to make up the Third Block or "Flight" and began construction in 2009. Block III subs will feature a revised bow, including some technology from Ohio class SSGNs.[33][34]

  • SSN-786, construction began March 2011.
  • SSN-787, construction began Sep 2, 2011.[13]
  • SSN-788
  • SSN-789
  • SSN-790
  • SSN-791

Block IV

No block IV submarines are yet under contract. The first block IV submarine is not scheduled to be procured until FY14. Based on the planned split between block IV and block V boats, the following hull numbers will comprise block IV procurement.

  • SSN-792
  • SSN-793
  • SSN-794
  • SSN-795
  • SSN-796
  • SSN-797
  • SSN-798
  • SSN-799
  • SSN-800
  • SSN-801

Block V

Block V subs may incorporate the Virginia Payload Module (VPM), which would give guided-missile capability when the SSGNs are retired from service.[36]

  • SSN-802
  • SSN-803
  • SSN-804

See also

References

  1. ^ a b c d Baker, A. D. III (1998). Combat Fleets of the World, 1998-1999. USA. p. 1005. ISBN 1557501114. 
  2. ^ SSN774 Virginia-class Fast Attack Submarine
  3. ^ GAO-09-326SP Assessments of Major Weapon Programs, page 146
  4. ^ US Navy photo 040822-N-2653P-344 caption.
  5. ^ O'Rourke, Ronald. "Navy Attack Submarine Procurement: Background and Issues for Congress", Congressional Research Service, RL42318, December 22, 2009, p. 13. Retrieved on 11 Nov 2011.
  6. ^ "Statement of The Honorable Duncan Hunter, Chairman, Subcommittee on Military Procurement, Submarine Force Structure and Modernization". FAS Military Analysis Network. Federation of American Scientists. June 27, 2000. http://www.fas.org/man/congress/2000/00-06-27hunter.htm. Retrieved 2008-03-01. 
  7. ^ "(dead link)" (PDF). Archived from the original on September 24, 2006. http://web.archive.org/web/20060924035407/http://www.house.gov/hasc/testimony/109thcongress/Projection+Forces/3-10-05O'RourkeCRS.pdf. Retrieved 2008-03-01. 
  8. ^ "SSN-774 Virginia-class NSSN New Attack Submarine". Federation of American Scientists. January 19, 2009. http://www.fas.org/programs/ssp/man/uswpns/navy/submarines/ssn774_virginia.html. Retrieved August 6, 2011. 
  9. ^ Ronald O’Rourke (June 2, 2004). "Navy Attack Submarine Force-Level Goal and Procurement Rate: Background and Issues for Congress" (PDF). Federation of American Scientists. http://www.fas.org/man/crs/RL32418.pdf. Retrieved 2008-03-01. 
  10. ^ http://insidedefense.com/secure/defense_docnum.asp?f=defense_2002.ask&docnum=NAVY-21-12-4[dead link]
  11. ^ General Dynamics And Northrop Awarded Submarine Deal, New YorkTimes, December 22, 2008[dead link]
  12. ^ McDermott, Jennifer. "House, Senate ok defense bill for 2011; sub plan stays on track." The Day, 23 December 2010.
  13. ^ a b Construction Begins on SSN 787; Navy Transitions to Building Two Virginia Class Submarines Per Year retrieved 11 Nov 2011.
  14. ^ U.S. Navy Office of the Information - U.S. Navy Public Affairs Resources page
  15. ^ SSN-774 Virginia-class NSSN New Attack Submarine
  16. ^ Virginia Class: When does hull coating separation endanger the boat?
  17. ^ Mahnken, Tom. "Growing concern down under." Foreign Policy Magazine, 9 February 2011.
  18. ^ Weston, Greg. "Canada may Buy Nuclear Submarines" CBC 27 Oct 2011
  19. ^ Ewing, Philip. "Nuclear submarines for Canada?" DoD Buzz 28 Oct 2011
  20. ^ CRS RL32914, Navy Ship Acquisition: Options for Lower-Cost Ship Designs, page 4
  21. ^ DARPA's Tango Bravo page[dead link]
  22. ^ "Attack Submarines - SSN". Fact Sheet. U.S. Navy. 10 September 2010. http://www.navy.mil/navydata/fact_display.asp?cid=4100&tid=100&ct=4. Retrieved 2007-07-05. 
  23. ^ "Untitled". The Day. New London, CT. 2008. http://www.theday.com/re.aspx?re=4aa3b13d-81ae-4400-bc58-e83a6b4ae230. Retrieved 2008-02-23. "Dead link." 
  24. ^ NSSN Virginia Class Attack Submarine - Naval Technology
  25. ^ "Navy Takes Delivery of New Submarine". Military.com. February 22, 2008. http://www.military.com/features/0,15240,162635,00.html?ESRC=navy.nl. Retrieved 2008-03-01. 
  26. ^ "Hartford Courant". http://www.courant.com/news/local/statewire/hc-21132404.apds.m0766.bc-ct--subcjun21,0,4795469.story. Retrieved 2007-06-21. 
  27. ^ "PCU New Mexico Delivered to Navy Four Months Early". Navy.mil. December 29, 2009. http://www.navy.mil/search/display.asp?story_id=50357. Retrieved 2009-01-04. 
  28. ^ "Secretary Of The Navy Sets New Mexico Commissioning Date". Navy League of the United States. December 14, 2009. http://ussnewmexico.net/commissioning-date-announced-2/. Retrieved 2009-01-04. 
  29. ^ "USS Missouri". United States Navy. August 29, 2010. http://www.nvr.navy.mil/nvrships/details/SSN780.htm. Retrieved 2010-08-29. 
  30. ^ [1][dead link]
  31. ^ Conn. company: New sub being built at record pace - BusinessWeek
  32. ^ a b "Navy Names Two Virginia Class Submarines". DefenseLink.mil. July 15, 2008. http://www.defenselink.mil/releases/release.aspx?releaseid=12067. Retrieved 2008-07-15. 
  33. ^ http://www.globalsecurity.org/military/systems/ship/images/ssn-774-modular1.jpg
  34. ^ "Virginia Block III: The Revised Bow". http://www.defenseindustrydaily.com/virginia-block-iii-the-revised-bow-04159/. Retrieved 2008-05-20. 
  35. ^ "Navy Names Virginia Class Submarine USS John Warner Story Number: NNS090108-13". http://www.navy.mil/search/display.asp?story_id=41713. Retrieved 2009-01-09. 
  36. ^ "Virginia Payload Module (VPM)". http://www.gdeb.com/news/advertising/. Retrieved 2011-07-04. 

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • Virginia Class — may refer to three classes of warship;*Virginia class battleship : A class of pre Dreadnought battleships *Virginia class cruiser : A class of nuclear powered cruisers built during the Cold War *Virginia class submarine : A 21st century class of… …   Wikipedia

  • Ohio class submarine — USS Michigan Class overview Name: Ohio Builders: General Dynamics Electric …   Wikipedia

  • Seawolf class submarine — The Seawolf class attack submarine (SSN) was the intended successor to the Los Angeles class, ordered at the end of the Cold War in 1989. At one time, an intended fleet of 29 submarines was to be built over a ten year period, later reduced to… …   Wikipedia

  • Virginia class cruiser — The Virginia class nuclear guided missile cruisers (CGN 38 class) were a series of four double ended (with armament carried both fore and aft) guided missile cruisers commissioned in the late 1970s, which served in the US Navy until the mid to… …   Wikipedia

  • United States O class submarine — For other ships of the same name, see O class submarine. USS O 1 (SS 62) lead ship of her class in dry dock at Portsmouth Nary Yard in September 1918 …   Wikipedia

  • Alfa class submarine — The Soviet Union/Russian Navy Project 705 ( Лира / Lyra ) was a submarine class of hunter/killer nuclear powered vessels (abbreviated PLA: Podvodnaya lodka atomnaya , nuclear hunter/killer submarine). The class is also known by the NATO reporting …   Wikipedia

  • Sturgeon class submarine — The Sturgeon class (colloquially in Navy circles, the 637 class) attack submarine (SSN) were the work horses of the submarine attack fleet throughout much of the Cold War. They were phased out in the 1990s and early 21st century in favor of the… …   Wikipedia

  • Virginia (disambiguation) — NOTOC Virginia is one of the fifty United States of America.Virginia may also refer to:PlacesUnited States* Colony and Dominion of Virginia, the colony of Virginia before it became a state ** Virgineola an old name for Bermuda, once part of the… …   Wikipedia

  • Los Angeles class submarine — The Los Angeles class, sometimes called the LA class or the 688 class, is a class of nuclear powered fast attack submarines (SSN) that forms the backbone of the United States submarine fleet. With 62 submarines, this class has more boats than any …   Wikipedia

  • Ko-hyoteki class submarine — The Ko hyoteki (甲標的, Type A Target ) class of Japanese midget submarines had hull numbers but no names. For simplicity, they are most often referred to by the hull number of the mother submarine. Thus, the midget carried by I 16 was known as the… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”