Milwaukee Road class EP-1, EF-1, EF-2, EF-3, and EF-5

Milwaukee Road class EP-1, EF-1, EF-2, EF-3, and EF-5
Milwaukee Road EF-1
EF-1 #E50 in the Deer Lodge, Montana engine house, October 1974
Power type Electric
Builder General Electric
Build date 1915–1916
Total produced 42 locomotives (84 half-units)
AAR wheel arr. 2-B+B+B+B-2
UIC classification (2′Bo)(Bo)+(Bo)(Bo2′)
Gauge 4 ft 8 12 in (1,435 mm)
Locomotive weight 576,000 lb (261.3 t)
Power output Continuous: 3,340 hp (2.49 MW),
One hour: 4,100 hp (3.06 MW)
Career Milwaukee Road
Class EP-1
Locale Northwest United States
Retired January 1951–June 1974
Preserved E50 (EF-1), E57B (ES-3)
Disposition 1 EF-1 and 1 ES-3 preserved, remainder scrapped
EF-1 #10203, as new.
EF-1 side-view drawing.

The Chicago, Milwaukee, St. Paul and Pacific Railroad (Milwaukee Road) classes EP-1 and EF-1 comprised 42 boxcab electric locomotives built by the American Locomotive Company (ALCO) in 1915. Electrical components were from General Electric. The locomotives were composed of two half-units semi-permanently coupled back-to-back, and numbered as one unit with 'A' and 'B' suffixes. As built, 30 locomotives were assigned to freight service, classified as EF-1 and numbered 10200–10229. The remaining twelve locomotives were assigned to passenger service as class EP-1, numbered 10100–10111, with higher-speed passenger gearing. The design was highly successful, replacing a much larger number of steam locomotives, cutting costs and improving schedules.

In 1919, with the arrival of a newer generation of passenger power, the EP-1 locomotives were converted to EF-1 freight locomotives, and renumbered 10230–10241. In this role, they served until the 1950s, when the arrival of the Little Joe locomotives began to replace them in freight service.

Contents

Technical information

They were fitted with multiple-unit train control systems, and could thus be joined together into larger sets and operated from a single control station. They were also retrofitted with a special multiple unit control system designed by an electrical engineer of The Milwaukee Road. This enabled the crew of a Boxcab to control trailing diesel electric locomotives. However, the EF-4 "Little Joes", which were also retrofitted, were more often seen leading diesel electrics than Boxcabs, which had by then been largely relegated to the role of helper or bank engine.

The maximum speed of an EF-1 as built was 35 miles per hour (56 km/h). Higher speeds led to excessive strain on the traction motor armatures. The rebuilding programme of the 1950s raised this to 45 miles per hour (72 km/h) to help maintain faster schedules.

The two powered trucks were connected together with a ball-and-socket joint, and the couplers were also attached to the trucks. The bodywork, therefore, did not take the load of the train. Each truck had outside bar frames, allowing more room for the traction motors and equipment. The front powered truck's frames extended forward and carried an outrigger truck and the heavy snowplows the units bore.

EF-2, EF-3, EF-5 and ES-3

In the 1930s, with train tonnage increasing, the Milwaukee began to create three-unit locomotives out of the boxcab units. A simple combination of three was classified EF-2. Twelve EF-2s were assembled, and renumbered 10500–10511ACB. On these, the cab on the center (C) unit was unnecessary and just added weight and length. The center units were therefore shortened by removing the cab, the pilot truck and the frame extension; these were nicknamed "bobtails". These were assembled in between two standard units to create EF-3 sets. These "bobtail" units weighed 52,000 lb (23.6 t) lighter than a regular unit. Additional EF-2s were created, but no more were modified into "bobtails". The locomotives were renumbered in 1939, the EF-3s being numbered E25–E36, and the EF-1s E50–E73.

In 1951, five four-unit locomotives were created; these were classified EF-5 and could have any combination of regular or bobtail units in the center two positions. Their numbers gradually increased until 10 were in service in 1961.

When an odd number of EF-2s were created, a single Boxcab unit became surplus. This unit was classified as a heavy switcher and given class ES-3.

EP-1A

In 1950, two EF-1 locomotives, E22A/B and E23A/B were converted back into passenger service as class EP-1A to help the aging Bi-Polars on the Puget Sound Extension. E22 received some smoothing of its appearance, including somewhat "streamlined" cab fronts. They were repainted into the Union Pacific Railroad scheme of Armour Yellow with Harbor Mist Gray roofs, and red dividing lines. These two locomotives served until March 1961 in this role; at which time, the E23A and E23B were renumbered E22D and E22C.

Retirements

The fleet stayed intact until 1951, when two EF-1s were retired – E51A+B and E68A+B. Two units of an EF-2 were retired in 1954, and the remaining numbers held steady until the mid-1960s, when old age began to take its toll. Locomotives were patched-up until un-repairable, and units within were swapped between locomotives without being renumbered.

Most were retired by the end of 1973, but one unit, E57B and its "bobtail" companion, were kept in service as the Harlowton, Montana switcher until June 1974.

Today

Unit E50A+B, originally 10200A+B, the first locomotive built, still survives and is preserved at the Lake Superior Railroad Museum in Duluth, Minnesota. Unit E57B, originally 10211B, is now preserved at Harlowton, Montana.

Notes

References

  • Holley, Noel T. (1999). The Milwaukee Electrics. Edmonds, Washington: Hundman Publishing Company. 
  • Chamberlin, Clint. "Milwaukee Data 5". North East Rails. http://www.northeast.railfan.net/classic/MILWdata5.html. Retrieved 2006-01-05. 
  • Edson, William D. (Spring 1977). "Milwaukee Road All Time Steam, Diesel and Electric Roster". Railroad History (Boston, Massachusetts: Railway and Locomotive Historical Society Inc.) (136): 110–113. 

Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Milwaukee Road class F6 — locomotive #6409. Photo by Otto Perry at Chicago, Illinois on September 23, 1930. Power type Steam Builder Baldwin Locomotive Works Serial number …   Wikipedia

  • Milwaukee Road class L2 — Cleaning an engine near the Milwaukee Road roundhouse, Bensenville, Illinois. Milwaukee Road 470 was class L2 b 2 8 2 built by Baldwin in 1923 Power type Steam Builder …   Wikipedia

  • Milwaukee Road class A — #2 at Chicago, Illinois on September 25, 1935. Power type Steam Builder American Locomotive Company Serial number …   Wikipedia

  • Milwaukee Road class EP-3 — Power type Electric Builder Baldwin Locomotive Works / Westinghouse Build date 1919 Total produced 10 …   Wikipedia

  • Milwaukee Road class F7 — Class F7 leading the Midwest Hiawatha past Tower B17, Bensenville, Illinois, May 1943 Power type Steam Builder American Locomotive Company Serial number …   Wikipedia

  • Milwaukee Road class A2 — Power type Steam Builder Baldwin Locomotive Works Build date 1901–1909 Configuration 4 4 2 …   Wikipedia

  • Milwaukee Road class ES-2 — Power type Electric Builder General Electric Serial number 5478, 5479, 6983, 6984 Build date 1916 (2), 1919 (2) Total produced …   Wikipedia

  • Milwaukee Road class ES-1 — Power type Electric Builder General Electric Serial number 4986 Build date April 1915 AAR wheel arr. B B Locomotive weight 98,900 lb (44.9 t) Electric system 1,500 V DC …   Wikipedia

  • Milwaukee Road class EP-2 — MILW EP 2 Milwaukee Road class EP 2 Bipolar Power type Electric Builder General Electric Serial number 6978–6982 Build date …   Wikipedia

  • Milwaukee Road clase EP-1, EF-1, EF-2, EF-3 y EF-5 — Milwaukee Road EF 1 EF 1 Nº E50 en el Deer Lodge, casa de motores de Montana, octubre de 1974 Datos Tipo …   Wikipedia Español

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”