- MetroSouth Corridor
-
MetroSouth Corridor Overview Type Light rail System St. Louis MetroLink Locale Greater St. Louis Operation Operator(s) Bi-State Development Agency Technical Line length 12 miles (19 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in) The MetroSouth Corridor is a proposed light rail alignment for the St. Louis MetroLink light rail system in St. Louis, Missouri, USA. The proposed alignment would extend the Blue Line southwards from its current terminus at Shrewsbury-Lansdowne I-44 to as far as Butler Hill Rd.
Contents
History
Planning for the MetroSouth Corridor began in 1993 with the initial study of the Cross County Corridor which analyzed alternatives to improve north-south movements through the central portion of St. Louis County.[1] The resulting light rail alternatives from this study were then broken up into three segments: segment 1 became the Blue Line and was completed in 2006, segment 2 became the MetroSouth Corridor, and segment 3 became the MetroNorth Corridor.[2]
Detailed planning and environmental impact study of the MetroSouth corridor south of Shrewsbury-Lansdowne I-44 began in 2002 and was completed in 2005,[3] but a final decision on a locally preferred alternative was deferred due to the lack of a source of funding.[4]
Proposed alternatives
At the conclusion of the MetroSouth study in 2005, three primary alignment alternatives remained under consideration: the Blue alternative, the Orange alternative, and the Purple alternative. From the Shrewsbury-Lansdowne I-44 station, the Blue alternative would run southwards adjacent to the Burlington Northern Santa Fe railway terminating near Kenrick Plaza or continue to South County Center and then adjacent to I-55 terminating at Butler Hill Rd. The Orange alternative would follow the River des Peres until reaching I-55 where it turns to follow the highway southwards terminating at either Reavis Barracks Rd or Butler Hill Rd. The Purple alternative would extend the Blue Line by only 1 station, following the River des Peres and Watson Rd before terminating near Kenrick Plaza.[4]
Alignment alternative Length Stations Projected ridership Cost (2010 dollars) Purple 1.5 miles (2.4 km) 1 550 - 600 $83 - $91 million Blue (Watson Rd) 1.1 miles (1.8 km) 1 550 - 600 $630 - $700 million Blue (Butler Hill) 8.5 miles (13.7 km) 5 9,500 - 10,500 $630 - $700 million Orange (Reavis Barracks) 11.0 miles (17.7 km) 4 7,100 - 7,500 $307 - $340 million Orange (Butler Hill) 6.9 miles (11.1 km) 6 9,000 - 9,900 $587 - $649 million References
- ^ "St. Louis (Cross County Corridor)". Federal Transit Administration. http://www.fta.dot.gov/publications/reports/reports_to_congress/planning_environment_2762.html. Retrieved 30 July 2010.
- ^ "Situation Assessment for the Community Engagement Process". East-West Gateway. 23 July 1998. http://www.ewgateway.org/pdffiles/library/xco/xco-sitassess.pdf. Retrieved 30 July 2010.
- ^ "MetroSouth - Timeline". Metro South Study. http://www.ewgateway.org/metrosouth/timeline/. Retrieved 30 July 2010.
- ^ a b "East-West Gateway Board Defers Selection of MetroLink Alternative for Metro South Study Area". East-West Gateway. 3 November 2004. http://www.ewgateway.org/metrosouth/pdfs/News_Release_110404.pdf. Retrieved 30 July 2010.
- "Public Open House Meeting". MetroSouth Study. 30 August 2004. http://www.ewgateway.org/metrosouth/involved/m7/OpenHouse_Presentation8_04.PDF. Retrieved 30 July 2010.
External links
St. Louis MetroLink St. Louis MetroLink services MetroLink system features Eads Bridge • Vandeventer Avenue Bridge • St. Louis Freight Tunnel • Central West End Tunnel • Union Station TunnelRolling Stock Siemens SD-400 • Siemens SD-460Maintenance facilities and shops Ewing Yard • 29th Street YardConnections Forest Park-DeBaliviere • Gateway Multimodal Transportation Center • Lambert-St. Louis International Airport • MetroBikeLink TrailConnecting Services MetroBus • Madison County Transit • St. Charles Area Transit • Metro Call-A-Ride • Delmar Loop TrolleyMetroLink Expansion Daniel Boone Corridor • MetroNorth Corridor • MetroSouth Corridor • MetroWest Corridor • NorthWest Connector • NorthSide Corridor • SouthSide Corridor • St. Charles Corridor • SouthWest Corridor • MidAmerica Extension Phase 3 • Madison County CorridorsOperators Bi-State Development Agency • St. Clair County Transit DistrictItalic denote lines or services which are proposed and planned. Categories:- Bi-State Development Agency
- St. Louis MetroLink
- Proposed public transportation in the United States
- Rail in St. Louis, Missouri
Wikimedia Foundation. 2010.