- MetroNorth Corridor
-
MetroNorth Corridor Overview Type Light rail System St. Louis MetroLink Locale Greater St. Louis Operation Operator(s) Bi-State Development Agency Technical Line length 10–12 miles (16–19 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in) The MetroNorth Corridor is a proposed light rail alignment for the St. Louis MetroLink light rail system in St. Louis, Missouri, USA.
Proposed route
The alignment is part of the Daniel Boone Corridor and the Blue Line that connects from Clayton, St. Louis County's central business district to Florissant, Hazelwood, Ferguson, and Berkeley in North County.
External links
St. Louis MetroLink St. Louis MetroLink services MetroLink system features Eads Bridge • Vandeventer Avenue Bridge • St. Louis Freight Tunnel • Central West End Tunnel • Union Station TunnelRolling Stock Siemens SD-400 • Siemens SD-460Maintenance facilities and shops Ewing Yard • 29th Street YardConnections Forest Park-DeBaliviere • Gateway Multimodal Transportation Center • Lambert-St. Louis International Airport • MetroBikeLink TrailConnecting Services MetroBus • Madison County Transit • St. Charles Area Transit • Metro Call-A-Ride • Delmar Loop TrolleyMetroLink Expansion Daniel Boone Corridor • MetroNorth Corridor • MetroSouth Corridor • MetroWest Corridor • NorthWest Connector • NorthSide Corridor • SouthSide Corridor • St. Charles Corridor • SouthWest Corridor • MidAmerica Extension Phase 3 • Madison County CorridorsOperators Bi-State Development Agency • St. Clair County Transit DistrictItalic denote lines or services which are proposed and planned.Categories:- Bi-State Development Agency
- St. Louis MetroLink
- Proposed public transportation in the United States
- Rail in St. Louis, Missouri
- Bi-State Development Agency stubs
- Rapid transit stubs
Wikimedia Foundation. 2010.