- Severn Beach Line
The Severn Beach Line is a local
railway inBristol , UK. It runs from Narroways Hill Junction toSevern Beach , and is the successor to the Bristol Port Railway and Pier, which ran from a Bristol terminus in theAvon Gorge to a station and pier on theSevern Estuary .Passenger trains run from
Bristol Temple Meads to Severn Beach via nine local stations. The line carries little freight traffic, with most of the heavy freight traffic toAvonmouth Docks being routed via the Henbury loop throughFilton . The line has been highlighted by Thomas Cook as one of the scenic lines ofEurope . [ [http://www.bbc.co.uk/insideout/west/series6/railway.shtml BBC Inside Out - Bristol's Severn Beach Railway Line ] ]History
The Bristol Port Railway and Pier
Work began on the 'Bristol Port Railway and Pier' (BPRP) in 1863 and the line was opened on
6 March 1865 with six trains each way on weekdays and four on Sundays.It ran from a station known as "Clifton" to
Avonmouth , via Sea Mills andShirehampton . Clifton station was situated inHotwells , west of Bristol city centre between theClifton Suspension Bridge and Bridge Valley Road.As built the railway was isolated from the rest of the national network, and because of poor finances of the company, plans to extend the railway into the city centre and Temple Meads station were not realised for several more years.
Connection and extension
The
Great Western Railway and theMidland Railway decided to jointly fund a branch to connect the BPRP to both of their networks. The branch left the GWR South Wales line at Narroways Hill Junction, just north of the existing station at Stapleton Road. The branch was joined just beyond Narroways Hill by a line which left the Midland main line at Kingswood Junction, just west ofFishponds station. The first section through Montpelier to Clifton Down opened on 1 October 1874. It was quite an achievement, running though cuttings, and tunnels and over embankments and viaducts, the longest and highest as the train travels between Montpelier and Redland.The greatest engineering feature of the branch was a mile-long tunnel underneath
Clifton Down . The section through the tunnel from Clifton Down station toSneyd Park Junction, where it connected to the Bristol Port Railway, opened to goods traffic in 1877 and to passenger trains on1 September 1885 . [Maggs, C. (1981) "Rail Centres: Bristol" Ian Allan ISBN 0 7110 1153 2]As a result of this BPRP Clifton station was renamed Hotwells. The section of track from here to Sneyd Park Junction survived until 1922 when it was demolished to build the A4 Bristol Portway.
The residents of Redland successfully petitioned for a station and in April 1897 one was opened close to the Lovers Walk bridge. The ticket office was on the bridge rather than the platform. St Andrews Road station was opened in March 1917 to serve the munitions factory there. Finally Severn Beach station opened in April 1922.
The line in modern times
The line has been substantially rationalized, as with many branch lines in the UK. There are now extensive sections of single track, although in all locations where this was not originally the case, space has been left so that the second track could in theory be re-instated. The only sections at which trains can pass are on the main line between Temple Meads and Narroways Hill Junction and in the passing loops at Clifton Down and Avonmouth. All stations except Temple Meads are unstaffed, and it is only possible to purchase a ticket for immediate travel after boarding the train as presently no stations are provided with Ticket Vending Machines.
Passenger services are operated by
First Great Western using Class 143, Class 150, Class 153 or Class 158diesel multiple units . These trains are two-man-operation, as the guard is required to operated the passenger doors as well as serve as a ticket-issuing conductor, which can be a source of delays, as well as potentially a means of losing revenue. The plans for the line (see below) include a possibility of running trains with the driver opening the doors. In this case, the idea would be to free up the guard to simply check and issue tickets.In the year 2005/6, 375,000 passenger journeys were officially known to have been made on the line. [cite web|url=http://www.firstgreatwestern.co.uk/Documents/Custom/Severn%20Beach%20Line%20Development%20Plan.pdf|title=Severn Beach Line Development Plan|publisher=First Great Western News|date=2007-04-01] The main destination, other than Temple Meads, is Clifton Down, partly due to the large shopping centre immediately outside the station on Whiteladies Road.
The route has been used as a diversionary route for trains travelling north from Bristol when the normal route is closed for engineering work. The freight-only Henbury Loop connects Avonmouth with
Bristol Parkway station on the London-South Wales and Bristol-Birmingham routes.Passenger services
Prior to May 2008
On Sunday
18 May 2008 , a major timetable change came into force on the line. Prior to this the service had been gradually improving over a couple of years, services on the line have not approached the frequencies and passenger numbers seen on other city branch lines in the UK.On Monday to Fridays, 11 trains ran from Bristol Temple Meads just as far as Avonmouth with a further seven continuing all the way to Severn Beach, only in the early mornings and evenings. A connecting bus provided through journeys from Avonmouth to Severn Beach during the daytime. During the morning, two trains provided a service approximately every 40 minutes, with an hourly daytime service using only one unit. As only one train was available to run weekday evening services, when all journeys ran to Severn Beach, the frequency of services was reduced because of the longer distance to Severn Beach. On Saturdays all 16 services ran to Severn Beach, using two trains to provide an hourly service. There was no Sunday service.
Current services
Bristol City Council has agreed to subsidise a more frequent service. Since December 2007 a more frequent service has operated in morning peaks, using two trains. From Sunday18 May 2008, there is an increased service all day. [ [http://www.bristol.gov.uk/redirect?oid=PressRelease-id-24539001 Bristol City Council: Apr 2008: Fifty-four new trains a week for Severn Beach line ] ] [http://www.firstgreatwestern.co.uk/Documents/Custom/DC%20MAY%202008%20TIMETABLE/Bristol%20Temple%20Meads%20to%20Severn%20Beach.pdf New timetable from First Great Western] . Trains start earlier in the morning and finish later in the evening, with three trains in every 2-hour cycle during the daytime. In addition to improving the frequency of services this also increases turnaround time, so the timetable should be more reliable. This will have the unfortunate side-effect of trains not being at the same times past each hour.Services to Severn Beach will be reduced overall, with only one train every two hours Mondays to Fridays, as opposed to the current service provided by a bus every hour connecting with every train. However, overall journey time is shortened by 8 minutes by removing the need to change at Avonmouth. The bus continues to run on Saturdays to continue to provide, together with the through trains, one journey per hour to/from Severn Beach. For the first time in recent history, there will be a Sunday service, with hourly departures between 10am and 6pm from Bristol to Avonmouth, running until September only. St Andrew's Road and Severn Beach itself continue to have no Sunday service.
Future Plans
First Great Western and the "
Severnside Community Rail Partnership" have produced the Severn Beach Line Development Plan. This plan aims to radically increase passenger numbers, train frequencies, information and station conditions, and looks at longer term development opportunities, such as using the line to serve the Portway Park and Ride site and running a 'loop' service via new stations on the Henbury line. [cite web|url=http://www.firstgreatwestern.co.uk/Documents/Custom/Severn%20Beach%20Line%20Development%20Plan.pdf|title=Severn Beach Line Development Plan|publisher=First Great Western News|date=2007-04-01]References
External links
*http://www.severnbeachline.org - Severnside Community Rail Partnership's website for the line
*http://www.bbc.co.uk/insideout/west/series6/railway.shtml – general information
*http://www.david.frih.net/severn/ - the main source for the historical data included above
*http://www.fosbr.org.uk/ - Friends of Suburban Bristol Railways.
Wikimedia Foundation. 2010.