The Bristol and South Wales Union Railway was built to connect
Bristol ,England , with southWales . The route involved aferry crossing of theRiver Severn but was considerably shorter than the alternative route through Gloucester. The ferry was replaced by theSevern Tunnel in 1886 but part of the route continues to be used, forming parts of theCross-Country Route and theSouth Wales Main Line .History
A "Bristol and South Wales Junction Railway" was authorised by
Act of Parliament in 1846.Isambard Kingdom Brunel surveyed a route across the Severn and the ferry atNew Passage was purchased, but the line failed to raise enough money so was not built. The "Bristol, South Wales and Southampton Union Railway" proposed in 1854 to carry a line through the centre of Bristol and along theAvon Gorge to New Passage, where atrain ferry would cross the water. This became the "Bristol and South Wales Union Railway" (B&SWUR) which received its Act on27 July 1857 but using a route to the east and north of Bristol. Brunel died in 1859 and the works were completed by Robert Pearson Brereton. cite book| last = Norris| first = John| title = The Bristol & South Wales Union Railway| publisher = Railway and Canal Historical Society| date = 1985| location = Oakham| id = ISBN 0-90146-138-5 ]Construction started in 1858 and the single-track RailGauge|84
broad gauge line opened as far as the landward end of New PassagePier on8 September 1863 . The short section on the opposite side of the Severn officially opened on1 January 1864 . In 1868 the B&SWUR was amalgamated with the GWR which had operated its trains from the outset.cite book| last = MacDermot| first = E T| title = History of the Great Western Railway, volume II 1863-1921| publisher =Great Western Railway | date = 1931| location = London]The Portskewett branch was converted to RailGauge|ussg
standard gauge on13 May 1872 along with all the other broad gauge lines on that side of the river. The Bristol section was closed for one day on8 August 1873 and reopened the following day as a standard gauge line.On
1 October 1874 a junction was put in at Narroways Hill, just north ofStapleton Road railway station , to connect the GWR with theClifton Extension Railway , a joint venture with theMidland Railway to serve the affluent Clifton district. The line from Temple Meads to Narroways Hill Junction was doubled at the same time.Work had started on the
Severn Tunnel a little way down stream from New Passage in 1872 and sidings were laid at both Portskewett and New Passage in connection with sinking shafts to the tunnel workings. OnMay 29 1886 a curve was opened near South Wales Junction (between Dr Day's Junction and North Somerset Junction) to allow trains to run directly from London to the new Tunnel. The line between Narroways Hill Junction and Patchway was also doubled to carry the heavier traffic. Just short ofPilning railway station the new route diverged to south and a new station was built. The ferry and Pilning-New Passage line ceased operation after30 November 1886 and the tunnel opened for passenger trains the following day, although goods trains had already been using the new route. A new convert|1440|yd|m single track tunnel alongside the old tunnel at Almondsbury carried the Up line on a more gentle gradient from 1887. The increased traffic caused the line from Dr Day's Junction to Narroways Hill Junction to be widened to four tracks in 1891.The B&SWUR had been authorised to construct a line from Pilning to a proposed new dock at
Avonmouth in 1862, but neither the dock nor railway was built. The GWR reopened a section of the old line for goods traffic on5 February 1900 , this ran from Pilning to New Passage and then connected with a new route toAvonmouth railway station . Passenger trains ran from Avonmouth as far as a newSevern Beach railway station from10 July 1922 , and continued to new stations at New Passage and Pilning (known as "Pilning Low Level") from9 July 1928 . The service was withdrawn from23 November 1964 .tations
*Bristol Temple Meads was the
Great Western Railway terminus in Bristol opened on8 August 1840 and is still the largest station in the city.
*Lawrence Hill opened with the B&SWUR on8 September 1863 and is still served bySevern Beach Line and other local services.
*Stapleton Road opened with the B&SWUR on8 September 1863 and is still served bySevern Beach Line and other local services.
*Ashley Hill was additional station opened by the B&SWUR on13 August 1864 and closed on23 November 1964 .
*Horfield was opened by the GWR on14 May 1927 and closed on23 November 1964 .
*Filton opened with the B&SWUR on8 September 1863 . It was closed on1 July 1903 to be replaced by a new Filton Junction station, but this in turn has been replaced byFilton Abbey Wood railway station back on the original site and is served by local services on the Bristol to Cardiff and Bristol to Gloucester routes.
*Patchway opened with the B&SWUR on8 September 1863 and is still served by train services between Bristol and Cardiff.
*Pilning opened with the B&SWUR on8 September 1863 but closed when the Severn Tunnel opened on1 December 1886 .
*Pilning Low Level was opened by the GWR for the Severn Beach circular service on9 August 1928 and closed on23 November 1964 .
*Cross Hands Halt was opened by the GWR for the Severn Beach circular service on9 August 1928 and closed on23 November 1964 .
*New Passage Halt was opened by the GWR for the Severn Beach circular service on9 August 1928 and closed on23 November 1964 .
*New Passage opened with the line on8 September 1863 and closed when the Severn Tunnel opened on1 December 1886 .
*New Passage Pier opened with the B&SWUR on8 September 1863 and closed when the Severn Tunnel opened on1 December 1886 .
*Portskewett Pier was opened by the B&SWUR on1 January 1864 and closed when the Severn Tunnel opened on1 December 1886 .
*Portskewett was opened with the B&SWUR on8 September 1863 but now closed.Ferries
Two steam ferries had crossed the River Severn near
Aust for many years before the coming of the railway. The upper ferry between Old Passage andBeachley continued as before but the lower ferry, about convert|2|mi away at New Passage, was sold to the Bristol and South Wales Junction Railway in 1847. The Bristol and South Wales Union Railway eventually built newpier s for the ferry, that at New Passage being convert|546|yd|m long and that at Portskewett just convert|258|yd|m. On the night of21 May 1881 Portskewett Pier was badly damaged by a fire; it was reopened on16 June 1881 , during which time a limited train service between Bristol and Cardiff was operated over the Bristol and Gloucester line of theMidland Railway .A steam ferry, the "Saint Pierre" had been built by Pride and Williams for the New Passage crossing in 1825 and it worked there until 1831. The B&SWUR bought a new steamer, the "Gem" in 1863 but it proved unsuitable and was soon replaced by the "Relief". John Bland, a carrier and shareholder in the railway, was contracted to operate the ferry. The next vessel purchased was the "Dragon Fly", this had been used by the contractors to build the piers but was too small to work as the ferry. Instead, two paddle tugs, the "Ajax" and the "Atlas" were hired in to cover for the "Relief".
A new paddle steamer arrived in June 1864, named "Christopher Thomas" after the chairman of the B&SWUR, it had been built for the company by Henderson, Coulborn and Company at
Renfrew inScotland . A slightly larger vessel named the "Chepstow" arrived from the same shipyard on11 February 1875 . These two continued in service until the Severn Tunnel was opened in 1886. They were sold to WS Ogden at Cardiff in 1880, the "Chepstow" being renamed the "Rover". [cite book| last = Duckworth| first = Christian Leslie Dyce| coauthors = Langmuir, Graham Easton| title = Railway and other steamers| publisher = T Stephenson and Sons| date = 1948| location = Prescot] The funnels were generally painted black with a red band.References