Chinon Nuclear Power Plant

Chinon Nuclear Power Plant
Chinon Nuclear Power Plant
Chinon Nuclear Power Plant is located in France
{{{alt}}}
Location of Chinon Nuclear Power Plant
Official name Centrale Nucléaire de Chinon
Country France
Location Avoine, Indre-et-Loire
Coordinates 47°13′57″N 0°10′13″E / 47.2325°N 0.1703°E / 47.2325; 0.1703Coordinates: 47°13′57″N 0°10′13″E / 47.2325°N 0.1703°E / 47.2325; 0.1703
Status Operational
Construction began 1957
Commission date February 1, 1964 (February 1, 1964)
Operator(s) EDF
Constructor(s) GTM
Reactor information
Reactors operational 4 x 954 MW
Reactors decom. 1 x 80 MW
1 x 230 MW
1 x 480 MW
Reactor type(s) PWR
Reactor supplier(s) Framatome
Turbine information
Manufacturer(s) Alstom
Power generation information
Installed capacity 1,816 MW
Annual generation 23,925 GW·h
Net generation 555,762 GW·h
Website
EDF (French)
As of 10 November 2010

The Chinon Nuclear Power Plant (French: Centrale nucléaire de Chinon) is near the town of Avoine in the French Indre et Loire département, on the Loire river (approximately 10km from the town of Chinon). The power station has seven reactors, of which three are now closed.

The nuclear power station employs approximately 1,350 full time workers. The operator is the French company Électricité de France (EDF).

Performance

The site housed three of the first generation of French plants of a Magnox-type (UNGG) design. Since then, four of the first French PWR series have been built. The site uses four cooling towers that were built with a low profile for the specific purpose of not blocking the views of the Loire.

The plant is on the large side for a French plant. It feeds approximately 6% of the national electricity demand of France.

Reactors

Unit Type Net power Total power Construction start Construction finish Commercial operation Shut down
Chinon A1 Magnox-Reactor 70 MW 80 MW 01.02.1957 14.06.1963 01.02.1964 16.04.1973
Chinon A2 Magnox-Reactor 210 MW 230 MW 01.08.1959 24.02.1965 24.02.1965 14.06.1985
Chinon A3 Magnox-Reactor 480 MW 480 MW 01.03.1961 04.08.1966 04.08.1966 15.06.1990
Chinon B1 PWR 905 MW 954 MW 01.03.1977 30.11.1982 01.02.1984 2024 planned
Chinon B2 PWR 905 MW 954 MW 01.03.1977 29.11.1983 01.08.1984 2024 planned
Chinon B3 PWR 905 MW 954 MW 01.10.1980 20.10.1986 04.03.1987 2027 planned
Chinon B4 PWR 905 MW 954 MW 01.02.1981 14.11.1987 01.04.1988 2028 planned

Wikimedia Foundation. 2010.