- Tokuyama Dam
Infobox_Dam
dam_name= Tokuyama Dam
caption=
official_name=
crosses=
reservoir=
locale=Ibigawa, Gifu , Higashisuibara
maint=
length= 427.1 m
height= 161 m
hydraulic_head=
width=
began= 1971
open= 2008
closed=
cost= 350 billion yen
reservoir_capacity= 660,000,000 m³
reservoir_catchment= 254.5 km²
reservoir_surface= 13 km²
bridge_carries=
bridge_width=
bridge_clearance=
bridge_traffic=
bridge_toll=
bridge_id=
map_cue=
map_
map_text=
map_width=
coordinates= coord|35|39|55|N|136|30|08|E|region:JP_type:landmark|display=inline,title
lat=
long=
extra=The Tokuyama Dam is a future hydroelectric plant in
Japan .History
* December 1957 The
Ibi River was selected for study by theElectric Power Development Company at the 23rd Electric Power Development Coordinating Meeting
* May 1976 TheMinistry of Construction releases the bulletin "Policy on Tokuyama Dam Construction Project"
* December 1982 Project incorporated into Electric Power Development Basic Plan at the 90th Electric Power Development Coordinating Meeting 400 MW pumped storage plan
* May 2000 Construction on main part started
* May 2004 Plan for electrical output changed from 400 MW of pumped-storage hydropower to start in 2008, to 153 MW of conventional hydropower to start in 2014
* September 2006 Experimental filling of the reservoir behind the Tokuyama Dam beganExternal links
* [http://www.chuden.co.jp/english/corporate/newprojects/index.html Chubu Electric new projects]
Wikimedia Foundation. 2010.