- Warsaw Main Rail Station
Warsaw Main Rail Station ( _pl. Warszawa Główna) was the name of two rail stations in
Warsaw , now both defunct.History
The first idea of construction of a main Warsaw station, which would have been the nexus of all rail lines in the city, appeared in
1879 . In practical terms, with onestandard gauge line and a fewbroad gauge railway lines terminating in Warsaw in the 19th century, creating a single 'main' station would have been far from a trivial proposition. However, when Poland regained independence and the standard gauge was universally adopted, this project got revived. In1921 , when works on the modernisation of the Warsaw railway hub started, it became clear that it was necessary to demolish the obsolete Vienna Station. This having been done, passenger traffic was taken over by a temporary station on Chmielna street, which opened in 1921.Construction
It was decided that after the demolition of the Vienna Station, a new station would be constructed. The works began in 1932. The monumental complex of the Warsaw Main Station was designed by architects
Czeslaw Przybylski andAndrzej Pszenicki .Wacław Żenczykowski was thestructural engineer . This was supposed to become the most important rail station of theSecond Polish Republic and one of the most modern in contemporaryEurope .The station building was located along the Warsaw’s main street -
Aleje Jerozolimskie , betweenMarszałkowska and Emilii Plater streets, and the platforms were in a tunnel on the cross-city line ( _pl. linia średnicowa).The station was designed in the Modernist Style, with then popular
Art deco elements. The architects intended for the station to be multifunctional, therefore plenty of space had been designed for various stores, entertainment, and restaurants. As construction continued in 1938, the first passengers were able to use the partly completed Warsaw Main. However, the building was not completed because of the outbreak of theSecond World War .World War Two
A few weeks before the war, on June 6, 1939, the still unfinished station was partly destroyed in a fire which had been started by a team of reckless welding contractors. Initially many people believed that it had been an act of sabotage by German or Soviet agents. During operation of putting out the fire, led personally by the minister of the interior
Felicjan Sławoj-Składkowski , one fireman died and three were wounded.In September 1939, the station was damaged during the
Siege of Warsaw (1939) . Later, German authorities made some improvements, e.g. construction of a new roof. The station, though still unfinished and partly destroyed, remained operational. This lasted until theWarsaw Uprising when, as a result of battle, the damage to the station got significantly bigger. In January 1945 the Germans, soon before retreating from Warsaw, blew the remains up.Post-WWII
After the war, a new Warszawa Główna station (actually a few adopted tracks of a former goods yard, plus a temporary wooden building on Towarowa Street) took the mainline services over. Since 1975
Warszawa Centralna has been Warsaw’s principal station, but some scheduled and special trains continued to use the Warsaw Main station until 1997. The wooden building is still standing, though in a very poor condition, and houses a part of the Railway Museum.References
* Jerzy S. Majewski, Warszawa nieodbudowana. Lata trzydzieste, Warszawa, 2005, ISBN 83-85584-91-9
External links
* Plans of the station and phases of construction. [http://www.warszawa1939.pl/index.php?r1=glowny&r3=0]
* June 6, 1939 - Warsaw firefighters trying to extinguish the fire. [http://www.warszawa1939.pl/zdjecia/jerozolimskie/old/glowny_pozar.jpg]
* Color photo of the station, taken by an unknown German soldier in the early 1940s. [http://img134.imageshack.us/my.php?
]
Wikimedia Foundation. 2010.