- Marina Bay Floating Stadium
Infobox_Stadium
stadium_name =Marina Bay Floating Stadium
nickname =
location = Marina Bay,Singapore
broke_ground = 2006
opened = 2007
owner =Singapore Sports Council
operator =Singapore Sports Council
surface = Steel
construction_cost =
architect =Defence Science and Technology Agency
former_names =
tenants =Singapore Sports Council
seating_capacity = 30,000Marina Bay Floating Stadium, also known as Marina Bay Floating Platform ( _zh. 滨海湾浮动舞台), is the world's largest floating stage.cite news |author = Tay Suan Chiang |title = Staying afloat |publisher = "The Sunday Times" |date =
19 August 2007 |page=L7] It is located on the waters of the futureMarina Reservoir , in Marina Bay,Singapore .Made entirely of
steel , the floating platform on Marina Bay measures 120metre s long and 83 metres wide, which is 5% larger than thesoccer field at the National Stadium. The platform can bear up to 1,070tonne s, equivalent to the total weight of 9,000 people, 200 tonnes ofstage prop s and three 30-tonnemilitary vehicle s. The gallery at the stadium has aseating capacity of 30,000 people.cite news |author = Liaw Wy-Cin |title = All parade tickets given out |publisher = "The Straits Times " |date =21 June 2007 |page=H3] cite journal|author = Brenda Goh|title = New stage for the bay|year=2007 |journal = Voices@Central Singapore|volume=|issue=36, Sep/Oct 2007|issn=0219-6344|pages = 24–25]The floating stadium will be a venue for mega events on the waters of Marina Bay for five years from 2007. These events may include
sport s,concert s,exhibition s, andarts andcultural performance s. TheNational Day Parade will also be held annually for five years at the stadium, which is meant to be an interim venue in place of the National Stadium until theSingapore Sports Hub atKallang is completed in2011 .Following Singapore's successful bid to host the inaugural
2010 Summer Youth Olympics , the Marina Bay Floating Stadium will be under the spotlight during the Games, having chosen as the venue for the Games' opening and closing ceremonies. [cite news|url=http://sports.espn.go.com/oly/news/story?id=3256367|title=Singapore bests Moscow, will host 2010 Youth Olympics|accessdate=2008-03-27|publisher=ESPN ]History
The idea of a floating platform was conceived by the organising committee of the
National Day Parade 2007 . In2004 ,Colonel Teo Jing Siong, the chairman of the committee, was asked to source for a new venue for the National Day Parade as the National Stadium would be demolished. Teo had consideredJalan Besar Stadium , theSingapore Turf Club andMarina South before settling on Marina Bay, partly because of the cityskyline that would form a backdrop for the parade. TheSingapore Government evaluated that the temporary stadium is acost effective solution in lieu of the closure of the National Stadium.cite news |author = Melissa Sim |title = He took NDP from land to water |publisher = "The Sunday Times" |date =12 August 2007 |page=8]In
2005 , Teo's committee worked with theUrban Redevelopment Authority (URA) and theSingapore Sports Council on the design of the floating platform, which could also be used to host other major events.After the design was finalised, the contractor,
SembCorp Marine cite news |author = |title = Many firsts this time |publisher = "The Straits Times " |date =12 July 2007 |page=H6] , started construction of the floating platform in March2006 . The stage took 13 months to build, and by April 2007, the platform and seatinggallery were completed.Construction
Many considerations were taken into taken into account during the
design phase for the construction of the floating platform. TheDefence Science and Technology Agency , the platform's chief planner and developer, had to keep in mind not just its size and the load it could bear, but also make sure thestructure can be relocated and reconfigured to meet the requirements of different events.As a result, the platform is made of smaller platforms of pontoons, each comprising hundreds of parts. 200 pontoons were envisioned, but a unique system of connectors allowed this number to be reduced to 15, which interlock like a
jigsaw puzzle . These took one month to assemble. The connectors were designed to be light but robust.Six pylons fixed into the
seabed act as the structure's foundation. Heavy-dutyrubber rollers were used to gently guide the stage vertically to keep it from being rocked bytide s and currents. Three linkways, which connect the floating platform to the land, have special integrated joints to keep them steady.The floating platform also had to be aesthetically pleasing to fit the scenic backdrop of the belt of hotels in
Marina Centre . This limited the height of the seating gallery. The existing structures and the area's development plans capped the number of seats at 30,000.The platform has been equipped with numerous innovative features, like an internal
drainage system , cabling structures andlightning conductor s.Events
The first major event that was held at the Marina Bay Floating Stadium is the National Day Parade of 2007.cite news |author = Liaw Wy-Cin|title = National Day will bring all things S’porean |publisher = "
The Straits Times " |date =24 May 2007 |page=H5] This was followed by theSingapore Fireworks Celebrations held on 17 and18 August , 2007.cite news|url=http://www.channelnewsasia.com/stories/singaporelocalnews/view/293929/1/.html|title=Fireworks festival at Marina Bay floating platform from Aug 17-18|accessdate=2007-08-14|publisher=Channel NewsAsia ]On
25 August , 2007, the stadium was used to launch the six-week-long Waterfest Singapore 2007, which showcasesstunt s and performances by awater ski team andwakeboard professionals.cite news |author = |title = A splashing start to WaterFest |publisher = "The Sunday Times" |date =26 August 2007 |page=34] On2 September , 2007, the platform was the start and finish point for theAviva Ironman 70.3 Singaporetriathlon .cite news |author = |title = WaterFest targets 33,000 this year |publisher = "The Straits Times " |date =19 July 2007 |page=H16]From
15 September , 2007 to16 April ,2008 , the Marina Bay Floating Stadium will be closed forFormula One works in preparation for theSingapore Grand Prix in September 2008. The stadium is not available forrental until after the race.URA is exploring the idea of making the 30,000-seat gallery available for the public to view
fireworks during theNew Year's Eve countdown at Marina Bay in December 2007. Thepublic can access the platform when it is not booked for events.ee also
*
List of stadiums in Singapore
*National Day Parade, 2007 Notes and references
External links
* [http://www.marina-bay.sg/ Marina Bay: Official website]
Wikimedia Foundation. 2010.