Florida High Speed Rail is a proposed
high-speed rail network inFlorida . Funding for the system was authorized by a2000 referendum of Florida voters but repealed by 64% of Florida voters in a2004 referendum . The first phase, planned for completion in2009 , would have connected Orlando to Tampa (Phase 1 Part 1), with a later extension to St. Petersburg (Phase 1 Part 2). Later phases might have extended the network to Miami, Fort Myers, Jacksonville, Tallahassee and Pensacola.Some have argued that the wording on the 2004 referendum was misleading, and some may have assumed it was the same as the 2000 referendum and voted the opposite of what they meant to vote.
Despite the denial of funding due to the referendum passed
November 2 ,2004 , the Florida High Speed Rail Authority continues to meet, and is almost done with theenvironmental impact statement for the Tampa-Orlando segment. In January 2007 the authority issued an update letter to the Florida governor.On
October 27 ,2004 , the authority voted to prefer the consortium ofFluor Corp. andBombardier Transportation to build and operate the system, using Bombardier'sJetTrain technology.Tampa to Orlando route
In early planning stages, all routes but the one along the median of
Interstate 4 (which has been and is being widened by several road construction projects) were dropped from consideration; alternates used theCSX tracks to the south of I-4. Stations would be provided at downtown Tampa, northern Lakeland,Walt Disney World , possibly at theOrange County Convention Center (see below), and atOrlando International Airport . Lynx's #50 bus, which runs mostly express along I-4 from Walt Disney World to downtown Orlando, would likely be rerouted to serve the Disney station, which would be built on the northwest side of I-4 between US 192 and theOsceola Parkway .Orlando route selection
Two routes were considered in the Orlando area. One would have split from I-4 at the SR 536 interchange, and run east along SR 536 and SR 417 to the south entrance to
Orlando International Airport , from which it would head north to end at the planned South Terminal. The other route would continue along I-4 to SR 528, with an extra stop at theOrange County Convention Center andInternational Drive , and then run east along SR 528 and a new right-of-way east and southeast to the south entrance of the airport.The SR 417 route (Greeneway Route) was selected by a 7-1 vote on
October 27 ,2004 .Advantages of the SR 417 route
*The
Walt Disney Company announced that if the SR 417 route were built, they would direct tourists to take the train from the airport toWalt Disney World . However, since they wanted to deny competitors onInternational Drive a station, they would keep busing tourists if the SR 528 route was built.
*It would leave room for a plannedlight rail system along I-4 from Walt Disney World to downtown Orlando.
*It would be shorter and thus faster.Advantages of the SR 528 route
The Florida High Speed Rail Authority’s Vision Plan anticipates that the statewide system will be constructed in phases. The map below illustrates the potential statewide system. At this time, the Authority has completed the Final Environmental Impact Statement for the Tampa to Orlando Project Segment, and the next step will be issuance of a Record of Decision by the Federal Railroad Administration.
The Florida High Speed Rail Authority's long-term vision calls for a statewide high speed rail system to reduce traffic congestion and provide alternatives to the traveling public. The system would closely parallel existing highways and connect Florida communities, cities, airports and seaports throughout five major regions of the state. This map shows possible routes through key cities in Florida.
*An extra stop would in theory mean more ridership.
*Non-Disney area attractions would be served better.External links