- Interstate 274
Infobox road
state=NC
route=274 (Future)
type=I
maint=
length_mi=16.7
length_round=1
length_ref=
year_established=Planned construction after 2012
direction_a=South
terminus_a=
junction=
direction_b=North
terminus_b=
previous_type=
previous_route=
next_type=
next_route=Interstate 274 (abbreviated I-274) is a proposed interstate highway route that would provide a bypass around the western section of
Winston-Salem, North Carolina as part of theWinston-Salem Northern Beltway project. I-274's parent interstate is I-74. I-74 is proposed to use the eastern section of the Beltway. The northern terminus of the proposed I-274 would be at the US Highway 52/Future I-74 interchange north of Winston-Salem. The southern terminus of the route is atInterstate 40 near Clemmons though plans have the Beltway extending further east to US Highway 158/Stratford Rd. Thus a further extension of the route is possible. The "274" number is not official having not been submitted toAASHTO ; however, [ [http://www.ncdot.org/doh/preconstruct/tpb/SHC/pdf/SHC_Vision_Plan_Triad.pdf NC Strategic Highway Corridors - Triad Vision Plan] ] I-274 does appear on many [http://www.ncdot.org NCDOT] planning maps. [ [http://www.duke.edu/~rmalme/i74seg4.html I-74 in NC Progress Page, Segment 4/Winston-Salem Northern Beltway] ]Work was to begin on the Western Section of the Beltway in 1999, but was stopped by a lawsuit. When the lawsuit was resolved NCDOT then announced work would start in 2006. However, in March 2005 NCDOT postponed construction until at least 2012 due to budget shortfalls. Money planned for the Western Section will instead be used to start construction on the Eastern Section (I-74) starting in 2011. [ [http://www.interstate-guide.com/i-274_nc.html Interstate Guide - I-274] ]
ee also
*
Interstate 74 in North Carolina
*U.S. Route 421
*North Carolina Highway 67 References
Wikimedia Foundation. 2010.