Middlesex Greenway

Middlesex Greenway
Middlesex Greenway
Length 3.5 miles (5.6 km)
Location Middlesex County, New Jersey
Trailheads Metuchen
Woodbridge
Use Hiking, Cycling
Trail difficulty Easy
Season Year round
Surface Asphalt
ROW Lehigh Valley Railroad

The Middlesex Greenway is a multi-use trail in New Jersey running from the town of Metuchen to Woodbridge, for a total length of 3.5 miles (5.6 km)[1].

The current trail starts at Crows Mill Road near William Street, with a 10-foot wide asphalt surface and ends in Metuchen west of Amboy and Lake avenues. There are 12 entry points along the trail's length. The current trail construction is slated for completion in early 2012. The estimated total cost of the greenway including drainage, gateways, lighting and benches is projected to be $5 million[2]. The Middlesex Greenway Collation is pursuing expansion of the trail along the right of way west to Perth Amboy and north to South Plainfield[3].

Contents

Trail heads

Woodbridge Crows Mill Road in Woodbridge
Metuchen Middlesex Avenue in Metuchen

History

The trail's right-of-way originates from the Easton and Amboy Railroad created by the Lehigh Valley Railroad in 1875 to haul anthracite coal to a transfer dock in Perth Amboy for subsequent delivery to New York City. The line was eventually consolidated into Conrail with other bankrupt railroads in 1976. The line was abandoned in 1991[2].

Using open space funds,[4] Middlesex county obtained the property of the abandoned rail line from Conrail in December 2002 for approximately $50,000[3].

In 2004 Edison officials challenged NJDOT's plan to replace the greenway's original rail bridge with a 140 foot long tunnel-like structure to carry the 3.6-mile greenway under US Route 1. The proposed culvert would have reduced the greenway's capacity to a 14 foot wide by 10 foot high passageway which would have prevented the town's mounted police from traversing the highway[5]. Ultimately the NJDOT agreed to construct a pedestrian bridge in lieu of the culvert.[4]

In 2005 Middlesex County acquired 2.68 acres of land adjacent to the Greenway to build a park along a portion of the right-of-way. The new park provides trail access and parking, the purchase was funded with $1.25 million from Middlesex County and $100,000 from the town of Metuchen[6].

Work began in early 2010 to surface the trail using $1 million in federal stimulus money from the American Recovery and Reinvestment Act of 2009[2].

References

  1. ^ "The Middlesex Greenway". Edison Greenway Group Website. http://www.edisongreenways.org/greenway.html. Retrieved 2011-10-19. 
  2. ^ a b c "Freeholders To Use Stimulus Funds for Greenway". InJersey Website/News Record. September 1, 2009. http://njtoday.net/2009/09/01/freeholders-to-use-stimulus-funds-for-greenway/. Retrieved 2011-10-20. 
  3. ^ a b Sergio Bichao (November 5, 2010). "Work begins on Middlesex Greenway connecting Woodbridge, Edison and Metuchen". InJersey Website. http://em.gmnews.com/news/2004-11-23/Front_Page/014.html. Retrieved 2011-10-19. 
  4. ^ a b "Greenway project moves forward". Middlesex Sentinel Website. November 23, 2004. http://woodbridge.injersey.com/2010/11/05/work-begins-on-middlesex-greenway-connecting-woodbridge-edison-and-metuchen/. Retrieved 2011-10-20. 
  5. ^ Elaine Van Delelde (June 9, 2004). "Bridge to preservation not easily traversed". Middlesex Sentinel Website. http://em.gmnews.com/news/2004-06-09/Front_page/028.html. Retrieved 2011-10-20. 
  6. ^ Jay Bodas (June 21, 2005). "3 acres set aside for Greenway". Middlesex Sentinel Website. http://em.gmnews.com/news/2005-06-21/Front_page/029.html. Retrieved 2011-10-20. 

External links


Wikimedia Foundation. 2010.

Игры ⚽ Нужна курсовая?

Look at other dictionaries:

  • Middlesex County, Ontario — Middlesex County   County   Location of Middlesex County …   Wikipedia

  • List of numbered roads in Middlesex County — This page lists all of the numbered county roads in Middlesex County, Ontario. Note: when London became a separated municipality and absorbed several nearby townships, the County Road designations for them disappeared, rendering them numberless.… …   Wikipedia

  • East Coast Greenway — Infobox Hiking trail Name=East Coast Greenway Photo=American Tobacco Trail.jpg Caption=The American Tobacco Trail, which will form a section of the East Coast Greenway Length=3000 mi (proposed) Start/End Points=Maine to Florida (under… …   Wikipedia

  • Connecticut River Greenway State Park — consists of a number of separate state land holdings in the Pioneer Valley of western Massachusetts. The park includes critical wildlife and plant habitat as well as areas providing public access to the Connecticut River. The Department of… …   Wikipedia

  • North Middlesex, Ontario — North Middlesex   Township   …   Wikipedia

  • Gateway Region — The Gateway Region is located in the northeastern part of State of New Jersey in the United States of America. The area encompasses Bergen, Essex, Hudson, Passaic, Union and Middlesex counties. It is the most urban part of the state, with… …   Wikipedia

  • Dismal Swamp (New Jersey) — For the protected area in Virginia and North Carolina, see Great Dismal Swamp. Dismal Swamp Location Middlesex County, New Jersey Area 650 acres (3 km2) The Dismal Swamp is a marshy area in Middlesex …   Wikipedia

  • List of rail trails in New Jersey — This List of rail trails in New Jersey lists former railroad right of ways in New Jersey that have been converted to trails for public use and proposed rail trails. Established rail trails * Atlantic County Bikeway Former Pennsylvania Reading… …   Wikipedia

  • Columbia Trail — in Clinton Township, New Jersey Length 16.2 miles (26.1 km) Location Hunterdon County Trailheads Main Street in …   Wikipedia

  • Monroe Township Bikepath — Length 6.36 miles (10.24 km) Location Gloucester County, New Jersey Trailheads Williamstown Downer Use Hiking, Cycling Trail difficulty Easy Season Year round Surface …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”