Bexhill West Branch Line

Bexhill West Branch Line
Bexhill West Branch Line
Map showing the line
The Bexhill West Branch
Overview
Type Heavy rail
System Hastings Line
Status Closed
Locale East Sussex, United Kingdom
Termini Crowhurst Junction
50°53′19″N 0°30′05″E / 50.8887°N 0.5014°E / 50.8887; 0.5014 (Crowhurst Junction station)
Bexhill West
50°50′27″N 0°27′49″E / 50.8407°N 0.4635°E / 50.8407; 0.4635 (Bexhill West station)
Stations 3
Operation
Opened 1 June 1902
Closed 15 June 1964
Owner Crowhurst, Sidley & Bexhill Railway (1902-05)
South Eastern Railway (1905-22)
Southern Railway (1923-47)
British Railways (1948-64)
Operator(s) South Eastern & Chatham Railway (1902-22)
Southern Railway (1923-47)
British Railways (1948-64)
Technical
Line length miles 40 chains (7.24 km)
Track gauge 4 ft 8 12 in (1,435 mm) Standard gauge
Bexhill West Branch Line
Legend
Continuation to left Track turning from right
Arrow Blue Left 001.svg Hastings Line to Tonbridge & SEML
Track turning left Station on transverse track Unknown BSicon "eABZ3lg" Track turning from right
Crowhurst
Unknown BSicon "exSTR" Track turning left Continuation to right
Hastings Line Arrow Blue Right 001.svg
Unknown BSicon "exSTR"
to Hastings
Unknown BSicon "exBRÜCKE"
Combe Haven Viaduct
Unknown BSicon "exBHF"
Sidley 3 miles 47 chains (5.77 km)
Unknown BSicon "exKBHFe"
Bexhill West 4 miles 40 chains (7.24 km)

The Bexhill West Branch Line was a short double track branch line which was opened on 1 June 1902. It was built by the Crowhurst, Sidley & Bexhill Railway under the patronage of the South Eastern Railway. Diverging from the Hastings Line at Crowhurst Junction, an intermediate station at Sidley was served before the terminus was reached at Bexhill West. The line was closed under the Beeching Axe on 15 June 1964.

Contents

History

Background

In the late nineteenth century, Bexhill had expanded rapidly.[1] The town had been served by the London, Brighton and South Coast Railway since the opening of Bexhill Central on 27 June 1846.[2] In 1896, a line was promoted by the Crowhurst, Sidley and Bexhill Railway, which was nominally independent. The scheme was supported by the South Eastern Railway,[1] which entered into an operating arrangement with the London, Chatham and Dover Railway which came into effect on 1 January 1899, forming the South Eastern and Chatham Railway.[3] The Crowhurst, Sidley & Bexhill Railway Company was incorporated in 1897, and permission was granted in that year for the line's construction.[4]

The construction of the branch included a new station at Crowhurst Junction (grid reference TQ 760 129), on the Hastings Line,[1] where a private siding had existed since about 1877;[5] an intermediate station at Sidley (TQ 743 090) and the terminus at Bexhill-on-Sea (TQ 735 074). Between Crowhurst Junction and Sidley, a major viaduct was built to carry the line across a valley.[1] The line was supported by the South Eastern Railway because it was hoped that passengers would use that line instead of the London, Brighton and South Coast Railway's routes to London, which were 10 miles (16 km) or 16 miles (26 km) longer, depending on whether one travelled via Keymer Junction or Eastbourne.[1] Seven contractors' locomotives were used in the construction of the line, one of which was an 0-6-0ST named St Leonards. Over 300,000 cubic yards (230,000 m3) of earth was moved during the construction of the line.[6] Initially, the line had some success, but following the electrification of the railway between Hastings and Brighton in 1935, traffic on the branch declined.[4]

Description

The line diverged from the Hastings Line at a point 9 chains (180 m) south of Crowhurst Junction and headed in a generally southerly direction. After crossing the Combe Haven Viaduct, the line swung to the south west. Sidley station was reached at 3 miles 37 chains (5.57 km). The line then continued in a south westerly direction, which became southerly on the approach to Bexhill West, 4 miles 40 chains (7.24 km) from Crowhurst Junction.[7] The line was double track throughout.[1]

Operation

The line was operated from the outset by the South Eastern and Chatham Railway. The South Eastern Railway absorbed the Crowhurst, Sidley and Bexhill Railway Company in 1905.[4] Under the SE&CR, services were worked by the older classes of SER locomotives, which were stationed at Bexhill. These continued until 1936, when push-pull trains were introduced. Under British Railways, push-pull services were operated by H Class 0-4-4T locomotives.[8] Through services between Bexhill and Charing Cross were worked by Schools Class 4-4-0 locomotives.[9]; these were withdrawn at the beginning of the Second World War and never reinstated.[10] Between 27 November 1949 and 5 June 1950, Bo Peep tunnel was closed to traffic and all services on the Hastings line were diverted to Bexhill West.[5] A push-pull service operated between Crowhurst Junction and West St Leonards during the closure of the tunnel.[11]

When steam was eliminated from the Hastings Line, Diesel-Electric Multiple Units took over the services.[8] This took place in June 1958; a new timetable was introduced at the same time, providing the line with an hourly service.[10] During the latter years of steam on the Hastings Line, a service between Etchingham and Bexhill West was operated for schoolchildren.[6] It was continued during the early years of the Hastings Diesel units; these were six-car trains, but the service was not shown in public timetables.[12]

Closure

It is claimed that the timetables were altered to the detriment of those commuters who wished to use the line. Fares were also raised, adding a further disincentive. The line was closed as part of the Beeching Axe.[13] The last day of public services was 14 June 1964. Some of the services on that day were operated by 6S DEMU № 1007,[14] and 2H DEMU № 1120. The 6S was running reduced to four carriages at the time.[15]

Combe Haven Viaduct

The largest structure on the line was the Combe Haven Viaduct (grid reference TQ 763 104),[1] which was also known as the Filsham, Sidley or Crowhurst Viaduct.[9] It was 416 yards (380 m) long,[16] and 67 feet (20.42 m) high, with seventeen arches. The viaduct took two years to build, due to the nature of the ground it was built on.[1] Built at a cost of £244,000,[17] over 9,000,000 bricks were used in the construction of the viaduct.[1] Concrete blocks were used for the foundations, each one measuring 52 feet (16 m) by 30 feet (9.1 m) and 32 feet (9.8 m) deep.[17][18] Following the closure of the line, it was proposed in late 1968 to demolish the viaduct. Local residents were opposed to the plan, and a question was asked in Parliament by Neill Cooper-Key regarding the preservation of the viaduct, which was not listed. Kenneth Robinson answered that British Railways were prepared to transfer ownership of the viaduct to any group willing to take it, but that maintenance costs were considerable.[19] The viaduct was demolished in two stages, on 23 May and 12 June 1969.[17]

Stations

Crowhurst Junction

Crowhurst Junction was built to serve the branch. The station was provided with two through tracks and two tracks to serve the platforms. Each platform had a bay serving the branch.[1] Crowhurst Junction was 9 chains (180 m) south of the station.[7]

Sidley

Opening with the branch on 1 June 1902, Sidley station closed temporarily on 1 January 1917, not reopening until 14 June 1920.[20]

Bexhill West

Bexhill West was originally named Bexhill. It closed temporarily on 1 January 1917, reopening on 5 November the same year. It was renamed three times: to Bexhill-on-Sea in 1920; on 9 July 1923 it became Bexhill (Eastern); finally becoming Bexhill West in November 1929.[18][21] The station was provided with two pairs of platforms, two signal boxes, an extensive goods yard,[22] and an engine shed.[23] Only one of the two pairs of platforms saw regular use.[22]

References

Sources

  • Beecroft, Geoffrey (1986). The Hastings Diesels Story. Chessington: Southern Electric Group. ISBN 0 906988 20 9. 
  • Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. ISBN 1 85260 508 1. R508. 
  • Gough, Terry (1999). Branch Lines Recalled. Great Addington: Silver Link Publishing. ISBN 1 85794 126 8. 
  • Griffiths, Roger (1989). Southern Sheds in Camera. Oxford: Oxford Publishing Company / Haynes. ISBN 0-86093-415-2. T415. 
  • Hamilton Ellis, C. (1971). The London Brighton and South Coast Railway. London: Ian Allan. ISBN 071100269X. 
  • Jewell, Brian (1984). Down the line to Hastings. Southborough: The Baton Press. ISBN 0 85936 223 X. 
  • Kidner, R. W. (1963). The South Eastern & Chatham Railway. Tarrant Hinton: The Oakwood Press. 
  • Mitchell, Vic; Smith, Keith (1987). Southern Main Lines, Tonbridge to Hastings including the Bexhill West Branch. Midhurst: Middleton Press. ISBN 978 0 906520 44 4. 
  • Oppitz, Leslie (1987). Sussex Railways Remembered. Newbury: Countryside Books. ISBN 0 905392 99 X. 
  • Railway Clearing House. Pre-Grouping Railway Junction Diagrams, 1914. London: Ian Allan. ISBN 0 7110 1256 3. 
  • Whitehouse, Patrick; St John Thomas, David (1992). The Great Days of the Southern Railway. London, New York, Sydney, Toronto: Book Club Associates. CN9378. 
  • Welch, Michael (2004). Southern DEMUs. Capital Transport. ISBN 185414287-9. 

Further reading

  • Harding, Peter A. (2002). The Bexhill West Branch Line. Woking: Peter A. Harding. ISBN 09523 45862. 

Coordinates: 50°51′40″N 0°30′00″E / 50.8611°N 0.5001°E / 50.8611; 0.5001


Wikimedia Foundation. 2010.

Игры ⚽ Поможем написать курсовую

Look at other dictionaries:

  • Bexhill-on-Sea — Coordinates: 50°51′N 0°28′E / 50.85°N 0.47°E / 50.85; 0.47 …   Wikipedia

  • Bexhill railway station — Infobox UK station name = Bexhill code = BEX manager = Southern locale = Bexhill on Sea borough = Rother usage0405 = 0.942 usage0506 = 1.010 usage0607 = 1.087 platforms = 2 start = Bexhill railway station serves Bexhill on Sea in East Sussex. It… …   Wikipedia

  • East Coastway Line — East Coastway is the name used by the train operating company, Southern (formerly South Central Trains), for the routes it operates along the south coast of Sussex and Kent to the east of Brighton, England. Those to the West of Brighton are named …   Wikipedia

  • Murwillumbah railway line — Murwillumbah Branch Legend …   Wikipedia

  • Marshlink Line — The Marshlink Line, shown with other railway lines in Kent. Overview Type Heavy rail System …   Wikipedia

  • Crowhurst railway station — Crowhurst Location Place …   Wikipedia

  • British Rail Class 205 — Class 205, no. 205009 at London Victoria on 15 August 2003, with a service to Uckfield. This service no longer runs, with all trains to Uckfield now diverted to London Bridge. 2004 was the final year of service of these elderly units. This unit… …   Wikipedia

  • Hastings — For other uses, see Hastings (disambiguation). Coordinates: 50°51′N 0°34′E / 50.85°N 0.57°E / 50.85; 0.57 …   Wikipedia

  • South Eastern and Chatham Railway — The South Eastern and Chatham Railway (SE amp;CR) was a working amalgamation of two neighbouring rival railways, the South Eastern Railway (SER) and London, Chatham and Dover Railway (LC amp;DR), that operated services between London and… …   Wikipedia

  • Crowhurst, East Sussex — Coordinates: 50°53′N 0°30′E / 50.89°N 0.50°E / 50.89; 0.50 …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”