Availability based tariff

Availability based tariff

Availability Based Tariff (popularly known as ABT) is a frequency based pricing mechanism for electric power. The Availability based tariff falls under Electricity market mechanisms to charge and regulate power to achieve short term and long term network stability as well as incentives and di-incentives to market participants against deviations in committed supplies as the case may be.

Introduction

ABT Mechanism (Energy policy of India) is adopted in India (ABT Order dated January 2000 of CERC) and in a few other countries for pricing bulk power across various stakeholders. ABT concerns itself with the tariff structure for bulk power and is aimed at bringing about more responsibility and accountability in power generation and consumption through a scheme of incentives and disincentives. As per the notification, ABT was initially made applicable to only central generating stations having more than one SEB/State/Union Territory as its beneficiary. Through this scheme, the [http://cercind.gov.in/ CERC (Central Electricity Regulatory Commission)] looks forward to improve the quality of power and curtail the following disruptive trends in power sector:

*Unacceptably rapid and high frequency deviations (from 50 Hz) causing damage anddisruption to large scale industrial consumers

*Frequent grid disturbances resulting in generators tripping, power outages and powergrid disintegration

The ABT scheme has now been expanded to cover the Intrastate systems as well.

ABT Details

*What is availability?

'Availability', for the purpose of the ABT Order means the readiness of the generating station to deliver ex-bus output expressed as a percentage of its related ex-bus output capability as per rated capacity.

* How is availability calculated?

Availability of thermal generating station for any period shall be the percentage ratio of average SOC for all the time blocks during that period and rated Sent Out Capability of the generating station

Scheduling

*Each day of 24 hours starting from 00.00 hours be divided into 96 time blocks of 15 minutes each.
*Each generating station is to make advance declaration of its capacity for generation in terms of MWh delivery ex-bus for each time block of the next day. In addition, the total ex-bus MWh which can actually be delivered during the day will also be declared in case of hydro stations. These shall constitute the basis of generation scheduling.
*While declaring the capability, the generator should ensure that the capability during peak hours is not less than that during other hours.
*The Scheduling as referred to above should be in accordance with the operating procedures in force.
*Based on the above declaration, the regional load despatch centre shall communicate to the various beneficiaries their respective shares of the available capability.
*After the beneficiaries give their requisition for power based on the generation schedules, the RLDC shall prepare the generation schedules and drawal schedules for each time block after taking into account technical limitations and transmission constraints.
*The schedule of actual generation shall be quantified on ex-bus basis, whereas for beneficiaries, scheduled drawals shall be quantified at their respective receiving points.
*For calculating the drawal schedule for beneficiaries, the transmission losses shall be apportioned in proportion to their drawals.
* In case of any forced outage of a unit, or in case of any transmission bottleneck, RLDC will revise the schedules. The revised schedules will become effective from the 4th time block, counting the time block in which the revision is advised by the generator, to be the 1st one.
* It is also permissible for the generators and the beneficiaries to revise their schedules during a day, but any such revisions shall be effective only from the 6th time block reckoned in the manner as already stated.

ABT Salient Features

* ABT brings about enhanced grid discipline
* Economically viable power with right pricing
* Promote competition and efficiency
* Encourage use of Merit Order Dispatch / Economic Dispatch in India
*

ABT Issues in Implementation

* Addressing grid disturbance issues
* Gaming and avoiding the same
* Requires special meters, remote metering with open protocols and communication mechanisms to read meters timely
* Software that is comprehensive to do calculations, address regulatory issues and modifications as per different Regulatory Commission requirements.
* Interface options to various stakeholders in the ABT mechanism online to enable effective implementation and benefits to all
* Capability of power producers to be able to control their cost of production as well as flexibility in operations

Resources

* [http://www.nrldc.org/docs/abc_abt.pdf ABC of ABT]
* [http://cercind.gov.in CERC INDIA Website]
* [http://www.nrldc.org/docs/Significance_of_UI.pdf Significance of UI Mechanism for Power Pricing]

See also

*Energy

*Energy policy of India

*Renewable energy

External links

* [http://www.kalkitech.com/downindex/IntroductionToABT.pdf Introduction to ABT - A White Paper]
* [http://www.kalkitech.com/abt.htm ABT Software]
* [http://www.mercindia.org.in/pdf/Ord_17_05_2007_CNo_42_of_2006.zip MERC Order on ABT in State of Maharashtra, India introducing SMP for the first time in India]


Wikimedia Foundation. 2010.

Игры ⚽ Поможем сделать НИР

Look at other dictionaries:

  • Feed-in tariff — Part of a series on Green economics Concepts …   Wikipedia

  • Energy policy of India — The energy policy of India is characterized by tradeoffs between four major drivers: * Rapidly growing economy, with a need for dependable and reliable supply of electricity, gas, and petroleum products; * Increasing household incomes, with a… …   Wikipedia

  • List of energy abbreviations — This is a list of abbreviations found in the context of energy issues. Contents: 0–9 A B C D E F G H I J K L M N O P Q R S T U V W X Y …   Wikipedia

  • Electricity market — An electricity market is a system for effecting the purchase and sale of electricity using supply and demand to set the price. Wholesale transactions in electricity are typically cleared and settled by the grid operator or a special purpose… …   Wikipedia

  • ABT — is a three letter acronym that may refer to:* ABT (TV station) * American Ballet Theatre * Al Aqiq Airport, whose IATA airport code is ABT * Abbott Laboratories whose New York Stock Exchange ticker symbol is ABT See also * Abt, for the clerical… …   Wikipedia

  • Electrical grid — Power Grid redirects here. For the board game, see Power Grid (board game). For other uses, see Grid (disambiguation). General layout of electricity networks. Voltages and depictions of electrical lines are typical for Germany and other European… …   Wikipedia

  • United States — a republic in the N Western Hemisphere comprising 48 conterminous states, the District of Columbia, and Alaska in North America, and Hawaii in the N Pacific. 267,954,767; conterminous United States, 3,022,387 sq. mi. (7,827,982 sq. km); with… …   Universalium

  • Agriculture and Food Supplies — ▪ 2007 Introduction Bird flu reached Europe and Africa, and concerns over BSE continued to disrupt trade in beef. An international vault for seeds was under construction on an Arctic island. Stocks of important food fish species were reported… …   Universalium

  • Economic Affairs — ▪ 2006 Introduction In 2005 rising U.S. deficits, tight monetary policies, and higher oil prices triggered by hurricane damage in the Gulf of Mexico were moderating influences on the world economy and on U.S. stock markets, but some other… …   Universalium

  • china — /chuy neuh/, n. 1. a translucent ceramic material, biscuit fired at a high temperature, its glaze fired at a low temperature. 2. any porcelain ware. 3. plates, cups, saucers, etc., collectively. 4. figurines made of porcelain or ceramic material …   Universalium

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”