Tcard

Tcard

Tcard (formally "Integrated ticketing system") is the name of the contactless smartcard ticketing system that is planned to be introduced on public transport in Sydney, New South Wales.

The card would replace the existing Automated Fare Collection System on CityRail, Sydney Buses, Western Sydney Buses, Sydney Ferries and Newcastle Buses & Ferries services. It will also bring private-sector bus, rail and ferry operators into the city's integrated ticketing system.

Tcard was required to process all existing 500 variants of tickets issued in the current ticketing system. This was compared to Melbourne which only had 54 variants and Hong Kong which only had 10 fare products. cite news
last = Besser
first = Linton
title = Tcard marriage not over, but wooing's started
language = English
publisher = Sydney Morning Herald
date = 2007-11-17
url = http://www.smh.com.au/news/national/tcard-marriage-not-over/2007/11/17/1194766976803.html
accessdate = 2007-11-17
]

On 9 November 2007, the New South Wales government issued a notice of intention to terminate the contract to the developer, ERG Group.

On 23 January 2008 the New South Wales government cancelled the Tcard contract with Integrated Transit Solutions Limited (ITSL).

On 18 March 2008 the School Student Transport Scheme Tcard system was switched off in response to the terminated contract.

History

Sydney has used a number of automated ticketing systems since the opening of the Eastern Suburbs Railway in 1979. At present, government-run buses, trains and ferries use the Automated Fare Collection System, rolled out between 1988 and 1993.

A replacement system, based on smart card technology, was first announced by the New South Wales Government in 1996. The Government put the project up for tender attracting competing bids from US-based Cubic Transportation Systems, Inc., which created the CityRail magnetic strip system and Perth-based ERG Group. The contract was initially awarded to ERG Group but Cubic launched legal action against ERG and the NSW Department of Transport, obtaining an injunction against the contract. Finally on 26 July 2002, the Supreme Court of New South Wales ruled in favour of ERG and the Department of Transport. cite news
title = Sydney smart card lawsuit dismissed
language = English
publisher = ferret.com.au
date = 2002-07-26
url = http://www.ferret.com.au/articles/z1/view.asp?id=94645
accessdate = 2007-10-29
] cite news
author = New South Wales Supreme Court
title = Cubic Transportation Systems Inc & Anor v State of New South Wales & 2 ors [2002] NSWSC 656
language = English
publisher = Australasian Legal Information Institute (AustLII)
date = 2002-07-26
url = http://www.austlii.edu.au/cgi-bin/sinodisp/au/cases/nsw/supreme_ct/2002/656.html
accessdate = 2007-10-30
] As a result, the contract to install and operate Integrated ticketing project, or Tcard, as the plan became known, was finalised and awarded to ERG Group at the end of 2002. ERG previously developed the Octopus Card smart card ticketing system in Hong Kong and delivered magnetic stripe based ticketing systems in both Sydney and Melbourne in the 1990s.

In 2005, a limited trial of the technology involving school children using the School Student Transport Scheme was undertaken, and expanded to cover all private-sector bus services in 2006.

In a bid to smooth the introduction of Tcard, the government established the Public Transport Ticketing Corporation to oversee the project. The corporation commenced operations in July 2006. Originally slated for a 2007 introduction, the Tcard rollout timetable project was pushed back. Ridiculing the revised timetable, opposition transport spokesman Barry O'Farrell told Parliament that "The only smart move by the Minister for Transport is putting off implementation of the full operation of the Tcard until after the 2007 state election campaign." [cite hansard
url= http://www.parliament.nsw.gov.au/prod/parlment/hanstrans.nsf/v3ByKey/LA20060301
house= New South Wales Legislative Assembly
date= 2006-03-01
] .

In mid 2006, the future of the project was in doubt as ERG Group was forced to borrow $14 million to prop up company finances. The government moved to renegotiate the contract, having already spent $54 million. cite news
last = Baker
first = Jordan
title = Not the ticket: Tcard in doubt
language = English
publisher = Sydney Morning Herald
date = 2006-07-06
url = http://www.smh.com.au/news/national/not-the-ticket-tcard-in-doubt/2006/07/05/1151779016458.html
accessdate = 2007-10-29
]

In April 2007, an official letter from the Public Transport Ticketing Corporation was sent to ERG complaining about numerous concern such as software problems dogging the project. cite news
last = Besser
first = Linton
title = Cruel Tcard twist to hit commuters
language = English
publisher = Sydney Morning Herald
date = 2007-10-11
url = http://www.smh.com.au/news/national/cruel-tcard-twist-to-hit-commuters/2007/10/10/1191695991669.html
accessdate = 2007-10-11
]

Beginning August 2006, commuter field trials were held on selected lines of Sydney Buses and the Punchbowl Bus Company. cite news
title = Sydney volunteers needed for transport ticket trial
language = English
publisher = ABC Online
date = 2006-08-29
url = http://www.abc.net.au/news/stories/2006/08/29/1726533.htm
accessdate = 2007-10-29
] The trials hit a hitch when bus drivers threatened a boycott due to the machine crashing when printing tickets, distracting drivers, which in turn led to safety issues. [cite news
last = Baker
first = Jordan
title = Driver boycott delays Tcard once again
language = English
publisher = Sydney Morning Herald
date = 2007-06-15
url = http://www.smh.com.au/news/national/driver-boycott-delays-tcard-once-again/2007/06/14/1181414469692.html
accessdate = 2007-08-02
] Discontent among ground level workers involved with the trial renewed calls for the Tcard system to be scrapped. cite news
last = Besser
first = Linton
title = Trial stalls as travel card is shunned
language = English
publisher = Sydney Morning Herald
date = 2007-08-27
url = http://www.smh.com.au/news/national/trial-stalls-as-travel-card-is-shunned/2007/08/26/1188066945982.html
accessdate = 2007-10-30
]

On November 9, 2007, the New South Wales government issued a notice of intention to terminate the contract with ERG. cite news
last = Clennel
first = Andrew
title = $64m Tcard fiasco over
language = English
publisher = Sydney Morning Herald
date = 2007-11-09
url = http://www.smh.com.au/news/national/64m-tcard-fiasco-over/2007/11/09/1194329499286.html
accessdate = 2007-11-09
] On the 23rd of January 2008, the NSW government announced it had terminated the contract and would be seeking to recover $95 million from ERG.

On July 3, 2008 after 3 months of a terminated contract and a $200m lawsuit by ERG it was revealed that the Tcard system project had been revived by cabinet. This decision also required the state government to change the structure of its fare system to suit the Tcard. cite news
last = Besser
first = Linton
title = Tcard: Here we go again
language = English
publisher = Sydney Morning Herald
date = 2008-06-03
url = http://www.smh.com.au/news/national/tcard-here-we-go-again/2008/07/02/1214950853856.html
accessdate = 2008-06-03
]

Technology

Tcard is based on smart card technology and employs the 13.56MHz MIFARE RFID technologyFact|date=March 2008. A MIFARE DESfire chip embedded in the Tcard communicates with the card reader through RFID induction technology. These cards require only close proximity to an antenna to complete transaction. They are often used when transactions must be processed quickly or hands-free, such as on mass transit systems, where smart cards do not have to be removed from a wallet for use.

Like smart cards with contacts, contactless cards do not have a battery. Instead, they use a built-in inductor to capture some of the incident radio-frequency interrogation signal, rectify it, and use it to power the card's electronics.

Similar systems operate in many cities in Asia, Europe, and North America. Particularly successful examples including the Octopus card of Hong Kong (also developed by ERG) and the Oyster card of London. A smartcard system called myki is planned for Melbourne, the SmartRider system has been launched in Perth in 2007, and the TransLink Go card launched in Queensland in 2008. See List of smart cards for a list of smart cards, including integrated public transport ticketing systems.

References

See also

* myki - "Melbourne's smartcard ticketing system"
* MultiRider - "Perth's smartcard system"
* SmartRider
* Translink go card - "Brisbane's smartcard system"

External links

* [http://www.tcard.com.au/ Tcard Website]
* [http://www.erggroup.com/products/index.htm ERG Group Products]
* [http://www.nxp.com/news/identification/articles/success/s96/ MIFare-based public transport in Australia]
* [http://mifare.net/products/mifare_desfire.asp MIFARE DESFire]


Wikimedia Foundation. 2010.

Игры ⚽ Нужен реферат?

Look at other dictionaries:

  • Opal card — Opal Location Greater Sydney, Wollongong, Newcastle Launched 2012 Technology Contactless smart card by Cubic Corporation Manager Transport for NSW Currency …   Wikipedia

  • ERG Group — is an Australian based technology company with offices worldwide. It designs, supplies and operates Automated Fare Collection (AFC) systems for the global transit industry. The company has been listed on the Australian Securities Exchange under… …   Wikipedia

  • CityRail — An S Set train enters Museum Station …   Wikipedia

  • Public transport in Sydney — Sydney and its surrounding regions is served by an extensive network of public transport services. According to the New South Wales State Plan, the state has Australia s largest public transport system. Indeed, in the 1920s, Sydney also boasted… …   Wikipedia

  • Automated Fare Collection System — Fact|date=February 2007The system, developed by AES Prodata (now ERG Transit Systems), is based on cardboard or plastic magnetic stripe card tickets featuring a magnetic stripe on one side and printed journey information on the other.The… …   Wikipedia

  • Automated fare collection system (Sydney) — Ticket barriers at Mascot station. The Sydney automated fare collection system (AFC) is the name given to three interoperable automated ticketing systems for buses, trains and government run ferries in and around Sydney, Australia. The system was …   Wikipedia

  • Eastwood railway station, Sydney — Cityrail Station alt|code=EAW| station name=Eastwood servicearea=Newcastle Central Coast Line servicearea color=#Newcastle and Central Coast line colour servicearea textcolor=white servicearea2=Northern Line servicearea color2=#Northern line… …   Wikipedia

  • List of New South Wales government agencies — Government in New South Wales is delivered by a number of agencies, grouped under areas of portfolio responsibility. Each portfolio is led by a minister appointed from the Parliament of New South Wales. The bulk of the services in a portfolio… …   Wikipedia

  • Shorelink — is a commuter bus company serving suburbs on the upper North Shore of Sydney, Australia. On September 3 2001, the company was acquired by French public transport giant Transdev from the John A Gilbert group.Shorelink was formed from the… …   Wikipedia

  • Myki — For the town in Greece see Myki, Greece. myki (pronounced IPAEng|ˈmaɪkiː) is the name of the contactless smartcard ticketing system to be introduced on public transport in Victoria, Australia. myki is designed to replace a number of ticket… …   Wikipedia

Share the article and excerpts

Direct link
Do a right-click on the link above
and select “Copy Link”