Chapelcross was a
Magnox nuclear power plant located near the town of Annan inDumfries and Galloway in south westScotland . It was the sister plant to Calder Hall inCumbria ,England , both commissioned and originally operated by the United Kingdom Atomic Energy Authority.The primary purpose of both plants was to produce weapons-grade
plutonium for the UK's nuclear weapons programme), but they also generated electrical power for the National Grid.Location
Chapelcross occupies a 92 hectare site on the location of former WW2 training airfield, RAF Annan, located 3 km north east of the town of
Annan in the Annandale and Eskdale district within theDumfries and Galloway region of south westScotland . The nearest hamlet is Creca.History
Chapelcross was the sister plant to
Calder Hall inCumbria ,England . Construction was carried out byMitchell Construction and was completed in 1959. [Indictment: Power & Politics in the Construction Industry, David Morrell, Faber & Faber, 1987, ISBN 978-0571149858] The primary purpose was to produceplutonium for the UK's nuclear weapons programme (seeWE.177 ). Electricity was always considered to be a by-product.
The Chapelcross Works was officially opened on 2nd May, 1959 by theLord Lieutenant of Dumfries shire, Sir John Crabbe. It was initially owned and operated by the Production Group of theUnited Kingdom Atomic Energy Authority (UKAEA) until the creation of British Nuclear Fuels Limited (BNFL ) in 1971 by an act of Parliament. The site then operated in conjunction withCalder Hall under the banner of BNFL’s Electricity Generation Business (EGB) until rebranding, relicensing and restructuring of the various nuclear businesses operated by HM Government under the umbrella legal entity ofBNFL took place in April 2005.
Ownership of all of the site’s assets and liabilities was transferred to TheNuclear Decommissioning Authority (NDA), a new regulatory body created as a result of The Energy Act of 2004. The site was then operated under the two-tier Site Management Company/Site License Company (SMC/SLC) model byBritish Nuclear Group ’s Reactor Sites business as SMC andMagnox Electric Ltd as the SLC. In June 2007, EnergySolutions LLC bought the Reactor Sites Management Company Ltd (consisting of two operational divisions, Magnox North and Magnox South) fromBritish Nuclear Group .Several significant events in 2001 (see below) persuaded
BNFL to upgrade the fuel routes of bothCalder Hall and Chapelcross to near modern standards at a cost of tens of millions of pounds to guarantee that a License Instrument would be granted by the NII to permission final defuelling. The engineering work is being carried out by BNS Nuclear Services (Formally Alstec).*See Seq. No. 16 in http://www.hse.gov.uk/nuclear/cn3qanda.pdf
*http://www.babcock.co.uk/opco/nuclear/index.phpGeneration ceased in June 2004.
Decommissioning and the Cooling Towers
The
Health and Safety Executive (HSE) granted consent to carry out decommissioning projects at Chapelcross under the regulations to Magnox Electric Ltd on September 26, 2005. The first visible sign ofdecommissioning was controlled demolition at 09.00 BST on May 20, 2007 of the four natural draught concretecooling tower s of the same hyperboloid design as conventional inlandpower station s such as Didcot, Drax, Ferrybridge and Fiddler’s Ferry. The explosions were designed to remove a section of the cooling towers’ shells. Approximately two thirds of the circumference and two thirds of the shell legs were removed by the blasts, causing a controlled collapse of each tower. The charges were fired sequentially, reducing the convert|300|ft|m|abbr=on high towers to an estimated 25,000 tons of rubble in less than 10 seconds. Those atCalder Hall were demolished on September 29, 2007.
Some local people (including site employees) were opposed to the obliteration of such a proud symbol of the region’s industrial heritage and contribution to the local economy and national defence. The towers were considered a local landmark that could be seen from a distance of up to fifty miles in good weather conditions.British Nuclear Group and the NDA prioritised conventional demolition over deplanting and post-operational clean-out (POCO) of the nuclear facilities on the site. It is somewhat ironic that a large part of the shell of tower 1 managed to resist the explosives despite having a visible bulge that resulted from a construction anomaly.
Official and amateur video footage of the demolition can be found on the following websites:
*http://www.nda.gov.uk/news/chapelcross-demolition.cfm
*http://news.bbc.co.uk/1/hi/scotland/south_of_scotland/6673817.stm
*http://www.youtube.com/watch?v=3h0OFZVRWQUPlant Design
The plant design was essentially the same as
Calder Hall comprising four 180 MW(th)graphite moderated,carbon dioxide coolednuclear reactor s fuelled by natural abundanceuranium (0.71% 235U) enclosed inmagnesium -alloy cans; the principal difference being in plant layout. Since Chapelcross was commissioned from the outset as a four reactor site (the option for a further four reactors was not exercised) rather than separate two-reactor sites as at Calder ‘A’ and ‘B’ stations, the site layout was more compact. There is a single turbine hall housing all eight turbines which were originally rated at 23 MW(e) but progressively uprated to 30 MW(e) as the reactor thermal output was uprated to nominally 265 MW(th).
Reactor 1 had the same core design asCalder Hall (i.e. unsleeved), but the fuel channels of Reactors 2, 3 and 4 were fitted withgraphite sleeves to allow the bulk moderator to run some 80°C hotter to limit the effects of in-servicegraphite damage due toirradiation . Two of the reactors were used to producetritium for the UK’s strategic nuclear deterrent and therefore requiredenriched uranium fuel to offset theneutron absorbing effect of thelithium target material.ite Layout and Facilities
The south part of the site consists of a modular administration building, four reactor buildings, turbine hall, maintenance workshops, stores, fuel element cooling pond building,
tritium processing plant (CXPP) and new flask handling facility (FHB). The part of the site referred to as north site consists of legacy buildings including aircraft hangars, agraphite handling laboratory and a large building that originally housed some 10,000 drums of yellowMagnox Depleted Uranium (MDU) trioxide arising from reprocessing atSellafield .
Liquid effluent is disposed of via a 5 km long pipeline to theSolway Firth . All environmental discharges are subject to an annual discharge authorisation which is regulated by theScottish Environment Protection Agency (SEPA).Chapelcross produced
tritium for the Polaris and Trident strategic nuclear deterrents from about 1980 until 2005. This was achieved byneutron bombardment oflithium target material and thetritium gas extracted in the Chapelcross Processing Plant (CXPP). This facility was managed byBNFL on behalf of the Ministry of Defence (MoD). The material was transferred to Aldermaston via secure road convoys which could occasionally be spotted entering and leaving the plant. Because of involvement in the defence programme, the site was not subject to international safeguards until 1998.Technical Details
Operating Experience and Incidents
All information presented below is in the public domain and external hyperlinked references to official reports and information are included where available.
Charge Pan Movement Relative to the Core (September 2001)
Because of known shrinkage of the
graphite moderator bricks in the core due to in-service irradiation effects, some of the steel charge pans on top of them had become dislocated from their design position in the interstitial channel and were suspended from the Burst Can Detection (BCD) pipework. This was most prevalent in Reactor 1 because of the different core design to Reactors 2, 3 and 4. BNFL were unable to make an adequate safety case or effect an economic repair and therefore, Reactor 1 did not return to power from its annual outage in August 2001. The core of Reactor 4 was repaired but this reactor did not return to power after the repair.cite web
url=http://www.hse.gov.uk/nuclear/llc/2002/chap12.htm
publisher=HM Nuclear Installations Inspectorate
title=Chapelcross - Quarterly Report for 1 July 2001 to 30 June 2002]Dropped Basket of Irradiated Fuel Elements (July 2001)
During routine defuelling activities on Reactor 3, a basket containing twenty-four low rated irradiated Magnox fuel elements fell a few feet within the discharge machine onto the door at the top of the fuel discharge well. Remote TV camera inspections revealed that twelve of the elements had fallen just over 80ft (24.4m) down the discharge well into a water filled transport flask at the bottom. The NII initiated an investigation because dropping irradiated fuel elements is a serious issue even when, as in this event, BNFL had advised NII that there had been no release of radiological activity. [cite web
url=http://www.hse.gov.uk/nuclear/chapelx.pdf
publisher=HM Nuclear Installations Inspectorate
title=An investigation into a dropped fuel element incident at Chapelcross Nuclear Power Station]Leak of Magnox Depleted Uranium (MDU) Trioxide (July 2001)
A small amount of MDU leaked from some corroded mild steel drums due to rainwater ingress and leaching. MDU is a dense yellow powder that is less radiologically toxic than naturally occurring uranium but chemotoxic in a similar manner to lead. Owing to its high
density and lowsolubility , it does not tend to disperse far and dry spills are easy to clean up. This material was stored at the larger sites, includingCapenhurst in mild steel drums. BNFL has upgraded the fabric of the building and the original drums are being overpacked intostainless steel drums and dispatched toCapenhurst for long-term storage.Exposure of Worker to an Irradiated Fuel Element (First Quarter 2001)
During refuelling operations on Reactor 2, an irradiated fuel element failed to release from the grab (this is used to hold an element while it is withdrawn from a reactor). Routine methods were used to release the grab. However, the irradiated fuel element snagged during the operation and was lifted out of its shielding resulting in the operators on the pile cap being exposed to the intense radiation being emitted from the irradiated fuel element. Personnel responded quickly, and the radiological dose received by them was small.
The event revealed shortfalls in the safety of the refuelling operation and the licensee took the immediate step of halting all refuelling operations while it investigated the event and reviewed the safety of the equipment. The NII investigated the event and judged that it was due to inadequate design and operation of the equipment.
The incident was classified as Level 1 (anomaly) on the International Nuclear Event Scale (INES). [cite web
url=http://www.hse.gov.uk/nuclear/quarterly-stat/2001-1.htm
publisher=United Kingdom Health and Safety Executive
title=Statement of nuclear incidents at nuclear installations]Boiler shell defect (June 1997)
Cracks associated with brackets in Heat Exchanger 6 on Reactor 2 were discovered during a routine ultrasonic inspection. Metallurgical examination of samples of the defect showed that:
(a) it originated during fabrication in the workshop and prior to an over-pressure test of 2.35 times the design pressure (a loading significantly in excess of a modern pressure vessel code requirement).
(b) there was no evidence of in-service fatigue crack growth.
(c) The material in which the crack was located was different from that specified in the design. Similar material was also identified in other heat exchangers, and no additional cracks of structural significance were revealed during comprehensive inspections. The NII considered the material to be adequate and within the bounds of the heat exchanger safety case.
*See http://www.hse.gov.uk/nuclear/nsn/nsn1497.htm
*http://www.hse.gov.uk/nuclear/nsn/nsn1598.htmFatal Accident (ca. 1978)
Response reference 120714 in House of Commons Hansard written answers for 5 May 2000 (pt 5) shows that BNFL was fined £200 in 1978 for a fatal accident at Chapelcross.
*See http://www.publications.parliament.uk/pa/cm199900/cmhansrd/vo000505/text/00505w05.htm
ingle Channel Fuel Clad Melt (May 1967)
Fuel in a single channel in Reactor 2 that was loaded with fuel elements under evaluation for the commercial reactor programme experienced a partial blockage, attributed to the presence of graphite debris (see fuel element failure). The fuel overheated and the
Magnox cladding failed, causing contamination to be deposited in one region of the core. The reactor was restarted in 1969 after successful clean-out operations and was the final reactor to cease operation in February 2004.References
ee also
*
Nuclear weapons and the United Kingdom
*Nuclear power in Scotland
*Nuclear power in the United Kingdom
*Energy policy of the United Kingdom
*Energy use and conservation in the United Kingdom
*Radioactive waste External links
*http://www.chapelcrosssite.co.uk/
*http://www.magnoxelectric.com/*oscoor gbx|NY217697
Wikimedia Foundation. 2010.