- Denver Federal Center
-
Denver Federal Center is located in Lakewood, Colorado and is the home to about 6,200 employees for many Federal government of the United States agencies. The Denver Federal Center encompasses an area of about 670 acres (2.7 km2) and has 90 buildings comprising over 4,000,000 square feet (400,000 m2) of office, warehouse, lab and special use space. There are 26 different Federal agencies on-site, making it the largest concentration of Federal agencies outside of Washington, D.C.
The major employers at the Denver Federal Center include the United States Department of the Interior (and its Bureau of Land Management, Bureau of Reclamation, and United States Geological Survey) and the General Services Administration, Special facilities at the Denver Federal Center include the National Ice Core Laboratory.
Contents
History
Early settlement
Major Jacob Downing, Colorado pioneer and judge, purchased the land in the late 1860s and developed it into a ranch, raising Arabian horses. Downing played a role in settling the West. He introduced new agriculture and wildlife, and helped lay the foundations for the city of Denver.
Thomas S. Hayden, a prominent Denver resident, purchased the Downing estate in 1913. He expanded it into a 20,000 acre (80 km²) cattle ranch.
World War II
The federal government purchased 2,040.207 acres (8.25642 km2) from the Hayden family in December 1940 for the purpose of building an ordnance (ammunition) plant, to be named Denver Ordnance. The site was chosen for its rural setting; because it was far from the nation's borders, it was presumed safer than coastal areas from enemy sabotage or attack. In late January 1941, the War Department signed a contract with the Remington Arms Company to produce small arms ammunition. Construction of the Plant started in early March, 1941. Rapidly, the Government built over 200 buildings for the new Denver Ordnance complex, and ammunition production commenced in late September, 1941. Denver Ordnance soon became known for the high quality and accuracy of its ammunition, particularly its lots of .30-06 Springfield rifle ammunition known as M2 Ball, which were highly prized by snipers and other rifle marksmen in the U.S. Army.[1] At the height of production in 1943, the Denver Ordnance Plant was the 4th largest “city” in Colorado with a workforce “population” of more than 22,000. These employees worked day and night, producing over six million cartridges a day.
Cold War
When World War II ended, ammunition production ended and the Denver Ordnance Plant became federal surplus property. A portion of the Ordnance Plant facility was converted into office, warehouse, and laboratory space for several federal agencies. This smaller facility was given a new name: the Denver Federal Center.The Federal Center is bounded on the north by Sixth Avenue (U.S. Route 6), on the East by Kipling Street, and on the South by Alameda Avenue. The western boundary of the Federal Center is just east of Union Blvd.
Building 810, in the southwest corner of the Federal Center was once the largest warehouse west of the Mississippi River and in 1965 was state-of-the-art and fully automated. It contained all the supplies needed to service all government facilities for the General Services Administration (GSA). Today, Building 810 is the home of several operations for the U.S. Geological Survey (USGS), including the distribution facility for all the USGS topographic maps and publications and the storage facilities for all geologic and ice core samples drilled from around of the world.
Building 710 is an underground bunker complex designed to withstand a nuclear blast. The building was constructed by Army Corps of Engineers and completed in 1969 and has a total space of 36,000 square feet (3,300 m2). It was intended as a base for federal operations during a nuclear attack and was designed to house 300 people for up to 30 days in the event of a nuclear war. On August 2, 2000 the structure was added to the National Register of Historic Places. It was chosen for its connection to Cold War history and its architectural significance. Today Building 710 houses the Region VIII Office of the Federal Emergency Management Agency. [2]
Environment
After the closure of the Denver Ordnance Plant, the GSA and other agencies disposed of miscellaneous wastes, including chemicals, contaminated material, and building and road demolition debris. The waste was disposed in multiple sites throughout the Denver Federal Center, primarily in the Southwest and Northwest landfills, and the former United States Environmental Protection Agency Superfund Sites CO6470000039 and CO1680090031. As a consequence of the materials disposal, the EPA and the Colorado Department of Public Health and Environment (CDPHE) have considered these areas to be significantly contaminated by hazardous waste. Excessive levels of chemicals were found in the debris, soil, ground water and surface water. Asbestos-containing materials were found as well. [3] [4]
During the 1980s, a chlorinated solvent leak emanated from an underground storage tank near Building 52. At the time, the hazardous material was managed by the United States Department of Transportation. The storage tank contained 1,1,1-trichloroethane (TCA), used to dissolve asphalt samples for testing. The leak caused a large groundwater solvent plume to spread beyond the DFC's eastern boundary and contaminate neighboring wells. To mitigate groundwater contamination by the chlorinated solvents, in 1996 the U.S. Geological Survey served as an advisor to the U.S. Army Corps of Engineers in the construction of in-ground permeable reactive barriers. The permeable reactive barriers neutralize the solvents in the ground water. The groundwater is chemically altered as it passes through the barriers made with zero-valence iron. TCE and dichlorethene are found in concentrations of higher than 200 parts per billion as they enter the barriers and measure less than one part per billion as the groundwater exits the barriers. [5] [6]
In 2006 the USGS notified the Nuclear Regulatory Commission (NRC) of a leak from a water storage tank containing radioactive water and equipment. The impacted tank is used for equipment storage and not reactor operations. An estimated 575 gallons of water leaked into the ground, although USGS officials claimed there was no evidence of contamination measured at a nearby groundwater monitoring well at that time. The USGS has operated the non-power nuclear reactor since 1969. [7] [8] [9]
Plans
The Denver Federal Center is the future home of St. Anthony Central Hospital. This development is the first private project to be housed at the Denver Federal Center.
The western edge of the property has been identified as the future location of a major Regional Transportation District (RTD) intermodal transit facility and Park-n-Ride for light rail and bus service, with light rail expected to come on-line by 2013.
On July 9, 2007 the Lakewood City Council voted to annex, zone and vest the Denver Federal Center. Lakewood City Manager signed an offer to purchase 65 acres on the west side of the Denver Federal Center for $25 million. The purchase price would be reimbursed to the city through the sale of land to St. Anthony's Hospital and the Regional Transportation District (RTD). [10] On August 3, 2007 the The U.S. General Services Administration (GSA) Rocky Mountain Region awarded contract worth a $6.9 million to SunEdison for designing and constructing a solar park at the Denver Federal Center. The one megawatt photovoltaic system will generate nearly 10 percent of the Denver Federal Center's peak electricity demand. The system is scheduled to be completed by the middle of December 2007. [11]
External links
Coordinates: 39°43′11″N 105°07′16″W / 39.719632°N 105.12105°W
References
- ^ George, John (Lt. Col.), Shots Fired In Anger, NRA Press (1981), pp. 81, 428, 434-435
- ^ "Cold War history/Denver bunker added to registry", The Gazette (Colorado Springs), 2000-08-02, http://findarticles.com/p/articles/mi_qn4191/is_20000802/ai_n9976376/pg_1
- ^ GSA & Colorado Department of Public Health and Environment (2008-06-09), Environmental Cleanup Work at the Southwest Landfill on the DFC, http://www.cdphe.state.co.us/hm/dfcfs080606.pdf
- ^ EPA (1995), "List of Large Quantity Generators in the United States" (– Scholar search), The National Biennial RCRA Hazardous Waste Report, http://www.epa.gov/epaoswer/hazwaste/data/br95/lqga-n95.pdf[dead link]
- ^ McMahon, P.M. (1998), "Stopping Contamination in Its Tracks", U.S. Geological Survey, http://www.nwrc.usgs.gov/world/content/water2.html
- ^ EPA (08/01/06), "Capstone Report on the Application, Monitoring, and Performance of Permeable Reactive Barriers for Ground-Water Remediation", EPA/600/R-03/045a, http://earth1.epa.gov/ada/download/reports/600R03045A/600R03045a-02.pdf[dead link]
- ^ Staff (2006-06-27), "Water leak at nuclear reactor in Lakewood", The Cherry Creek News and Central Denver Dispatch, http://www.thecherrycreeknews.com/content/view/562/2/[dead link]
- ^ The Denver Post, 2006-06-27, http://www.thedenverpost.com/
- ^ Rocky Mountain News (2006-06-28), "Tank leaking small amount of radiation, USGS says", Denver Rocky Mountain News, http://www.rockymountainnews.com/news/2006/jun/28/tank-leaking-small-amount-of-radiation-usgs-says/
- ^ Francis, Jeff (2007-07-11), "Lakewood annexes, zones and vests Denver Federal Center-Some council members uncomfortable about 25-year vesting", MileHighNews.com, http://www.jeffconews.com/1editorialbody.lasso?-token.folder=2007-07-12&-token.story=197712.112112&-token.subpub=
- ^ "Denver Federal Center to Build Solar Park", PRNewswire-USNewswire, 2007-08-03, http://www.prnewswire.com/cgi-bin/stories.pl?ACCT=104&STORY=/www/story/08-03-2007/0004638961&EDATE=
Categories:- Government of the United States
- Lakewood, Colorado
- Economy of Colorado
- Buildings and structures in Jefferson County, Colorado
Wikimedia Foundation. 2010.