- A500 road
UK road routebox
road= A500
length-mi=
length-km=
direction= North - South/East-West (Part Circular)
start=Nantwich
destinations=Stoke-on-Trent
end= Clayton
construction-date= 1962
completion-date= 2006
junctions= ukmotorwaysmall|6
ukroadsmall|34
ukroadsmall|50
ukroadsmall|51
ukroadsmall|52
ukroadsmall|53
ukroadsmall|519
ukroadsmall|527
ukroadsmall|530
ukroadsmall|534
ukroadsmall|5020
ukroadsmall|5271|:"D road can also apply as a road designation under theGreat Britain road numbering scheme "The A500 is a major primaryA road inStaffordshire andCheshire , England. It isdual carriageway for most of its length and connectsNantwich , junctions 16 and 15 of theM6 motorway with the city ofStoke-on-Trent . Because of its shape between themotorway junctions, it is known locally as the D-Roadcite web |url=http://www.highways.gov.uk/roads/projects/7474.aspx |publisher=Highways Agency |month=June | year=2001 |title=Good news for Stoke |accessdate=2007-05-13] (D is also theRoman numeral representing the number 500). In 2004 the road was stated as carrying 60,000 vehicles a day through Stoke.cite web|url=http://www.highways.gov.uk/roads/projects/5360.aspx |title=A500 City Road & Stoke Road Junction Improvement - Statement of Case - Case for the Highways Agency |publisher=Highways Agency |accessdate=2007-05-13]It was built to provide links between Stoke-on-Trent and the M6, before being extended to Nantwich. Construction has taken place over several stages, beginning in 1962, with the final section of the original route being completed similar to the original plans in 2006. As a
trunk road it is maintained by theHighways Agency . [cite web |url=http://www.stoke.gov.uk/ccm/navigation/transport-and-streets-/roads/road-works/ |accessdate=2007-05-17 |title=Development of the A500 through Stoke-on-Trent |publisher=Stoke-on-Trent City Council]History
By the 1960s, traffic congestion was a major problem in Stoke-on-Trent with journeys across the area sometimes taking hours. There was no connection from the newly constructed M6 to the city. Business in the area wanted an easier route to get their goods out of the area.cite web |url=http://www.bbc.co.uk/stoke/content/articles/2006/11/07/a500_planning_feature.shtml |title=Making plans for the A500 |publisher=British Broadcasting Corporation |work=BBC Stoke & Staffordshire |accessdate=2007-05-14]
The A500 was initially built from the M6 at junction 16 to the
A34 road atTalke as part of the motorway construction,cite web |url=http://www.iht.org/motorway/m6birmpres.htm |work=The Motorway Archive |publisher=The Motorway Archive Trust |title=M6. Birmingham to Preston Motorway (J13 to J16) |accessdate=2007-05-14] opening in 1962.cite web |url=http://www.iht.org/motorway/m6biprstat.htm |work=The Motorway Archive |publisher=The Motorway Archive Trust |title=M6. Birmingham to Preston Motorway (J13 to J16) - Statistics and options. |accessdate=2007-05-14] At the southern end, a dual carriageway was constructed from junction 15 of the M6 to the A34 near Trentham and this was given the number A5006 which opened at the same time. The northern section of the road was then subsequently extended from Talke to theA53 road . The final section from the A34 in the south to the A53 junction was built between 1974 and 1977. The two middle junctions were to be grade separated, but due to financial constraints they were built asroundabout s.cite web |url=http://www.bbc.co.uk/stoke/content/articles/2006/11/07/a500_demolition_feature.shtml |title=Making way for the A500 |work=BBC Stoke & Staffordshire |publisher=British Broadcasting Corporation |date=2006-11-09 |accessdate=2007-05-13] Construction involved the destruction of streets and businesses within the town centre of Stoke as well as the excavation of amass grave of the victims of a 17th centurycholera epidemic . This final section was named "Queensway" and on completion of this construction, the whole route became the A500.The route remained unchanged until the 1980s when the Hanford Roundabout junction had a
flyover built as this was a major bottleneck for both the A500 and A34. The 1977 section east of this junction had been built with provision for the bridge, but the section built as the A5006 required realignment for the new interchange. In the late 1980s the road was extended from Junction 16 to close toWeston with connections provided to existing roads toKeele andCrewe . The A52, which at that time ran to Nantwich, was renumbered from Newcastle to Weston as a B road and the section from Weston to Nantwich was incorporated into the A500. In 1989 a bypass to the west of Nantwich was opened, extending the A500 from the south of Nantwich to its current northerly terminus with the A51. [cite web |url=http://www.opsi.gov.uk/si/si1989/Uksi_19890346_en_1.htm |title=The A51/52 North of Newcastle-under-Lyme-Nantwich-Tarporley-Tarvin Trunk Road (Nantwich Bypass) Order 1989 |publisher=HMSO |date=1999-02-22 |accessdate=2007-05-13]In 1993 a proposal was made to add the missing flyover and underpass close to
Stoke-on-Trent railway station , with another plan having already been dropped due to the cost. [cite web |url=http://www.highways.gov.uk/roads/projects/9684.aspx |publisher=Highways Agency |title=Project Background and Previous Options Considered |accessdate=2007-05-16] However due to a full review of the national roads programme, this scheme was suspended. In 1997 the A50 was rerouted through Stoke-on-Trent to meet the A500 at Sideway, where a new roundabout was constructed. On the approach toHough was a narrow single lane bridge which was added to with aBailey bridge in 1993. [cite web |url=http://www.highways.gov.uk/roads/projects/10140.aspx |publisher=Highways Agency |title=A500 Hough Railway Bridge |accessdate=2007-05-13] In September 2003, the Shavington bypass opened to reroute the road away from three villages on the former A52 section. [cite web |url=http://www.highways.gov.uk/roads/projects/5057.aspx |publisher=Highways Agency |title=A500 Basford, Hough, Shavington Bypass |accessdate=2007-05-13] This was built to dual carriageway standards with provision for further junctions to new development sites.Traffic continued to rise to the point where major congestion was experienced on the central section. Work began on 16 February 2004 on the A500 Pathfinder Project to replace the final two roundabouts in Stoke with underpasses. The Highways Agency defined the pathfinder project as involving "a new form of contract and co-operative working methods to deliver a better value project, faster." The project involved alterations to the path of the
Trent and Mersey Canal andRiver Trent , along with new provisions for pedestrians. The work was carried out byEdmund Nuttall Limited and was planned to be completed in Spring 2006. Following a number of delays [cite news |url=http://news.bbc.co.uk/1/hi/england/staffordshire/4788719.stm |publisher=British Broadcasting Corporation |work=BBC News |title=Compensation bid over A500 works |date=2006-08-13 |accessdate=2007-05-13] for which it was rumoured the construction company was being fined up to £100,000 a day for not keeping to schedule, the road opened on Tuesday 26th September 2006, with the southbound traffic in the morning and northbound traffic in the afternoon. [cite news |url=http://news.bbc.co.uk/1/hi/england/staffordshire/5380528.stm |publisher=British Broadcasting Corporation |work=BBC News |title=A500 opens again after roadworks |date=2006-09-26 |accessdate=2007-05-13] Several months of additional work was needed to finalise traffic light operations, gardens and other miscellaneous tasks.Route
The road is the primary access route for traffic to and from almost all areas of Stoke-on-Trent. Starting to the north west of Nantwich as the Nantwich bypass it heads to the west of the town crossing the A530 and A534. It then turns east onto the dual carriageway Shavington bypass running north of Hough and
Shavington . Returning to the 1980s single carriageway extension route it continues east through a cutting to the M6 at Junction 16 where it becomes a dual carriageway. Continuing through open countryside it passes under the A34 atTalke Pits , turns south before meeting theTunstall Western Bypass and enters the north of Stoke-on-Trent. Now continuing in an urban setting it runs between Newcastle and Burslem, passing through the middle of the formerWolstanton Colliery before running east of Stoke town centre. Passing through the newest section in a cutting it emerges south of Stoke alongside the site of the Victoria Ground. Turning west it passes theBritannia Stadium before leaving the urban area at Hanford, south of Trent Vale. It then runs through a cutting before meeting the M6 at junction 15.Junctions
:"*The route runs in a semi-circular direction in Stoke-On-Trent. The table has its northern terminus at the top"
References
External links
* [http://www.sabre-roads.org.uk/roadlists/r10/notes.php?number=A500 SABRE Roaders Digest - A500]
* [http://www.road-to-nowhere.co.uk/route-guides/A500.htm Road to Nowhere: A500]
* [http://www.highways.gov.uk/roads/projects/5340.aspx Highways Agency – Pathfinder Project Scheme]
* [http://www.a500.co.uk/ a500.co.uk - Contractor's Official Site]
*
Wikimedia Foundation. 2010.