- Portmadoc, Beddgelert and South Snowdon Railway
Infobox rail
railroad_name=Porthmadog, Beddgelert and South Snowdon Railway
gauge=RailGauge|23.5
start_year=1901
end_year=1910?
locale=Wales
hq_city=
successor_line=Welsh Highland Railway The Porthmadog, Beddgelert and South Snowdon Railway (PB&SSR) was a
narrow gauge railway intended to connectPorthmadog with theNorth Wales Narrow Gauge Railways link terminus atRhyd Ddu . Although some of the line was constructed between 1901 and 1906, it never opened and eventually became part of theWelsh Highland Railway .History
There were several attempts by the
North Wales Power and Traction Co Ltd to promote lines between Portmadoc and Beddgelert with extensions at either end. These culminated in a proposal in 1901, for a RailGauge|23.5 gauge electric railway to usethree phase alternating current at about 630 volts using the system devised byGanz ofBudapest .The PB&SSR would have run from the western end of Black Rock sands via Morfa Bychan, Borth y gest, Portmadoc and, using part of the
Croesor Tramway , to Beddgelert to link with the South Snowdon Quarries (hence the title) in the Gwynant Valley. There was no intention initially to connect with the North Wales Narrow Gauge system which, at that time, terminated at South Snowdon near the village of Rhyd Ddu.Ten electric locomotives were ordered from
Bruce Peebles & Co. Ltd. ofEdinburgh who held a licence from Ganz. At least six were built, although none were delivered. All six were scrapped during theFirst World War . The electrification project was abandoned about 1906 and a steam locomotive "Russell" was ordered from theHunslet Engine Company ofLeeds .The electricity was to be produced at a hydro electric power station further up the Gwynant Valley and surplus power was to be available for local domestic and industrial use. This part of the scheme was actually built and the power station still operates.
The
North Wales Power and Traction Co Ltd , the sole PBSSR backer, overspent on the construction of the power station. It started generating electricity in September 1906, but meanwhile, completion of the railway and electrifying the NWNGR took a back seat, and in January 1906J.C. Russell , Chairman and Managing Director of the NWNGR, insisted on terms for a two year delay which included expenditure on "restoring the NWNGR for present steam working and providing one steam locomotive for a sum not exceeding £2,500". This resulted in the arrival of Russell as NWNGR property. In the event this delay led to an abandonment.The PB&SSR and
North Wales Narrow Gauge Railways were later amalgamated and became theWelsh Highland Railway . Some work undertaken for the PB&SSR was used for the Welsh Highland Railway. The unused bridge by the Goat Hotel atBeddgelert and nearby bridge abutments in a field are some of the remains of the 1906 construction works.Additional information
No railway construction was started but by 1903 a revised scheme was being put forward to link up with the
North Wales Narrow Gauge Railways Beddgelert extension. This resulted in a further revised scheme being approved in 1904. It appears that there were legal problems with the powers given and in 1906 these were reapproved with amendments. Work started around this time and continued for a couple of years before being abandoned (certainly no work done after 1910). The line from Snowdon (Rhyd Ddu) was virtually complete for well over a mile and was used for a while (mainly during WW1) to extract timber from Beddgelert forest. At the Beddgelert end a roughly laid track for horse drawn wagons was also used for timber.The original intention to run to Black Rock had been forgotten and no mention was made of the line to South Snowdon quarries. However, in 1908 they did promote a further line up the Gwynant Valley and on to Betws y coed. No work was done on this line.
It was intended to electrify all the
North Wales Narrow Gauge Railways once the two lines were connected.In 1914 local councils got together to try to get the building restarted but failed due to the start of WW1. Another attempt was made after the war which resulted in the building of theWelsh Highland Railway following most of the same route but with changes made near Beddgelert to ease the gradients to allow the use of steam locos.References
*
*
* Dolgellau Record office document Z/CD/162 (1901 scheme), National Archives documents MT6/972/8 (NWNGR Beddgelert extension 1897), MT6/1367/11 & MT 54/435 (1903), MT6/1721 (1906), MT58/317 (1908) plus othersSee also
*
British narrow gauge railways External links
* [http://www.isengard.co.uk/PBSSR.htm A brief history of the PBSSR]